ML20024E276
| ML20024E276 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 07/25/1983 |
| From: | Miller D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Hartfield R NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| CSC-6809, NUDOCS 8308100167 | |
| Download: ML20024E276 (5) | |
Text
a V
s j
/'
]i COUSteiS Donald B Mi!Ier. Je
}
- g. e r, p l
se be S.'te Akn.sger i
Afidknd Project l
Q s
y i
Midland Project: Po Box 1963, Midland, Mi da640 + (517) 6318650
$O-309 tswr 50- m 3 o nCi Y3 f
July 25, 1983 g
3 PA0 SLO OPRP RC Mr. R. A. Hartfield 9psA Chief, Management Information Branch 6JMSF office of Management and Program Analysis
')E Al gt U. S. Nuclear Regulatory Commission
}-
Washington, D. C.
20555 MIDLAND ENERGY CENTER GWO 7020 NRC SCHEDULE File: 0652 UFI:
53*54 Serial:
CSC-6809 70*01 Attached is the July 1, 1983 information for updating the status of Midland Units 1 and 2 of the NRC Yellowbook.
The construction percent is 84% complete for both Units 1 and 2.
Ap21 DBM/PFS/lrb Attachment Mr. James G. Keppler', Regional Director, Region III cc:
Mr. J. J. Harrison, Midland Project Inspector, Region III Mr. Frederick C. Williams, Isham, Lincoln and Beale, Washington Mr. Phil Steptoe, Isham, Lincoln & Beale, Chicago 0) 9308100167 G30725
\\\\
PDR ADOCK 05000329 R
C0N$TRUCTION STATUS REP 0RT PAGE N0s 2-HIDLAND i NUCLEAR POWER PLANT $
STATUS A5 0F86/30/83 C0N5iRUCTION STATUSs APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE8 2/9/85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE A$
APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-08-81 DEFINED IN cps (EARLIEST) December 1 1983 APPLICAHy:S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE 88-00-79 (LATEST)
December l'.1984 APPLICANT'S CURRENT ESTIMATED COMMERICAL OPERATION DATES 8/9/85*
CURRENT ESTIMATED PERCEMT CONSTRUCTION COMPLETES 84%
COMMENTS REGARDING CURRENT CONSTRUCTION STATU$s c
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED i
START START _
COMPLETION COMPLETION X COMPLETI l
MoaILIZE AMD PREPARE SITE 3/73 8/73 1001 PLACE STRUCTURAL CONCRETE:
8/73
'991+
INST ALL REACTOR PRESSURE VES;"' t 6/78 8/78 1001 INSTALL LARGE BORE PROCESS PIPES 7/76 6/84 99%
- INSTALL L ARGE BORE PIPE HANGERS. RESTRAINTS AND SHUBBER58 12/77 6/84 921 INSTALL SMALL BORE PIPES 1/77 6/84 961 INSTALL CABLE TRAYS 4/77 991+
l INSTALL EXPOSED METAL CONDUITS 4/77 7/84 97%
INSTALL POWER. CONTROL. INSTRUMENTATION AND SECURITY CABLES 11/78 7/84 93%
4 INSTALL ELECTRICAL TERMINATIONS:
6/78 7/84 82%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
3/84 3/84 CONDUCT. HOT FUNCTIONAL TEST:
7/84 9/84 CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOADS 10182 2/85
- Commercial Operation for both process steam and electrical
- Concrete and Cable Tray are 991 complete with minimal remaining to be done as required.
- Percent complete is for large bore hangers. Restraints and anubbers are not included.
t
,C0N$TRUCTION STATUS AEPORT PAGE N0s ?-
HIDLAND 2 NUCLEAR POWER PLANTS STATUS AS 0 6/30/83 PLANT CHARACTERISTIC 58 KEY PERS0NNELe DOCKET N08 05880338 CORPORATE CONTACTS J. *J. Cook. Vice President
/ 82-14-72 Projects. Eng & Construction CP No. A DATE ISSUEDs graj284 CORPORATE ADDRESS 8 1945 W. Parnall Road 7-0 CP EXPIRATION DATES APPLICANT 8 CONSUMERS POWER COMPANY PLANT LOCATION:
Midland. MI 48640 Jackson. MI 49201 IE REGIOMs III CORPORATE PHONE N0s (587) 788-0453 AEs BECHTEL NRC LPMs D. NOOD NS$$s BASCOCK 8 WILCOX IE PRINCIPAL INSPECTORS CONSTRUCTOR:
BECHTEL
-CONSTRUCTION:
R. J. COOK (RESIDENT INSPECTOR)
REACTOR TYPES PWR
-TEST AND STARTUPs DER (MWE3 8 8 18 IE RESIDENT INSPECTOR:
INSPECTION 8 T A T U Se FUEL L0AD DATE CHANOES TIME PERIOD A5 REPORTED 8Y U T I L I T Ya REPORT NEW REASON FOR CHANGE REPORT BES DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER CE OF INSP.
11-07-74 11-80-79 CONSTRUCTION SCHEDULE STRETCHED OUT TO REDUCE CURRENT CASH OUTFLOW ANNOUNCED BY UTILITY.
Ot-f4-7S 18-08-80 CONSTRUCTION SCHEDULE STRETCHED OUT.
