Forwards Remedial Soils Work Authorization for Aug 1983 & Supplemental Work Activity List for Sept 1983
ML20024E246
Person / Time
Site: Midland
Issue date: 07/28/1983
From: Mooney J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CSC-6798, NUDOCS 8308100115
Download: ML20024E246 (18)


Text

[6-BJ/

1

?ED COIISumBIS Power um-hecutive Atanager Atilland Project Office General of fices: 1945 West Parnall Road, Jackson, MI 49201 + (517) 788-0774 lPRtNCIfAL TA y\\[

2/ GELM.zl

_!y u,u WOI July 28, 1983 yad lito [d--

~

kylWI l fi ava JE U

Mr J J Harrison AL

.d

.l 3L

'# l l

Midland Project Section U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File:

0485.16 UFI: 42*05*22*04 Serial: CSC-6798 12*32 We are enclosing the proposed list of work accordance with the "NRC and CPCo Work Authorization Procedure" for the period between August 1, 1983, and August 31, 1983. Please review this work list and authorize the specific work items as established in the procedure.

Also enclosed is a Supplemental Work Activity List for September, 1983. Your review, comments and authorization of the specific work items as in accordance with the procedure are similarly requested.

- %ObwL JAM /AEB/klm Attachment 8308100115 030728 M6 041983 PDR ADOCK 05000329 PDR A

OC0783-0005B-CN01

,o

1

^

Consumers Power Company Attachment to Serial CSC-6798 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION GENERAL QUALITY PROGRAM 102351100 Approval of MPQP-2, Rev 1 A(10/22/82) 102351120 Approval of MPQP-1, Rev 6 A(6/20/83)

AUXILIARY BUILDING & FIVP UNDERPINNING PROGRAM WEST FIVP 102150010 Install Anchor Bolts & Rods 1 (8/12/82) A (8/13/82)

(includes hardness test on rods, drill concrete & steel and tensioning)

EAST FIVP 112150010 Install Anchor Bolts & Rods 1 (8/12/82) A (8/13/82)

(includes hardness tests on reds, drill concrete & steel, and tension) 162550010 WEST TURBINE / AUX BUILDING PIPE TUNNEL MODIFICATION Install Platform at El 600' 1 (4/5/83) A (4/20/83)

(includes installation of Pipe Tunnel Reinforcement, cutting of opening, Modification of Handrails and Ladder and Protection of Existing Piping) 162550100 Exploratory probe for UAT (West) 162550012 Pregrout from UAT (West) e miO882-2439d173-12 JEKostielney 07/20/83

2 4

l Consumers Power Company Attachment to Serial CSC-6798 Midlend Plant Units 1 & 2 r

WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 4,

152550010 EAST TURBINE / AUX BUILDING PIPE TUNNEL MODIFICATION Install Platform at El 600' 1 (4/5/83) A (4/20/83)

{

(includes installation of Pipe Tunnel Reinforcement, cutting of opening, Modification of Handrails and

]3 Ladder and Protection of Existing Piping) 152550100 Exploratory probing for UAT (East) i 152550012 Pregrout from UAT (East) 4 BUILDING MONITORING f

136050043 Maintain Instrument System 3 (8/12/82) A (8/12/82) 132550027 Install strain gauges and terminate cables A(07/28/83) j (includes testing and calibration) 4 132550050 Install, wire conduit and raceway from pier 2(12/13/82) A(12/13/82) i to data room for Pier Instrumentation i

165052021 Terminate Cables in Data Room & Terminal Boxes A (3/10/83)

& Pier Instrumentation GENERAL TEMPORARY DEWATERING 125150050 Continue Monitoring Utility Protection Pits (4) 3 (8/12/82) A (8/12/82) i 115150020 Continue Operation of Freeze System & Wells 3 (8/12/82) A (8/12/82) l 522550025 Excavate, Repair and Backfill Piezometer MP-2 1 (4/5/83) 522550020 Repair Six (6) Existing Observation Wells (WB-1, WP-2, COE-10, PD-18, W-2, PD-38) 1 (4/5/83) l 125150051 Install Clay to Below Duct Bank (pit 4) 1 (8/12/82)

I

miO882-2439d173-12 JEKostielney 07/20/83 l

=.

