Informs That Schedule for Response to Generic Ltr 83-28 Will Be Submitted by 831130.Info Required from Westinghouse Owners Group Re Generic Solution
ML20024E959
Person / Time
Site: Beaver Valley
Issue date: 09/02/1983
From: Woolever E
DUQUESNE LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
2NRC-3-069, 2NRC-3-69, GL-83-28, NUDOCS 8309080036
Download: ML20024E959 (1)


Text

2NRC-?-069 (412)787-5141 Telecopy(4 2) 8-Nuclear Construction Division September 2, 1983 Robinson Plaza. Building 2, Suite 210

' Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Washington, DC 20555

' ATTENTION: -Mr. Darrel1 C. Eisenhut Director, Division of Licensing

SUBJECT:

. Beaver Valley Power Station - Unit No. 2 Docket No. 50-412

- Required Act ion Based on Generic Implications of Salem. ATWS Events Generic Letter 83-28 Gentlemen:

Duquesne Light Company (DLC) received your Generic Letter 83-28 dated

. July 8, 1983.

In. orde r to plan the res ponse to the issues raised by this letter, information Lwill be required from the. Westinghouse Own e rs ' Group conce rning the generic solution to some of these issues.

The need for this informat ion, as well as the need to fo rmula t e a coordinated program within Dif, means that the schedule for act ion in response to your letter will not be available before November.

Therefore, DLC will submit the sched ule fo r Beaver Valley Power Station Unit 2 by November 30, 1983.

DUQUESNE LIGHT COMPANY i

By E/ J.'Wooleve r Vice President KAT/wjs cc:

Mr. G. Walton, NRC' Resident. Inspector l

Ms. L. Lazo, Project 'Managaer l

NRC Document Control Desk i-l I

e3o9080036 830902 L

PDR ADOCK 05000412 A

PDR I

I 1

I; O t

L

~a

-.a