ML20024F007
| ML20024F007 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 08/09/1983 |
| From: | Batterson S, Groce R Maine Yankee |
| To: | Hartfield R NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| MN-83-171, NUDOCS 8309080108 | |
| Download: ML20024F007 (5) | |
Text
I I 'A;
.N
,pe%
(
k' 1671 WORCESTER RO AD kfe {i;'
/
ENGINEERING OFFICE FRAMINGH AM, M ASSACHUSETTS 017o1 ei7 872 etoo O
m er,r.
August 8, 1983 MN-83-171 17.R4.2 Office of Resource Management United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Mr. Richard A. Hartfield, Chief Management Information Branch
References:
(a) License No. DPR-36 (Docket No. 50-309)
(b) NUREG-0020, Licensed Operating Reactors Status Summary Report
Subject:
Maine Yankee Monthly Statistical Report
Dear Sir:
Enclosed you will find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for July,1983.
Very truly yours, MAINE YANKEE ATOMIC POWER COMPANY l
hC R. H. Groce l
Senior Engineer - Licensing l
f RHG/ds Enclosures l
l cc:
Mr. Robert A. Clark l
Dr. Thomas E. Murley Mr. Paul D. Swetland 0}
og&
q7
- 1a d
9 j W 'a "
4 8309080108 830809
{DRADOCK 05000309 PDR
}
l
I t.'
s.
OPERATING DATA REPORT DOCKET NO. 309 DATE 830809 COMPLETED BY S.
Batterson TELEPHONE (617)872-8100 OPERATING STATUS Maine Yankee Notes
- 1. Unit Name:
Julv 1983 2.' Reporting Period:
2630
- 3. Licensed Thermal Power (MWt):
864
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Electrical Rating (Net MWe):
850
- 6. Maximum Dependable Capacity (Gross MWe):
810
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Ressons For Restrictions.If Any:
This Month Yr..to.Date Cumulative 744.00 5.087.00
- 11. Hours In Reporting Period 744.00 4,259.60 75,481.34
- 12. Number Of Hours Reactor Was Critical 0.00 0.00 o,og
- 13. Reactor Reserve Shutdown Hours 744.00 4,208.10 72,968.13
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1,924,088.00 10,501,724.00 161.343,746.00
- 17. Gross Electrical Energy Generated (MWH) 617.310.00 3.429.240.00 52.851.300.00
- 18. Net E!ectrical Energy Cenerated (MWH) 597.647.00
~4.115.479 00 so 999 471.00 100.00 82.72 77.62
- 19. Unit Service Factor 100.00 85.79 84.10
- 20. Unit Availability Factor 99.17 80.46 68.31
- 21. Unit Capacity Factor (Using MDC Net) 97.37 79.00 66.34 l.
- 22. Unit Capacity Factor (Using DER Net) 0.00 17.28 7.26
- 23. Unit Forced Outage Rate -
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.snd Duration of Esch):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Ststus (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY j
INITIAL ELECTRICITY COMMERCIAL OPERATION
'(9/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-309 UNIT _ Maine Yankee DATE 830809 S. Bat tenon COMPLETED BY TELEPHONE (6171872-8100
'"IY IOO MONTH
. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 1 818 17 819 816 815 2
Ig 815 3
4 813 20 802 812 21 5
815 818 6
22 OII 7
23 g
816 24 819 816 818 9
25 817 10 26 11 821 27 814 820 814 12 28 820 8II 13 29 14 30 815 623 818 31 i
15 8I9 16 INSiRUCTIONS
~
On this format list the aserate daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
1 (9/77) 1
~
I
UNIT SilOTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-309 UNIT N AhlE Maine Yankee DATE 830809 COhlPLETED fly S.
Batterson REPORT A!ONTil July 1983 TELEPil0NE (617)872-8100 c
.! E 3
$.Y E Licensec E
D'8 Cause & Connective No.
Date R
E8 2s&
Event u7 a.
Action in H'
g$ 5 5
5 di C Repull #
NU SU Psevent llecurrence e
O o
LR to 830719 F
0 B
4 NA lill llTEXCll-D Reduced power due to Cl-intrusion.
75%
Plugged tubes in "C" condenser waterbox.
LR to 830720 F
o B
4 NA lill llTEXCI;-D Reduced power due to Cl-intrusion.
75%
Plugged tubes in "C" condenser waterbox.
LR to 830731 F
0 B
4 NA lill IITEXCil-D Reduced power due to Cl-intrusion-75%
Plugged tubes in "C" condenser waterbox.
I 2
3 4
F: l'ou ed Iteason:
h1cthod:
Exinbit G. Inst:uctions 5: St hed nied A Equipment Failure (Explain) 141anual for hen. nation of Data
!!41aintenance niTest 74tanual Serain.
Entry Sheets t'on 1.icensee C Itcfueling; 3 Aut nnatic Scrain.
Evens Rcrini (1. lilt) I'de INUltEG-D Regulatmy Restriction 4-Oiher (lixplain) 0161)
E.Opciator Training & License Examinailun 1: Adminisseative 5
G O weational I so.: (limpi.on) 1:=lubit I Same Sonice t
08/17)
Il.(lihes (!!xpl.iin)
?
e t
4 DOCKET NO.
50-309 UNIT Maine Yankee DATE 830809 COMP 1.ETED BY S. Batterson TELEPHONE (617)872-8100 t
REPORT MONTH July 1983 SU'S!ARY OF OPERATING EXPERIENCES The plant was at 100% power at the beginning of the month.
On July 19, power was reduced to 75% for Cl-intrusion and turbine valve testing.
On July 20, increased power to 96%.
On July 20, reduced power to 75% for Cl-intrusion.
i On July 21, increased power to 100%.
On July 31, reduced power to 75% for Cl-intrusion and' turbine valve testing.
l The plant was increasing power at the end of the month.
h i
I i
.