3 Consumers Power Company Attachment to Serial CSC-6798 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 125150052 Repair Ductbank (Pit 4) 1 (8/25/82)

(includes excavate, drift, repair and backfill) 115150026 Remove 36" Casing and Backfill 42" Hole 1 (9/17/82) 115150025 Clean out and backfill abandoned ejector holes (ME26A, ME28A and ME54)

R 102550135 Install piezometers BB1 & BB2 in Auxiliary Building A(07/28/83)

Control Tower CRACK MAPPING (includes scaffolding platforms, ladders and extra-ordinary clean up) 102250200 EPA (East & West) 3 (8/12/82) A (8/12/82) 102250105 FIVP (East & West) 3 (8/12/82) A (8/12/82) 102250100 Control Tower & Remainder of Aux Bldg 3 (8/12/82) A (8/12/82)

PIER 12W 165054010 Install & Load Pier 12W3 1 (8/12/82) A (12/9/82)

PIER 11W 165054015 Install & Load Pier 11W3 1 (8/25/82) A (2/22/83)

(includes install bituminous plywood forms)

PIER 9W 165054005 Install & Load Pier 9W3 1 (9/17/82) A (2/24/83)

PIER 12E miO882-2439d173-12 JEKostielney 07/20/83

4' Consumers Power Company Attachment to Serial CSC-6798 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 155054010 Install & Load Pier 12E3 1 (8/12/82) A (12/9/82)

PIER 11E 155054015 Install & Load Pier 11E3 1 (8/25/82) A (2/22/83)

PIER 9E 155054005 Install & Load Pier 9E3 1 (9/17/82) A (2/24/83)

PIER 8E 155054020 Install & Load Pier 8E8 1 (9/17/82) A (5/3/83)

GRILLAGE STRUCTURE AT PIER 8E 155053025 Excavate for Support Columns next to Containment 2 1 (9/17/82) A (6/20/83) 155055003 Install Steel Support Columns next to Containment 1 (9/17/82) A (6/20/83) 155055010 Install & Load Grillage Structure at Pier 8E I (9/17/82) A (6/20/83)

PIER 8W 165054020 Install & Load Pier 8W3 1 (9/17/82) A (5/3/83)

GRILLAGE STRUCTURE AT PIER 8W 165053025 Excavate for Support Columns next to Containment 2 1 (9/17/82) A (6/20/83) 165055003 Install Steel Support Columns next to Containment 1 (9/17/82) A (6/20/83) 165055010 Install & Load Grillage Structure at Pier 8W 1 (9/17/82) A (6/20/83) miO882-2439d173-12 JEKostielney 07/20/83

l 5

Consumers Power Co:pany Attachment to Serial CSC-6798 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 l

NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 1

EXCAVATION ZONES 155052020 Excavate / Lag Zone Y1 1 (4/5/83) A (6/20/83) 165052020 Excavate / Lag Zone 21 1 (4/5/83) A (6/20/83) 165056375 Excavate / Lag Zone Z2 A (5/27/83) 155056375 Excavate / Lag Zone Y2 A (5/27/83)

PIER W10 165054030 Install & Load Pier 10W3 1 (4/5/83)

A (5/3/83)

PIER E10 j

155054030 Install & Load Pier 10E3 1 (4/5/83)

A (5/3/83)

SLAB Modification at El 659.0' 102250208 Survey / Layout for Engineering Review in Preparation for Slab Fix @ El 659 3 (4/5/83) A (4/5/83)

PIER KC2 165054315 Install & Load Pier KC23 1 (9/17/82) A (4/22/83) i PIER KC11 155054315 Install & Load Pier KC113 1 (9/17/82) A (4/22/83)

PIER KC3 1

165052310 Drift to KC3 from W81 A (07/28/83) 165053310 Excavate Pier KC32 A (07/28/83) 165054305 Install & Load KC33 A (07/28/83)

J miO882-2439d173-12 JEKostielney l

' 07/20/83

6 Consumers Power Company Attachment to Serial CSC-6798 i Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III

REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER KC10 i

155052310 Drift to KC10 from E81 A (07/28/83) 155053310 Excavate Pier KC102 A (07/28/83) 155054305 Install & Load KC108 A (07/28/83) l 3

PIER W14 i

165052057 Drift From West Access Shaft to Pier W141 i

(includes Access Pit)

A (5/27/83) i 165053055 Excavate Pier W142 A (5/27/83) 165054050 Install Pier W14 A (5/27/83)

PIER E14 l

155052057 Drift from East Access Shaft to Pier E141 A (5/27/83) l (includes Access Pit) l 155053055 Excavate Pier E142 A (5/27/83) 1 155054050 Install Pier E14 A (5/27/83) l 1

4 i

1 l miO882-2439d173-12 JEKostielney 07/20/83 I

i 4

7 Consumers Power Company Attachment to Serial CSC-6798 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION SERVICE WATER PUMP STRUCTURE UNDERPINNING PROGRAM POST TENSIONING SYSTEM 202555170 Post Tensioning Tendon inspection & maintenance 3(12/7/82) A (12/7/82)

