ML20024G268

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-22,modifying Tech Specs to Require Inservice Insp & Testing to Be Performed Per Section XI of ASME Code Requirements
ML20024G268
Person / Time
Site: Monticello 
Issue date: 08/30/1977
From: Wachter L
NORTHERN STATES POWER CO.
To:
Shared Package
ML20024G266 List:
References
A00L-770830, AL-770830, NUDOCS 9102080450
Download: ML20024G268 (5)


Text

--___

9 o

s a

a, pi ll eo p

I UNITED STATES NUCLEAR REGUIATORY COMMISSION 3

4 NOR'DIERN STATES POWER COMPANY k

MONTICELLO NUCLEAR GENERATING PIANT jj Docket No. 50 263

-q REQUEST FOR AMENIMENT TO s

OPERATING LICENSE NO. DPR-22 l

- L (License Amendment Request Dated August 30, 1977)

Northern States Power Company, a Minnesota corporation, requests authorization for changes to the Technical Specifications as shown on the attachments labeled Exhibit A and Exhibit B.

Exhibit A describes the proposed changes along with reasons for the change. Exhibit B is a set of Technical Specification pages incorporating the proposed changes.

This request contains no restricted or other defense information.

NORTHERN STATES POWER COMPANY By

.<"~7 d6

^

L J Wachter Vice President, Power Production 6 System Operation On this 30th day of August 1977, before me a notary public in and for said County, personally appeared L J Wachter, Vice President, Power Production & System Operation, and first being duly sworn acknowledged that he is authorized to execute this document in behalf of Northern States Power Company, that he knows the contents thereof and that to the best of his knowledge, information and belief, the statements made in it are true and that it is not interposed for delsy.

l/

N Q

b D5bik$ 5.'HALVORh0N

~

NOT ARY PUsVC. MINNESOT A l l

i HENNEP!N COUNTY l

y of commawi tem oct io, iest [

e

a82588Mt GSjha P

i.-

9 o

IX11IBIT A M]NTICELID NUCLIAR GEEIATI!D PIANT DOCKHf NO 50-263 LICENSE AMENIHENT RWUIET DATED AUGUST 30, 1977 e

PROPOSED CHANGDI TO TE TECllNICAL SPECIFICATIONS APPENDIX A 0F OPERATING LICENSE DPR-22 Pursuant to 10 CFR 50, Section 50.59, the holders of Operating Licence DPR-22 bereby propose the following changes to Appendix A, Technien1 I

Specifications.

Le changeo should be iccued with an effective date of February 28, 1978.

1. Incervice Inrpection and Testing Prcy:rtun Proposed Change Revice the Technical Specificatione to require inservice inspection tu2d testin6 to confonn to the requiremente of 10 CFR 50, Section 50 55a.

Ecrer to the myiced Limiting Conditions for Operation arri Surveillance Requiremento contained in Exhibit B.

Rece changen implement 10 CFR 50, Section 50 55a by-

n. Eliminating existing surveillance requimments which are mdundant to the inspection and testing requirements of Section XI of the ASME lbiler arti Precoure Vessel Code.
b. AdM nc new rection 313/4.13 which requires increction and tecting to conform to the requiremente of 10 CFR 50, Section 50 55a. Beginning with the inspection period otarting February 28, 1978 incervice incpection and tening vill conform to the mquirements of Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda where practical. he incervice inspection and tecting program vill be upgmded at 20 and 40-month intervals as required by 10 CFR 50, Section 50 55a.

Requesto for devintion from the requiremento of Cection XI of the ASME Ccxte vill be submittei to the Commission.

Reason for Change This change is submitted in response to a letter dated April 28, 1976 from Mr. D. L. Ziemann, USNBC, to Mr. L. O. Mriyer, NSP. %i0 letter dimeted NSP to submit a License Amendment Request to modify the l

Technien1 Specifications to requim incervice inspection and testing l

1

... ~

,s

'J I

')

u v

DOIIBIT A a

2 to be perfomed in accordance with the examination and testirc requirements set forth in Section XI of the ASME Boiler and pressum Vessel Code and applicable Addendu.

