ML20024E351
| ML20024E351 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 07/29/1983 |
| From: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| To: | Hartfield R NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| RTR-NUREG-0300, RTR-NUREG-300 ST-HL-AE-983, NUDOCS 8308100272 | |
| Download: ML20024E351 (6) | |
Text
.
The Light company,,,,,,,,.,,, o i.,,,,x & i,_
x i m..,noo ii..........i ~,..ooi a m m.s2i, Jul 1983 ST y 29HL-AE-983 File Number: G25 R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Hartfield:
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Update to Construction Status Report Houston Lighting & Power Company has reviewed the entries for the South Texas Project in NUREG 0030, " Construction Status Report", dated October 1982. The reports for December 1982, March 1983, and June 1983 have not been received. Attached are annotated corrected copies of those pages from the October 1982 report which require changes to update NUREG 0030 through second quarter of 1983.
If you have any questions, please call Mr. Michael E. Powell at (713)877-3281.
Very truly yours, J. H. Goldberg Vice President Nuclear Engineering & Construction MAM/bjc Attachment 8308100272 830729 PDR ADOCK 05000498 A
5
[
Jul 29 1983 cc:
G. W. Oprea, Jr.
STdL-AE'-983 J. H. Goldberg File Number: G25 J. G. Dewease Page 2 J. D. Parsons i
1 D. G. Barker M. R. Wisenburg R. A. Frazar J. W. Williams R. J. Maroni J. E. Geiger H. A. Walker S. M. Dew J. T. Collins (NRC) l' A. Vietti NRC)
W. M. Hill, Jr.
NRC)
M. D. Schwarz Baker &Botts)
R. Gordon Gooch (Baker &Botts) t J. R. Newman (Lowenstein, Newman, Reis, & Axelrad)
STP RMS Director, Office of Inspection & Enforcement
. Nuclear Regulatory Commission Washington, D. C. 20555 5
G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic' Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Ter.as 78403 Washington, D. C.
20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin.
313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 4
1 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 I
Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss l
for the State of Texas 1725 I Street, N. W.
P. O. Box 12548 Suite-506 Capitol Station Washington, D. C.
(
Lanny Sinkin c/o Ms.. Peggy Buchorn Citizens for Equitable Utilities, Inc.
Citizens Concerned About Nuclear Power 5106. Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 i
Robert G. Perlis, Esquire l
Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission
(
Washington, D. C.
20555 Revision Date 07-05-83 i
l
C0N5TRUCTION STATUS REF0RT SOUTH TEXAS 1 PAGE NO: 2-106 MUCLEAR POWER PLANTS STATUS AS OF 06-30,ptf82b PLANT CHARACTERISTICSt KEY PERS0NNEL DOCRET NO:
05000498 CP MO. 8 DATE ISSUED: CPPR-128/ 12-22-75 CORPORATE CONTACT:
J. M. COLDBERG. VICE PRESIDENT CP EXPIRATION DATE:
- - 1 ; ai- /E-3y-87 NUCLEAR ENGINEERING 8 CONSTRUCTION APPLICANT
PLANT LOCATION:
NOUSTON LIGHTING 8 POWER COMPANY CORPORATE ADDRESS:
P. O.
BOX 1700 12 MI SSW OF BAY CITY. TEX MOUSTON. TEXAS 77001 IE REGION -
4 AE BECHTEL CORPORATE PHONE NO:
(713) 486-361'8 NSSS:
WESTINGHOUSE CONSTRUCTOR:
EBASCO REACTOR TYPE:
PWR HRC LPM:
O. O T.".0 /4. //8! ~'
DER (MWE):
1250 IE PROJECT INSPECTOR:
IE RESIDENT INSPECTOR:
W. MILL INSPECTION $TATUSt FUEL L0AD DATE CHANGES TIME PERIOD A5 REP 0RTED 8Y UTILITYa Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE RFPORTED_BY UTIL ITY HUMBER OF INSP._
0F INSP.
10-30-78 11-00-81 SCHEDULE REEVALUATION.
8205 03-30-82 04-02-82 01-18-80 09-00-83 SCHEDULE REEVALUATION.
8206 04-12-82 04-23-82 08-05-82 12-00-86 CHANGE IN A/E AND CONSTRUCTOR.
8207 04-08-82 04-08-82 8208 04-01-82 04-30-82 i
8209 05-01-82 05-31-82 J
1
~
l Inspection reports are available at local PDRs.
l L0 CAL PUBLIC D0CUMENT R 0 0 M:
MATAGORDA COUNTY LAW LIBRARY P. O. BOX 487 BAY CITY, TEXAS 77414 I
e m
N a
e C0NSTRUCTION
$TA?US REPORT PAGE NO 2-107 SOUTH TEXAS 1 NUCLEAR POWER PLANTS STATUS AS OF8 06-30-g O C0NSTRHCTION
$TATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
12-00-86 APPLICANTS CONSTRUCTION COMPLETIM ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
09-08-83 DEFINED IN CPt (EARLIEST) # 4
- 3/-5e APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE 8 05-01-80 (LATEST)
/2 -3J-8'/
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 06-00-87 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:.MM N.