DEWATERING 207050605 Install Remaining Ejector Wells A (6/23/83) 207050385 Core Drill SWPS Slab for Ejector Wells A (3/17/83) 207050386 Core Drill CWIS Slab for Ejector Wells 1(11/1/82) A (3/1'/83) 207050748 Probe for Deep Utilities Outside El 610 Excavation Limits (Ref Dwg C-2031) 1 (4/5/83) A (5/27/83) 207050380 Core drill SWPS and CWIS slabs for Piezometers A (4/13/83) 207050600 Install Piezometers A (6/23/83) i 207050635 Install Dewatering Discharge System 2 (9/17/82) A (6/23/83)

(including headers, tank, pumps and electrical) 1 207050387 Convert 7 Wells used on 72" pipe repair to support SWPS 1(11/1/82) A (2/11/83) dewatering.

(Includes install new ejectors, temporary headers, operate, & maintain)

Fill SWPS Chambers (Bays) 203150165 Fill SWPS Chambers with Water to El 622 (15')

Modify Pipe Supports 202550164 SWPS - Modify pipe supports to allow for design load A (5/27/83)

(30" 0HBC 34, 20 & 16) 4 miO882-2439d173-12 JEKostielney 07/20/83

~.. _. _

t 8

Consumers Power Company Attachment to Serial CSC-6798 j Midland Plant Units 1 & 2 i

i WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982

)

NEW OR ACTIVITY PREVIOUS REGION III L

j REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION l

ACCESS SHAFT & EXCAVATION 207050335 Install Soldier Piles 1 (8/12/82) A (5/27/83) l BUILDING MONITORING 202550100 Install Deep Seated Bench Marks 1 (8/12/82) A (4/4/83)

(

[

l 206050105 Crack Map SWPS 1 (9/17/82) A (3/10/83) 1 j

202550130 Installation of Extensometer Anchors 1 (4/5/83) A (4/13/83) i j

202550120 Installation of Extensometer Covers 3 (4/5/83) A (4/5/83) l 206050100 Install Extensometers 1 (9/17/82) A (5/27/83)

I i

206050106 Install Instruments and Terminate Instrument cables 1 (9/17/82) A (5/27/83) i j

(Includes testing & calibration) t

}

206050102 Install Brackets 1 (9/17/82) A (4/20/83) i j

l 207550103 Install Conduit & Raceway 1 (9/17/82) A (2/22/83) 202550104 Install cable and terminate at Data Acc,uisition Room 1 (9/17/82) A (5/27/83) 206050101 Install Permanent Benchmark Covers 1 (9/17/82) A (4/20/83) 206050104 Baseline, Operate, and Maintain Instrument System R

l DUCTBANK PENETRATION 852450105 SWPS - Provide Ducktbank Penetration in SWPS Wall and install pull box.

i f

i l

3 miO882-2439d173-12 JEKostielney 07/20/83 i

9 Consumers Power Company Attachment to Serial CSC-6798 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION BORATED WATER STORAGE TANK FOUNDATION & TANK REPAIR PROGRAM UNIT 1 TANK 312150005 Drill and Grout Shear Connectors 2(12/13/82) A (4/20/83) 312150007 Prepare concrete surfaces, drill holes & remove A (4/20/83) concrete for rebar.

312150011 Construct New Ring Beam 1 (8/12/82) A (7/8/83)

(set forms & place rebar, pour concrete) 312550019 Reinstall Electrical Ductbank 2 (9/17/82) A (4/6/83) 312550018 Reinstall Piping, Pipe Hangers and Electrical Facilities A (3/17/83)

UNIT 2 TANK 322150005 Drill and Grout Shear Connectors 2(12/13/82) A (4/20/83) 322150007 Prepare concrete surfaces, drill holes & remove concrete A (4/20/83) for rebar 322150011 Construct New Ring Beam 1 (8/12/82) A (7/8/83)

(set forms & place rebar, pour concrete) 322550019 Reinstall Electrical Duct Bank 2 (9/17/82) A (4/6/83) 322550018 Reinstall Piping, Pipe Hangers and Electrical Facilities A (3/17/83) 322150212 Repair Tank Weld Defect R

miO882-2439d173-12 JEKostielney 07/20/83

10 Consumers Power Company Attachment to Serial CSC-6798 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR TIE PERIOD BEWEEN AUGUST 1,1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION UNDERGROUND PIPE REPLACEMENT, REBEDDING, AND MONITORING PROGRAM SHALLOW PROBING FOR PHASE II 407050400 Shallow probing for Phase II (Ref DWG C-2031)

A (5/27/83)

