ML20024F405

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 83-05, ASME Nuclear Code Pumps & Spare Parts Mfg by Hayward Tyler Pump Co. No Subj Pumps or Spare Parts Installed or Planned for Installation
ML20024F405
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/16/1983
From: Causey J
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-83-05, IEB-83-5, NED-83-429, NUDOCS 8309090349
Download: ML20024F405 (1)


Text

-_

Georg1a Power Company 333 Piedmont Avenue Attanta. Georgia 30308 Telephone 404 526-7895 Maihng Address:

Post of fice Box 4545 gR Atlanta, Georgta 30302 Georgia Power the sout?em electuc system Ice re3Ident NrD-83-429 Fossil and Hydro Generation August 16, 1983 U. S. Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement I&E HQ: RCD Region II - Suite 2900 50-321/50-366 101 Marietta Street, NW I&E Bulletin Atlanta, Georgia 30303 83-05 ATTENTION: Mr. James P. O'Reilly GENTLEMEN:

In a letter dated May 13, 1983, Mr. Richard C. DeYoung, Director, Office of Inspection and Enforcement requested reactor power facilities to take appropriate actions concerning I&E Bulletin 83-05, "ASME Nuclear Code Pumps and Spare Parts Manufactured by the Hayward Tyler Pump Company (HTPC)," if they use or plan to use ASME nuclear code pumps or related spare parts provided by HTPC. We hereby submit the following response to that request.

A review of the ASME nuclear class 1, 2, and 3 pumps was conducted for Plant Hatch, Units 1 and 2, and it was determined that none of the specified pumps or spare parts manufactured or provided by HTPC are installed or are planned to be installed at Plant Hatch.

Therefore, it was not necessary to conduct the special inservice tests, nor was it necessary to take the additional actions requested in your letter.

Should you have any further questions in this regard, please contact this office.

J. C. Causey states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

C40RGIAPOWERCOMPANY By * ('

A n (L swsd J. C. Causey Sworn t and subscribed before me this 16th day of August,1983.

-C L

}

y No Public

~'

CT/

Notary Pub!ic, Geore;3,3,,,,,, g,,,,

Enclosure "Y C ""'"toa Wru Mr a, ins xc:

J. T. Beckham, Jr.

H. C. Nix, Jr.

U. S. Nuclear Regulatory Commission-Document Control Desk Washington, D.C.

Senior Resident Inspector - Plant Hatch 9

8309090349 830816 PDR ADOCK 05000321 G

PDR gg