MM dal* ryns<m's,[peaur doph/gsgp/us gog
=
ui avanadi. for m Ag/g/rgt COMMENTS REGARDING CURRENT CONSTRUCTIDH STATUS:
n gpfff
/p/p f/och ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START
$T_ ART COMPLETION
[0MP_1 Q1QM LQDMPLETE MOBILIZE AND PREPARE SITE:
09-007 5 12-00-15 100%
g PLACE STRUCTURAL CONCRETE 04-00-76 N
)#747, INSTALL REACTOR PRESSURE VESSEL:
09-00-79 09-00-79 100%
fo-to-$.7Y
.JWrd27, INSTALL LARGE BORE PROCESS PIPE:
10-00-78
! 00 ll-00 QY g/Jk INSTALL LARGE EORE PIPE NANGERS, RESTRAINTS AND SNUBRERS:
10-00-78
" ' 0 ;. 0-
/l * *0 -17 INSTALL SMALL BORE PIPE 10-00-78 AL=44-M
)M(/ff,
/2*00-N.
//7%
INSTALL CABLE TRAY:
10-00-78 07 00.
INSTALL EXPOSED METAL CONDUIT
%2f%
OY~#
[2%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
gW"rt oz-n os INSTALL ELECTRICAL TERMINATIONS:
?!.
Aa-nn-Ra NA CG=OE*$.$
Q"="00ff-NA CONDUCT REACTOR COLD NYDR0 STATIC TEST:
CONDUCT HOT FUNCTIONAL TEST:
NA
/ 2-00-$Y
/ %- 00*8$
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD:
C 0; or 44-49-99 NA o
e
C0N5TRUCTION 5TATUS REPQRT SOUTH TEXAS 2 NUCLEAR POWER PLANT 5 PAGE NO: 2-108 STATUS AS OF 06-30-pdb83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E Lt DOCKET NO:
05000499 CP NO. 8 DATE ISSL'ED: CPPR-129/ 12-22-75 CORPORATE CONTACT:
J. H. GOLDBERG. VICE PRESIDENT CP EX"IPrTION DATE:
i: ! 0F J Z-38-87 MUCLEAR ENGINEERING 8 CONSTRUCTION APP L I t.ite i t PLANI LOCATION:
NOUSTON LIGHTING 8 POWER COMPANY CORPORATE ADDRES$8 P. D. BOX 1700 IE REGION:
12 MI SSW OP BAY CITY, TEX HOUSTON. TEXAS 77001 4
Att BECHTEL CORPORATE PHONE No (713) 486-3828 NSSSt CONSTRUCTOR:
WESTINGHOUSE EBASCO REACIOR TYPE:
- 15. CC;t3 A, kUd bb'-
1250 IE PROJECT INSPECTOR:
IE RESIDENT INSPECTOR:
W. HILL INSPECTIOtl 5 T A T U 58 o
FUEL L0AD DATE CHANGE 5 TIME PERIOD Aor. 1982 - Jun. 1982 A5 REPORTED 8Y UTILITV8 REPORT BEG DATE END DATE REPORT NEW REASON FOR CHANGE HMEQL%
OF INSP.
OF INSP.
DATE SCHEDULE REPORTED BY UTILITY 8205 03-30-82 14-02-32 10-30-78 11-00-82 SCHEDULE REEVALUATION.
8206 04-12-82 (4-21-82 01-18-80 09-00-85 SCHEDULE REEVALUATION.
8207 04-03-82 04-08-82 08-05-82 12-00-88 CHANGE IN A/E AND CONSTRUCTOR.
8208 04-01-82 04-30-82 8209 05-01-82 05-31-82 Inspection reports are available at local PDRs.
L0 CAL PUSLIC D0CUMENT R 0 0 Mr MATACORDA COUNTY LAW LIBRARY P. O.
BOX 487 DAY CITY, TEXAS 77434 h
C0NSTRUCTION
$TATUS REPORT PAGE N08 2-109
~
SOUTH TEXAS 2 NUCLEAR POWER PLANT $
STATUS AS OF8 06-30-Af8f C0N5TRUCTION 5 T A T U St APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATEt 12-00-88 APPLICANTS CONSTRUCTION CDMPLETILM ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
09-01-85 DEFINED IN CP (EARLIEST) / 2-3/-p APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-81 (LATEST) / Z 87 APPLICANT'S CURRENT ESTIMATED C0ftr1ERCIAL OPERATION DATE: 06-00-89 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: }&IJ2/.S 20 COMilENTS REGARDING CURRENT CONSTRUCTION STATUS:,a; - Nei A,niinatE.
I 4
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START iTAR1
[0MPLETION ggMPLETIQH % COMPLETE MOBILIZE AND PREPARE SITEt 09-00-15 82-00-75 800%
PLACE STRUCTURAL CONCRETE:
c6 -oc-98 ov-oo-84
,MKif5fo 03-00-77 64-44-4f INSTALL REACTOR PRESSURE VESSEL:
69-99-99 09-00-84 9407 INSTALL LARGE BORE PROCESS PIPE 07 00 00 (99-00-81 jf-a-yf p(/Z 94
_i 20 __
OS-Do-N INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS AND SNUBBERS:
07-00-83 01 00 Go d
$ O7,
/ / *00-8E kf~$
P4/fe INSTALL SMALL BORE PIPE-
??-Go-65 J 2-OO-BE
[f$$'ff INSTALL CABLE TRAY:
y f 9, g
INSTALL EXPOSED METAL CONDUIT 57-44-95 03" # *
%17%
p6-oo-6t9 INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:
12-00-85
.0 00 00 p(l}7, os-on-86 INSTALL ELECTRICAL TERMINATIONS:
t: 0; 63 10-08-88
$4'OYa' es-oo-89 CONDUCT REACTOR COLD NYDR0 STATIC TEST:
06-00-88 44-99-DP NA OR 00 C029-89 CONDUCT HOT FUNCTIONAL TEST:
09-00-88 L
NA CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD 12-00-86 12-08-88 NA I
l 1