ML20024G934

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-346/91-07 on 910401-05.No Violations Noted
ML20024G934
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/24/1991
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
CENTERIOR ENERGY, TOLEDO EDISON CO.
Shared Package
ML20024G935 List:
References
NUDOCS 9105020161
Download: ML20024G934 (2)


See also: IR 05000346/1991007

Text

,

_

.

()c.;O

.

.

APR 2 41991

Docket No. 50-346

Toledo Edison Company

ATTN: Mr. Donald Shelton

Vice President

Nuclear-Davis-Besse

Centerior Service Company

'

c/o Toledo Edison Company -

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine safety inspection conducted by Mr. A. G. Januska

and lis. B. L. Hamrick of this office on April 1 - 5, 1991, of activities at

the Davis-Besse Nuclear Power Station, Units 1 authorized by NRC Operating

License No. NPF-3 and to the discussion of our findings with Mr. R. Scott

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection resort identifies areas examined during

the inspection. Within these areas, tie inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel,

in addition, our Mobile Laboratory was at the

3

site during the inspection to perform independent measurements of radioactivity.

i

No violations of NRC requirements were identified during the course of this

inspection.

,

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.9" 141n41 sigaod by V, L, n o2 ca

!

n

9105020161 910424

L. Robert Greger,-Chief

ADOCK O

36

Reactor Programs Branch

-

gDR

Enclosure:

Inspection Re

No.50-346/91007(DRSS) port

oI

See Attached Distribution

,

g V'oh

Rlli

Rill

R

Rlli

Ri l l --

J[nYsta/(p

dmfick

Sc umacher

w

G

m

t

r

m

.

.

Toledo Edison Company

2

APR 24 GG1

Distribution

cc w/ enclosure:

L. Storz, Plant fianager

DCD/DCB (RIOS)

OC/LTDCB

'

Resident inspector, Rlll

James W. Harris, State of Ohio

Robert E. Owen, Ohio

Department of Health

A. Grandjean, State of Ohio,

Public Utilities Connission

l

_

-

-