ML20024F403
| ML20024F403 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 08/29/1983 |
| From: | Bachmann R NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| To: | Bloch P, Paris O, Shon F Atomic Safety and Licensing Board Panel |
| References | |
| NUDOCS 8309090346 | |
| Download: ML20024F403 (3) | |
Text
~
August 29, 1983 Peter B. Bloch, Chairman Dr. Oscar H. Paris Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Washington, D.C.
20555 Mr. Frederick J. Shon Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Comission Washington, D.C.
20555 In the Matter of CONSUMERS POWER COMPANY (Big Rock Point Plant)
Docket No. 50-155 (Spent Fuel Pool Modification)
Dear Administrative Judges:
This letter contains information concerning previously filed Staff testimony, requested by intervenor John O'Neill in his " Motion for Orderly Presentation of Testimony," filed on August 11, 1983.
I have been informed by Judge Bloch on August 17, 1983 that Mr. O'Neill's motion has been granted.
NRC Staff Testimony Contention (s)*
File Staff Addressed Date Witness (es)
Remarks 9(2)-(5),(7) 5/10/82 Danny Bement [ FEMA]
Examined at 6/82
[ Emergency Planning]
hearing 9(1),(4),(8),
5/10/82 Thomas McKenna Deferred-(Tr. 2086-88)
(9) expect new witness Contentions listed with arabic numbers were propounded by Christa-Maria, et al.; those with Roman numbers, by John O'Neill.
4 90qi 8309090346 830829 PDR ADOCK 05000155 G
a
. Contention (s)*
File Staff Addressed Date Witness (es)
Remarks 9(2),(3),(6),
5/10/82 Jesse Pagliaro Withdrawn-(Tr. 2085-86)
(7) except for (6) issues ex-amined at 6/82 hearing (other witnesses) with exceptionof9(6)which was deferred II.E-3 5/10/82 Edward Lantz Examined at 6/82
[ Criticality]
hearing 8 & II.E-2 5/10/82 Fred Clemenson &
Examined at 6/82 hearing.
[TMIissues]
Richard Emch (Herringadditional
[ issues 1 & 2]
witness).
Issues within Paul Shemanski this contention still to
[ issue 3]
be resolved: reliability of makeup line; structural capability of concrete at high temperatures II.C 5/14/82 Fred Clemenson Examined at 6/82 hearing.
[ Cask and crane Ian Sargent Seismic crane issue drop]
D. J. Vito deferred.
Richard Emch G.II.(a) 12/3/81 Walter Paulson Sponsored by Emch (and
[ Administrative Vito); examined at 6/82 Controls]
hearing VIII 5/10/82 Richard Emch Examined at 6/82 hearing
[NEPA]
[EIA dated 5/13/81, Jack Donohew revised 5/10/82]
2 & II.A 5/10/82 Seymour Block Not examined at 6/82
[SouthWall]
hearing II.D 5/10/82 Kazimieras Campe Not examined at 6/82
[B-52 crash]
hearing II.E.4 (12/3/81)
(JackDonohew)
Wohl's testimony re-
[ Containment placed Donohew's Shielding]
5/10/82 &
Millard Wohl Not examined at 6/82 5/21/82(amended) hearing N/A 5/10/82 Richard Emch Introduced into evi-
[SER]
dence at 6/82 hearing
~
... Contention (s)*
File Staff Addressed Date Witness (es)
Remarks II.C 5/21/82 Kenneth lierring Withdrawn
[ Seismic Crane Analysis]
8 & II.E.2 5/21/82 Kenneth Herring Withdrawn
[ Concrete]
II.E.3 6/1/82 Edward Lantz Response to Licensing
[ Criticality]
Richard Emch Board questions re natural circulation The Staff intends to sponsor testimony on the remaining issues to be litigated, as specified in Mr. Gallo's letter to the Licensing Board of June 17, 1983. The Staff has not yet determined whether testimony will be refiled or who will be the sponsoring witnesses.
Sincerely, Richard G. Bachmann Counsel for NRC Staff cc: Philip P. Steptoe, Esq.
Michael I. Miller, Esq.
Joseph Gallo, Esq.
John O'Neill, II Christa-Maria Ms. JoAnne Bier Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Panel Board Panel Judd L. Bacon, Esq.
Mr. Jim Mills Docketing and Service Section DISTRIBUTION Bachmann Goddard Reis A. Smith (2)
OELD FF (2)
Chron NRC Docket File: NR/LPDR Christenbury Murray Olmstead Lieberman R.Emch DS07 D
_ f _ __Nel_*b..f
______M_____:.________________l._________________________
NAME :RBachmann/dkw" :EReis [
DATE :08/7//83
- 08/2}/83
-