89-19-79 46-08-89 DEVELOPMENT OF A TWO UNIT IN.EGRATED TEST SCHEDULE.
89-80-80 87-88-83 PROJECT SCHEDULE REEVALUATION INCORPORATING OUTSTANDING LICENSING i
ISSUES.
03-31-83 10-01-84 PROJECT SCHEDULE RE-EVALUATION AND DEVELOPMENT OF CCP PLAN i
LOCAL PUBLIC DOCUMENT R O O Ms GRACE DOW MEMORIAL LIBRARY 8780 W. ST. AHDREWS ROAD
. MIDLAND MICllIGAN 48640
C0NSTRUCTIOM STATUS REPORT PAGE N0s 2-i HIDLAND 1 NUCLEAR PGWER PLANTS STATUS A5 0F.6/30/83 f
PLANT CHARACTERISTICSa KEY PERSONNELa l
DOCKET H0s 85080329 CORPORATE CONTACTS J. W. Cook.*Vice President I
CP Ho. 8 DATE ISSUED: CPR-SI / 12-14-72 Projects. Eng & Construction CF EXPIRATIDH DATES 12-01-84 CORPORATE ADDRESSs 1945 W. Parnall P.oad APPLICANTS CONSUMERS POWER COMPANY PLAHi LOCATIONS Midland NI 48640 Jackson MI 49201 f
IE REGIONS III CORPORATE PHONE N0s (SI7) 788-0453 i
AEs BECHTEL MRC LPMs D. HOOD H555:
BABC0CK 8 WILC0X IE PRINCIPAL INSPECTORS CONSTRUCTOR 8 SECHTEL
-CONSTRUCTIDHs R. J. COOK (RESIDENT INSPECTOR)
-TEST AND STARTUPs
(
REACTOR TYPES PWR (4.000.000 Lb/Hr process steam) 492 IE RESIDENT INSPECTOR 8 DER (MWE)s fi INSPECTION S T 4.T U Se FUEL L0AD DATE CHANGES g
TIME PERIOD AS REP 0RTED BY UTILITYs REPORT
.NEW REASON FOR CHANGE 4
REPORT BE0 DATE ENO DATE DATE SCHE DUL E REPORTED BY UTILI1Y HkHg[{
OF INSP.
OF INSP.
88-07-74 11-08-80 CONSTRUCTION SCHEDULE STPETCHOUT TO 1
REDUCE CURRENT CA5H OUTFLOW.
i 11-08-81 CONSTRUCTION SCHEDULE STREICHED OUT TO el-14-75 REDUCE CURRENT CAST GUTFLOW.
09-88-40 12-00-83 PROJECT SCHEDULE REEVALUATION INCORPORATING OUISTAHDING LICEN53HG I
ISSUES.
Y 03-31-83 02-09-85 PROJECT SCHEDULE R7.-EVALUATION AND
'l j
DEVELOPMENT OF CCP PLAN i
f 4
j h
s i.
L0 CAL PUSLIC D0CUMENT R 0 0 Ms b
GRACE DOW MEMORIAL LIBRARY d
1718 W. SI. ANDREWS ROAD MIDLAND MICHIGAN 48640
C 0 N S T'R U C T I U N 5TATUS REP 0RT PAGE N0s 2-HIDLA'HD 3 NUCLEAR POWER PLANTS STATUS AS OFs 6/30/a1
(
l CONSTRUCTION S T 4 T U Ss l
8 i
j APPLICANTS 3 CURRENT ESTIMATED FUEL LOADING DATE:
10/01/84' APPLICANTS CONSTRUCTION CDMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
36-08-88 DEFINED IN cps (EARLIEST) July 1, 1963 l
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE 11-30-78 ILATEST)
Jujy 1,1984 APPLICANT'S CURRENT ESTIMATED COMMERICAL OPERATION DATES 2/28/85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETES 84%
t COMMENTS REGARDING CURRENT CONSTRUCTION STATUS ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 11 ART._
igGELETIDM COMPLETION 4 COMPLE11 i
3/73-8/73 100%
MOBILIZE AND PREPARE SITE 8 PLACE STRUCTURAL CONCRETES 8/73 99%+
1 INSTALL REACTOR PRESSURE VESSELS 4/78 5/78 100%
INSTALL LARGE BORE PROCESS PIPE:
4/76 6/84 991 l
- '* INST ALL L ARGE BORE PIPE HANGERS. RESTRAINTS AND SMUSSERSs 11/77 6/84 92%
l INSTALL SMALL SOR2 PIPES 1/77 7/84 951 4/77 99%+
[
INSTALL CABLE TRAYS 4/77 6/84 9 21 j
INST ALL EXPOSED METAL CONDUITS INSTALL POWER. CONTROL, INSTRUMENTATION AND SECURITY CABLE:
1/78 6/84 93%
s 6/78 6/84 82%
INSTALL ELECTRICAL TERMINATIONSs f
CONDOCT REACTOR COLD HYDROSTATIC TESTS 1/84-1/84 l
CONDUCT HOT FUNCTIDHAL TEST:
5/84 7/84 l
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
8/82 9/84 i
- Concrete and Cable Tray are 991 complete with minimal remaining to be done as required.