2NRC-?-069 (412)787-5141 Telecopy(4 2) 8-Nuclear Construction Division September 2, 1983 Robinson Plaza. Building 2, Suite 210
' Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Washington, DC 20555
' ATTENTION: -Mr. Darrel1 C. Eisenhut Director, Division of Licensing
SUBJECT:
. Beaver Valley Power Station - Unit No. 2 Docket No. 50-412
- Required Act ion Based on Generic Implications of Salem. ATWS Events Generic Letter 83-28 Gentlemen:
Duquesne Light Company (DLC) received your Generic Letter 83-28 dated
. July 8, 1983.
In. orde r to plan the res ponse to the issues raised by this letter, information Lwill be required from the. Westinghouse Own e rs ' Group conce rning the generic solution to some of these issues.
The need for this informat ion, as well as the need to fo rmula t e a coordinated program within Dif, means that the schedule for act ion in response to your letter will not be available before November.
Therefore, DLC will submit the sched ule fo r Beaver Valley Power Station Unit 2 by November 30, 1983.
DUQUESNE LIGHT COMPANY i
By E/ J.'Wooleve r Vice President KAT/wjs cc:
Mr. G. Walton, NRC' Resident. Inspector l
Ms. L. Lazo, Project 'Managaer l
NRC Document Control Desk i-l I
e3o9080036 830902 L