Responds to Noncompliance Noted in Re Tech Spec 6.5
ML20024G828
Person / Time
Site: Monticello 
Issue date: 06/15/1978
From: Wachter L
NORTHERN STATES POWER CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20024G824 List:
References
NUDOCS 9104300458
Download: ML20024G828 (1)


Text

L.h:

IM Y

1 l

ggy NORTHERN STATES POWER COMPANY

'tinneapolis, Minnesota 55401 June 15, 1978 Mr. Gaston Fiorelli, Chief Reactor Operations and Nuclear Support Branch Pagion III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Fiorelli:

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Your letter of May 25, 1978, identified an item which appeared to be in noncompliance with NRC requirements and requested that we reply within 20 days of receipt of your letter. The noncompliance, as stated, was:

O Contrary to Section 6.5 of the Technical Specifications, Administrative Control Directive 4 ACD 3.6 was not adhered to when on February 2, 1978, work activities authorized by Work Request Authorization 78-147 were extended beyond the scope of the approved WRA.

This infraction hes been discussed with the personnel involved and was discussed during the annual Q.A. training session for plant personnel. The philosophy of the WRA and the requirements of the directive were emphasized.

We believe that this action vill minimize the potential for similar occur-rences in the future.

Should you have any questions concerning our reponse, please communicate directly with the plant management.

Yourc very truly, g,s L.

. Wachter Vice President - Power Production and System Operation cc: