ML20024F402
| ML20024F402 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/11/1983 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| REF-SSINS-6820 IEB-83-05, IEB-83-5, NUDOCS 8309090345 | |
| Download: ML20024F402 (1) | |
Text
,
W M;iling Adfrro Alabama Power Company 600 Nortn 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.
Senior Vice President Flintndge Budding AlabamaPower rw sourwn etet nm, m August 11, 1983 0
- ' r
y V:
Docket Nos. 50-348 E
',- T 50-364 p
(
Mr. James P. O'Reilly, Regional Administrator 25
(!
U. S. Nuclear Regulatory Commission 2
Region II, Suite 3100 W
101 Marietta Street N.W.
W Atlanta, GA. 30303
Dear Mr. O'Reilly:
I. E.Bulletin 83-05, entitled "ASME Nuclear Code Pumps and Spare Parts Manufactured by the Hayward Tyler Pump Company," requested each licensee to determine whether any Hayward Tyler pumps or spare parts were used in safety related applications.
In accordance with this request, Alabama Power Company has conducted a review of procurement documentation for both Farley Nuclear Plant Unit 1 and 2.
As a result of this review it was determined that neither Hayward Tyler pumps nor pump spare parts were procured or utilized in either Unit 1 or 2 of Farley Nuclear Plant. In i
I addition, Alabama Power Company currently does not have any plans to utilize any Hayward Tyler pumps or spare parts.
If you have any questions, please advise.
Yours very truly, F. L. Clayton J r.
F FLCJr/RWS:ddr-036 SWORN TO AND SUBSqRIBED BEFORE ME cc:
Mr. R. A. Thomas THIS ll DAY OF 4 anol-
, 1983 Mr. G. F. Trowbridge
~0 Mr. S. A. Varga (f
Mr. E. A. Reeves Cttkd(c Ulle )
Mr. W. H. Bradford Notary Public NRC Document Control Desk My Commission Expires 8309090345 830911 l -l 0 -8'1 PDR ADOCK 05000348 Ih/ \\k O
/