ML20024E325

From kanterella
Jump to navigation Jump to search
Request for Extension Until 830831 to Answer Statements of Potential Intervenors.Delay Necessary Due to Unavailability of Me Remley on 830801-22
ML20024E325
Person / Time
Site: 07000025
Issue date: 08/03/1983
From: Byrnes D
ROCKWELL INTERNATIONAL CORP.
To:
Atomic Safety and Licensing Board Panel
References
83-488-01-ML, 83-488-1-ML, NUDOCS 8308100248
Download: ML20024E325 (1)


Text

_

heted M

IWC AUG 8 1983

  • FlockweP8 International Corporation ggg cuporate Offices-El Segundo

$0CkWell 4

/

4

'R

/

2230 East imperial HQhway InternatiOna y

B Segundo, CaMomia 90245

~.

In the Matter of:

)

DOCKET NO. 70-25

)

ROCKWELL INTERNATIONAL CORPORATION

)

ASLBP No 83-488-01 ML

)

(Energy Systems Group Special Nuclear

)

Materials License No., SNM-21)

)

)

REQUEST FOR TIME EXTENSION TO ANSWER STATEMENTS OF PERSONS SEEKING TO INTERVENE AS PARTIES On July 26, 1983 Dr. Robert M. Lazo, Atomic Safety and Licensing Board Panel Presiding Officer, made an order directing the Er.srgy Systems Group of Rockwell International Corporation to file an answer to the statements made by ten persons seeking to intervene as parties to the proceeding, within ten (10) days after service of the Memorandum and Order.

Due to the unavailability of Dr. M. E. Remley, Director Health, Safety and Radiation Services Department of the Energy Systems Group from August 1, 1983 until August 22, 1983 it is respectfully requested that Energy Systems Group time to answer be extended until August 31, 198 D. P. Byrnes Assistant Gen al_ Counsel Rockwell International Corporation (Energy Systems Group)

Dated at El Segundo California this 3rd day of August, 1983 8308100248 830803 f)2)