Final Deficiency Rept DR-120 Re Improper Storage & Subsequent Deterioration of Standby Switchgear Circuit Breakers.Initially Reported on 830527.Internal Circuit Breakers,Devices Required for Acb Operation,Tnaffected
ML20024E459
Person / Time
Site: River Bend 
Issue date: 08/03/1983
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-120, RBG, NUDOCS 8308150075
Download: ML20024E459 (1)


Text

eGb GULF STATES UTILITIES COMPANY POGT OFFICE box 2951 HEAUMON7. T E. # A S 77704 A F4 EA CUDE 71 3 836 663i August 3, 1983 RBG-File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator

{ g ]N- %

U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement

)l_ -

bl

~

1g n a

Lt

Dear Mr. Collins:

g River Bend Station Unit 1 Docket No. 50-458 Final Report /DR-120 On May 27, 1983, Gulf States Utilities Company (GSU) notified Region IV of a condition potentially reportable under 10CFR50.55(e) concerning the improper storage and subsequent deterioration of four standby switchgear circuit breakers (DR-120). GSU subsequently issued an Interim Report dated June 27, 1983.

Investigation revealed the improper storage of circuit breakers was limited in scope and that the internal devices of the circuit breakers required for proper ACB operation had not been affected. GSU concludes that had this condition remained uncorrected, it could not have adversely affected the safe operations of the plant and is therefore not reportable under 10CFR50.55(e). This completes GSU's response on this subject.

Sincerely, r

[J.E.Bo er i

Manager-Engineering, Nuclear Fuels & Licensing j.

River Bend Nuclear Group MD JEB/PJD/kt l

cc: Director of Inspection G Enforcement U. S. Nuclear Regulatory Commission Washington D. C. 20555 R. L. Brown (SRI) g, h

8308150075 830003 PDR ADOCK 05000458 S