ML20024E979
| ML20024E979 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/29/1983 |
| From: | Drummond F LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| W3183-0291, W3183-291, NUDOCS 8309080058 | |
| Download: ML20024E979 (1) | |
Text
LOUISIANA P O W E R & LI G H T! P O BOX 6008 *
,42 o nAnoNot sineer (504) 366-2345 NEW ORLEANS. LOUISIANA 70174
'$ uS $ EsS $
u August 29, 1983 W3183-0291 Q-3-A35.07.83 Mr. Joun T, Collins Q ]g If 7 ?
Regional Administrator, Region IV 4
U. S. Nuclear Regulatory Commission 9
p$ 3 f,) @
611 Ryan Plaza Drive, Suite 1000 d
1 f
Arlington, Texas 76012 U-SUBJECT? Waterford SES Unit No. 3 Docket No. 50-382
~~
"~
Significant Construction Deficiency No. 83
" Heat Tracing Design Deficiencies Identified.
Luring Hot Functional Testing" Second Interim Report
REFERENCE:
LP&L Letter W3I83-0188 dated May 24, 1983
Dear Mr. Collins:
The above referenced letter indicated submittal of a Final Report to the USNRC no later than August 26, 1983.
The completion of the corrective action is currently scheduled for December 1, 1983. A Final Report will therefore be submitted to the USNRC by January 6, 1984.
Very truly yours,
= - - - _ _ _
F. J. Drummond Manager, Engineering & Technical Services cc:
1)
Director 3)
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 2)
Director 4)
Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8309080058 830829
_ _ 27 /fo PDR ADOCK 05000382
'""