AVERAGE DAILY UNIT POWER LEVEL d

  • ' +

+

DOCKET NO.

___5 0 ~l 3 3 UNIT 11BPP 113 DA1E S-2-93 COMPLETED 11Y A J. BE/2 RI 787,/99S-27/7 TELEPilONE MONili Jiu Y DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

O!We-Neo I

17 2

gg 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 II 27 12 28 I3 29 14 30 IS 33 gg 16 v

INSTRUCTIONS On this format list the average daily unit power levelin MWe Net for e.ich day in the reporting month. Compute to the nearest whole megawatt.

(9/77 )

ny 8309000217 830002 PDR ADOCK 05000133 PDR R

O

4 OPERATING DATA REPORT DOCKET NO.

18~/83 DATE 9-2-83 COMPLETED BY P. S.A 64 t.5 TELEPl!ONE 707/949-2787 OPERATING STATUS

1. Unit Name:

NU M M-or Env ?ow M $MT-fibhr3 N*t

2. Reporting Period:

~7 LI L.Y

/983

3. Licensed Thermal Power (MWr):

220

4. Nameplate Rating (Gross MWe):

6_.5_

5. Design Electrical Rating (Net MWe):

66

6. Maximum Dependable Capacity (Gross MWe):

66

7. Maximum Dependable Capacity (Net MWe):

6S S. If Changes Occur in Capacity Ratings (items Nuraber 3 Through 7) Since I.ast Report, Give Reasons:

A//A

9. Power LeselTo Which Restricted if Any(Net MWe): __ ! d
10. Reasons For Restrictions. If Any:

M/A This Month Yr to-Date Cumularise I1. Ilours In Reporting Period 74'/

5097 J7S7.9t)

12. Number Of !!our> Rea:: tor was Critical O

o

?6l7/

~ 13. Reactor Reserve Shutdown llours O

O O

14. Ilours Generator On.Line O

O 97262.

15. Unit Reserve Shutdown llours O

o O

16. Gross Thermal Energy Generated (MWil)

O M

/6 dl6,'/54

17. Gross Electrical Energy Generated (MWil) '

O o

'/,737,732

18. Net Electrical Energy Generated (MWil)

O O

'/,5J~/. s 27

19. Unit Senice Factor O

o 55.5#/o

20. Unit Availability Factor O

o 55.5 %

21. Unit Capacity Factor (Using MDC Net) -

o O

'/I. i "/o

22. Unit Capacity Factor (Using DER Net)

O O

37 6 */*

23. Unit Forced Outa;e Rate O

d

/. 9/ #/o

24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):

M J~A/OE7-E4M/ MATE

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation);

Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER \\ TION (9/771

.__.... _ ~ _...--. _ __.. _ _.. _.

s 80-/S S

  • DOCKET NO.

UNITSilUTDOWNS AND P, WER REDUCTIONS 0

UNIT NAME

  1. FF# # 3 DATE f-2-SM COMPLETED BY F J OFA*rs REPORT Sf 0NTil _ 7u ty TELEPl!ONE 7a7NV3-77/17 "i

c n

3 -s =

5 3e 8

-o54 L.icensee ge c9, Cause & Corrective o

N,o.

Date g

gg

,g g 5

-Event pe E3 Action to o

H

$E 5

3@g Report n

,2 0 gu Prevent Recurrence u

3C 7b~6 7b o 7 a 2.

S 7%

Us H

/

N/A S5 is nuc. moot pic A7?ons I

2 3

4 F: Forced Reason:

Method:

Exhibit G Instructions Sr Schedu!ed A Equipment Failure (Explain) 1 Manual for Preparation of Da:s B-Maintenance of Test 2-Man ual Scra m.

Entry Sheets fe' L.:ensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161)

E Operator Training & License Examinatien F Administrative 5

G Operational Error (Explain)

Exhibit ! Same Source (W77) 11 Other (Explain) t

e MONTilLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of July 1983. This report was prepared by the Plant Staff and is submitted in accordance with Section IX:I.1.c. of the Technical Specifications.

During the reporL period the reactor remained in the cold shutdown mode of operation. There were no significant events associated-with the operation of the Unit.

There was no significant maintenance completed during the month.

E I

i t

l l

l

T.

V PACIFIC OAS AND E LE C T RIC C O M PANY 3D(bb'3WU3 l

1034 SIXTH STREET. EUREKA, C ALIFo R NI A 95501 (707) 443 2787 E. D. WE EKS PLANT BuPf alNTENDENT NUCLEAR PLANT OPERAtto's5-**Uwe0LDT 8eUCLEAR POWEA GENERATCM August 3, 1983 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-133 License No. DPR-7 Gentlemen:

Enclosed are the completed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for July,1983. These forms and the narrative are submitted in accordance with Section IX I.1.c of our Technical Specifications.

Sincerely 3, (fkb(4$AG4 E. D. Weeks Plant Superintendent Humboldt Bay Power Plant 1034 Sixth Street i