e O Power CollSumBIS
.cm l
Vice President - Projects, Engineering and Construction General offices: 1945 West Parnen Road, Jackson, MI 49201 * (517) 78&OJ53 August 31, 1983 82-08 #5 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR C0 GENERATION PLANT DOCKET NOS 50-329 AND 50-330 UPGRADE OF B&W NON-SEISMIC TRANSMITTERS MOUNTING BRACKETS FILE:
0.4.9.64 SERIAL:
23782
References:
J W Cook letters to J G Keppler, Same
Subject:
(1) Serial 17538, dated July 2,1982 (2) Serial 17591, dated August 31, 1982 (3) Serial 19095, dated November 15, 1982 (4) Serial 22186, dated May 6, 1983 This letter, as were references 1, 2, 3 and 4, is an interim 10CFR50.55(e) report concerning the installation of B&W-supplied, non-seismically qualified transmitter mounting brackets for transmitters forming part of the reactor coolant pressure boundary.
The assumption of multiple failures of these brackets and their corresponding transmitters during a seismic event could result in an unanalyzed plant condition. As explained in reference 2, the resolution of this concern is to be accomplished by replacing the non-seismically qualified mounting brackets with seismically qualified mounting brackets and demonstrating that the structural integrity of the existing transmitters mounted on the replacement brackets is not compromised during a seismic event.
CPCo has received a draft field change authorization (FCA) from B&W describing the seismic qualification of the existing transmitters with the replacement b ackets. To resolve Bechtel comments on seismic qualification curves, B&W has further extended the submittal date for the final FCA to l
September 15, 1983. Our present schedule requires the qualified replacement brackets to be shipped to the site and installed with transmitters prior to initial fuel load.
Replacement bracket qualification will be documented by closcout of Consumers Pcwer Company NCR M01-9-2-065.
p i
b B309090288 830831 PDR ADOCK 05000 cp OC0883-0024A-MP01 S
I 1 9 7 97i
r-a e
2 Serial 23782 82-08 #5 Another report, either interim or final, will be sent on or before October 28, 1983.
WRB/WRS/cd CC: Document Control Desk, NRC Washington, DC RJCook, NRC Resident Inspector Midland Nuclear Plant CBechhoefer, ASLB Panel LBernabei, GAP FPCowan, ASLB Panel JHarbour, ASLB Panel
-AS&L Appeal Panel MMCherry, Esq MSinclair BStamiris CRStephens, USNRC WDPaton, Esq, USNRC FJKelley, Esq, Attorney General SHFreeman, Esq, Asst Attorney General WHMarshall GJMerritt, Esq TNK&J INP0 Records Center r
i 1
OC0883-0024A-MP01
-.