ML20024G803

From kanterella
Jump to navigation Jump to search
Discusses Rept on Instrument Line Excess Flow Check Valve Test Program
ML20024G803
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/27/1973
From: Mayer L
NORTHERN STATES POWER CO.
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 9104300429
Download: ML20024G803 (3)


Text

.

W @ latory N D'

~

NSE3 NORTHERN STATES POWER COMPANY MlN N E A PO U S. M1 85401 8

4's N

29 k

July 27, 1973 p\\.@ g r

~

/qi vy'f. '^.z'.

Bi Q % f'd

~

z.l t

1 1

1 O,j$

Mr. J F O' Leary, Director r

,/

Directorate of Licensing oy

/

United States Atomic Energy Commission ui

,/

Washington, D C 20545 s/

y

-s'

Dear Mr. O' Leary:

MONTICELLO NUCLEAR GENEPATING PIANT Docket No. 50-263 License No. DPR-22 Report on Instrument Line Excess Flow Check Valve Test Program This report is submitted in accordance with Section 6.7.C.9, Special Reports, of the Technical Specifications of the Provisional Operating License DPR-22.

A procedure has been developed for the periodic testing of the primary con-tainment instrument line excess flow check valves.

The procedure is included in the plant surveillance test program and is scheduled to be completed each refueling outage.

The excess flow check valves, model 50PM-8346 manufactured by Chemiquip Company, basically consist of a spring loaded slug in the flow path through the valve body.

The valves are designed so that at flow rates in excess of 2 gpm, the force on the slug overcomes the spring restraining force causing the slug to move forv rd onto a seating surface and check the flow.

In a line break condition, the differential pressure on the slug would keep the valve in the checked condition.

Some valve leakage is required in the checked condition, however, to assure that the differential pressure can equalize to reset the valve for test purposes.

The excess flow check valve test procedure was developed to demonstrate the following operability requirements:

(1) That each valve checks properly to limit the flow through the instrument line; (2) That the valve leakage rate in the checked condition is less than 2 gpm (2 gpm is the maximum checked leakage specified for the valve at a 1000 psi differential pressure);

C 7f)G 9104300429 730727 PDR ADOCK 05000263 P

PDR

~. _ _. _ _ _ _

l NOR*

.ERN OTATED POWER CC

'ANY

]

)

(3) That the valve leakage rate in the checked condition is greater than 0 gpm (to assure that the differential pressure can equalire),

e The check valve test is conducted during the operational 1000 psig hydro test of the reactor vessel following refueling operations.

Flow through each check l

valve is established by opening the sensing line at the instrument calibration tap and allowing the reactor water to blow down through the line. After an j

j initial surge of water, the checking action of the valve can be heard.

Once i

the valve has checked, the Icakage rate is monitored to verify that the greater 4

than 0 gpm, less than 2 gpm limits are satisfied.

The test is repeated a second time to verify that the. spring loaded slug is free and resetting prop-j erly. After all excess. flow check valves have been tested in the above manner, j

the reactor is depressurized and the instrument lines are.backflushed with demineralized water to cican crud, air bubbles, and contaminated reactor i

vater out of the lines.

Valves that fail to meet the Icakage requirements j

are removed for inspection.

Repaired or replacement valves are tested on a pressurized test stand before being returned to service.

1 Seventy-four excess flow check valves are subject to the test program.

Testing was conducted in accordance with the test procedure during the March,1973 i

refueling outage. ' All valves functioned correctly and leaked less than the 2 gym upper. leakage limit.

Seven. valves had zero leakage and consequently did not reset.

The seven valves were repaired and performed satisfactorily on retest.

The excess flow check valve test procedure described above does ' verify check valve operability and satisfies the testing requirement of the Technical i

Specifications. The procedure and detailed test results of the check valve -

l test procedure completed-during the March,1973 refueling outage are avail-able for review by the Regulatory Operations Inspector.

Yours very truly, I

L 0 Mayer, PE Director of Nuclear Support Services l

LOM/br 4

cc: B H Grier G Charnoff Minnesota Pollution Control Agency Attn. 4 Dzugan l

t l

l i

m.-.-

~.

.. ~....

AEC DI!

! BUTI O': FOR PART 50 DOCYJ.T MAT" 'AL (TDiPORARY FORM)

CONTROL NO:_

$796 FILE:

EOM:

DATE OF DOC DATE REC'D LTR PD10 RPT OTHER Northern States Power Company Minneapolis, Minnesota 55401 L. O_ Maver 7-27-7'l 7 *L n - 711 TO:

ORIG CC OTHER SENT AEC PDR J. F. O' Lea ry 1 signed 39 SDIT LOCAL PDR v

CLASS UNCLASS PROP INFO INPUT NO CiS REC'D DOCKET N0:

x 40 50-263 DESCRIPTION:

ENCLOSURES:

Ltr furnishing a report on instrument line excess flow check valve test program...

ACKNOWLEDGED DO NOT REMOVE PLANT NAME: Monticello FOR ACTION /INFORMATION 7-30-73 LE BUTLER (L)

SClN'ENCER(L) vfIDtANN(L)

REGAN(E)

W/ Copies W/ Copies W/7 Copies W/ Copies CLARK (L)

STOI;(L)

DICKER (E)

W/ Copies W'

Copies W/ Copies W/ Copies GOLLER(L)

VASSALLO(L)

KNIGHIVN(E)

W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)

SCIIDiEL(L)

YOUNGBLOOD(E)

W/ Copics W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION h_.GFIlh TECH REVIEW DENTON LIC ASST A/T IND 6'AEG FDR lENDRIE GRIMES BRC%'N (E)

BRAIIMAN M C, ROOM P-506A SCHROEDER GAMMILL MIGGS (L)

SALTaiAN 4UNTZING/ STAFF ACCARY KASTNER GEARIN (L)

CASE KNIGHT BALLARD COULBOURNE (L)

PLANS GIAMBUSSO PAWLICKI SPANGLER LEE (L)

MCDONALD BOYD SHA0 MAIGRET (L)

DUBE MOORE (L)(FMR)

W LLO ENVIRO SERVICE (L)

DEYOUNG(L)(PWR)

HOUSTON MULLER SHEPPARD (E)

INFO v5KOVHOLT (L)

NOVAK DICKER SMITH (L)

C. MILES P. COLLINS ROSS KNIGHTON TEETS (L)

IPPOLITO YOUNGBLOOD WADE (E)

_ REG OPR d DESCO REGAN WILLIAMS (E)

TILE & REGION (3)

LONG PROJECT LDR WILSON (L)

MORRIS LAINAS W TEELE BENAR0YA HARLESS VOLINER EXTERNAL DISTRIB" TIC'1 f//T pf - LOCAL PDR Minneapolis. Minn.

y I

A' - DTIE(ABEENATHY)

(1)(2)(9)-NATIONF LAB'S I-PDR-S AN/LA/NY V vt - NSIC(BUCllANAN) 1 - R. S c h oonr ak e r.0C, GT, D-323 1-GERALD LELLOUCHE 1 - ASLB(YORE /SAYRE/

l-R. CATLIN E-2;6-GT BROOKHAVEN NAT. LAB g

WOODARD/"ll" ST.

1 -CONSULTANT' S 1-AGMED(WALTER K0EST:

vM - CYS ACRS K5XXIKE SENT TO LIC ASST.

NEWMARK/BLUME/AGBABIAN KM-C-427-GT R. DIGGS 7-30 r3

1. GERALD ULRIKSON...ORNL vi-RD.. MULLER..F-309

_ _ _ _ _ _ _ _ _ _ _ _ -