The proposed changes remove the conflicts between the current surveillance requirements and the mquiremnts of Section XI

\\

of the ASME Code (1974 edition and addenda thmugh Summer 1975).

10 CFR 50, Section 50 55a(g) requires, where practical, that the program of inservice inspection and testirg confom to editions of the (bde and addenda in effect no more than six l

months prior to the start of each inspection period.

Ee 1974 edition of the Code and addenda thror Summe-1975 are the latest version of Section XI to be.

into effect by the Commission. Genemlized wording has t na used in the revisions co that futule changes to the program conforming to 10 CFR 50, Section 50 55a, can be made without the need for additional changes to the Technical Epecifications.

he proposed wording in this change requent generally confoms to the suggested wording contained in Mr. Ziemnn's letter of April 28, 1976 with the following exceptions:

a. NRC Quality Groups have been aced to classify components.

Clascifyirg componenta by ACIE Code Class for purposes of inspetion and testing could be done, however it nay imply that these components satisfy other requirements of the ASME Code Classes.

The mjority of

?bnticello components were installed before Code Classes vem t.dopted by the ASME Code,

b. Tha wording in the proposed changes states that inspection and testing vill confom to Section XI of the ASME Code "... except where mlief has been requested frcs the Commission pursuant to... " rather than

"... except whe re specific written relief has been granted by the NRC pursuant to

...." This wordire change pemitsSection XI requirements which are impossible to comply with to be excluded from the testing program immediately upon discovery without violating the Technical Specifications.

Following discovery of an impassible or ir:pmetical requimment, the Commission vill be notified and infomstion vill be submitted to support our detemination.

If, as a result of thier review, the Commission rejects the proposed deviation they can order the necessary plant modi-fications or procedural changes.

In the interim, the requested devintion vill be assumed to be acceptable.

~ '

~ ;

.. '.l! T

~

..T

.L.'

c.

~

O o

>=

INHIBIT A '

on for Chance (Continued)

Deviations from the pml ased wording contained in Mr. Zierann's letter are necessary to pemit a workable Section XI inspection and testing program to be backfit to the hbnticello plant.

9, i

Safety Evaluation his change is being submitted at the request of the Comission.

The proposed changes will require future inservice inepection and testing to conform to the current ASMS Section XI requirements where practical.

h is vill permit improvements in inspection and testing techniques to be incorporated at regular intervals in the Manticello inservice inspection and testing program.

Implementation of these changes vill substantially increase the scope of inservice inspection arut testing at Fbnticello over what was originally contemplated.

This vill generally resalt in an enhancenent of the inservice inspection rad testing program.

herefore these changes do not involve a significant hazards consideration and do not adversely affect the comon defense and security or the health and safety of the public.

2. Renumbering of Pages Propoced Change The proposed changes in (1) above delete Table 4.6.1 which is currently in the Technical Specifications (pages 124 - 129).

I Ve ask that existing pages 121A - 121C,122,122A - 122C, and 123 be renumbered as pages 122 - 129.

Refer to Exhibit B which contains the proposed renumbered pages.

i Beacon for Change l

This change would eliminate the gap in page numbering created by the deletion of Table 4.6.1.

I Safety Evaluntion No changes to the Technical Specifications are involved. Only page numbers would be revised.

P 1

l i

I

.. ~

9 o

EXIIIBIT A i

k.

3. Table of Contents, List of Figures, and List of Tables Propored Osnge Bevise the Table of Contents, List of Figures, and List of Tablee i

for the Appendix A Technical Specifications to reflect changes (1) and (2) above and to correct a number of minor errors.

to Exhib).t B pages 11, iii, v,v11, and tx.

Eefer Benson for Change l.

i These changes am required to update the Table of Contnents, List of Figures, and List of Tables.

Safety Evaluation No changes to the Technical Specifications are involved, I

n-e g 7

,-%g_

--r-c-

mm y

- - - - -,