ML20024F673

From kanterella
Jump to navigation Jump to search
Forwards LERs 83-042/03L-0 & 83-031/03L-0
Date released: 02/07/2020 Download: ML20024F673


LER 83-031/03L-0:on 830806,during Testing,Instrumentation Channel Associated W/Level Transmitter LT-474 Declared Inoperable.Caused by Setpoint Drift of Comparator Card.Card Adjusted & Instrumentation Channel Declared Operable
ML20024F684
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1983
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20024F684 (1)
LER 83-042/03L-0:on 830802,post-LOCA Hydrogen Recombiner 1A Declared Inoperable.Caused by Failure of Temp Indicator.New Indicator Installed & Declared Operable
ML20024F678
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1983
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20024F678 (1)
Forwards LERs 83-042/03L-0 & 83-031/03L-0
ML20024F672
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20024F672 (1)