o OPERATING DATA REPORT (JUNE REVISION)
DOCKET NO.
50-336 DATE COMPLETED BY J. Gibson TELEPHONE (203) 447-1791 Ext. 4431 OPERATING STATUS 1.
Unit Name:
Millstone 2 Notes: Items 21 and 22 cumulative 2.
Reporting Period:
June 1983 (Revision) are weighted ave, unit 3.
Licensed Thermal Power (MWt):
2700 operated at 2560 MW 4.
Nameplate Rating (Gross MWe):
909 thermal prior to its 5.
Design Electrical Rating (Net MWe):
870 uprating to its current 6.
Maximum Dependable Capacity (Gross MWe):
895*
2700 MW thermal power 7.
Maximum Dependable Capacity (Net MWe): 864*
1evel.
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 720 4343 65855 12.
Number Of Hours Reactor Was Critical 0
3130.5 48365.3 13.
Reactor Reserve Shutdown Hours 0
0 2205.5 14.
Hours Generator On-Line 0
2994.9 46182.2 15.
Unit Rererve Shutdown Hours 0
0 468.2 16.
Gross Thermal Energy Generated (MWH) 0 7877464 13171669 17.
Gross Elec. Energy Generated (MWH) 0 2575530 37806378 18.
Net Electrical Energy Generated (MWH) (-3011)**
2471358.3**
36233171**
19.
Unit Service Factor 0
69.0 70.1 20.
Unit Availability Factor 0
69.0 70.8 21.
Unit Capacity Factor (Using MDC Net) 0 65.9*
65.9*
22.
Unit Capacity Factor (Using DER Net) 0 65.4 65.0*
23.
Unit Forced Outage Rate 0
13.7 19.1 24.
Shutdgwns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Continuation of Refuel / Maintenance Outage 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
- Corrects math error in original June report.
f$h$o O
R
.