TRAIN A 0F SERVICE WATER PIPE REPLACEMENT 4 402550500 Excavate Existing Pipe 1 (8/12/82) A (5/27/83) 402550510 Remove Existing Pipe 1 (8/25/82) A (5/27/83) 402550520 Install new pipe & expansion coupling 1 (8/25/82) A (5/27/83) 402550515 Hydro Test new pipe A (5/27/83) 402550507 Perform Profiling & Ovality Check on New Piping A (5/27/83) 402550525 Temporary Backfill New Pipe 1 (4/5/83)

CONSTRUCTION WORK IN SOIL MATERIAL PROGRAMS PERMANENT INTRUSION DETECTION SYSTEM 732050002 Install Wire (incl conduit) 3 (8/25/82) A (8/25/82) 732050003 Install Fence (incl fence posts & concrete strip) 3 (8/25/82) A (8/25/82) 732050004 Install Grounding 3 (9/17/82) A (9/17/82) niO882-2439d173-12 JEKostielney 07/20/83

11 i

fConsumersPowerCompany Attachment to Serial CSC-6798 Midland Plant Units 1 & 2 4

WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III

REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION OBS-4 Repair 522550018 Dutch Cone Soil Testing in Vicinity A (07/28/83) of OBS-4 for exploratory purposes 1

Acid-Caustic Unloading Station 822550001 Excavate, install and backfill drainline and 1 (11/1/L2) A (4/20/83) i slab for Acid-caustic unloading station at East end of Turbine Building r

EMERGENCY PERSONNEL LOCKS - UNIT 2 792550005 Excavate, rebar, pour concrete and backfill Airlock Structure 1 (9/17/82) l SIT /ILRT TEST FACILITIES 862450105 Exploratory Excavation at SIT /ILRT Duct Bank A(5/27/83) 1 PERMANENT DEWATERING PROGRAM 522150095 Install Remaining Wells I (9/17/82) 522550016 Install electrical equipment & conduit 1 (9/17/82) 522550020 Excavate, install and backfill header piping, electrical 1 (9/17/82) conduit, and pumps (including equipment slabs and metering pits) 522550025 Assemble and wire pump control panels i miO882-2439d173-12 JEKostielney 07/20/83 1

1 I

12 Consumers Power Company Attachment to Serial CSC-6798 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN AUGUST 1, 1983 and AUGUST 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION DIESEL FUEL SUPPLY LINES 722050001 Install missle shielding 1 (8/25/82) 722050002 Excavate, remove, reinstall and backfill 1 (11/1/82)

DF0 supply lines 802450005 Exporatory excavation for examiniation of diesel A (4/13/83) fuel oil lines DIKE MAINTENANCE 812550010 Normal dike maintenance in Q areas A (5/27/83)

CONTROL ROOM PRESSURIZATION TANK SETTLEMENT MARKERS 932450100 Excavate for, install and backfill Control Room pressurization tank settlement markers MISCELLANEOUS 942450200 Remove (excavation) temporary uncontrolled fill located 1 (7/5/83) in Q areas (DWG C-45Q) as identified on NCRs and the OGSE action item logs, and backfill per Spec C-211Q 942450300 Excavate and backfill trench for ground cable east 3 (7/15/83) A (7/15/83) of Tech Support Center.

CATHODIC PROTECTION 752050001 Drill and replace annodes (as necessary) 1 (8/25/82) 752050002 Drill and install new annodes 1 (11/1/82) oiO882-2439d173-12 JEKostielney 07/20/83

1 Consumers Power Cocpany Attachment to Serial CSC-6798 Midland Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN SEPTEMBER 1, 1983 AND SEPTEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION AUXILIARY BUILDING & FIVP UNDERPINNING PROGRAM SUPPORT BRACKET 152555010 Install Temporary Support Bracket at El 162555010 Install Temporary Support Bracket at W1 PIER E13 155053040 Excavate Pier E132 A (5/27/83) 155054035 Install Pier E13 A (5/27/83)

PIER W13 165053040 Excavate Pier W132 A (5/27/83) 165054035 Install Pier W13 A (5/27/83)

DOWELS AT FIVP 155050325 Install dowels at east FIVP 165050325 Install dowels at west FIVP LEVEL C WALES 165055305 Install Level C Wales, West Side A (5/27/83) 155055305 Install Level C Wales, East Side A (5/27/83) miO882-2439f173-12 JEKostielney 07/20/83

2 Ccasumers Power Company Attachment to Serial CSC-6798 Midland Plant Units 1 & 2

(

SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN SEPTEMBER 1, 1983 AND SEPTEMBER 30, 1983 t

DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III

' REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER CT12 j

155052035 Drift to CT12 from UAT1 155053050 Excavate Pier CT122 1

155054045 Install & Load Pier CT123 l

PIER CT1 165052035 Drift to CT1 from UATI i

165053050 Excavate Pier CT12 165054045 Install & Load Pier CT13 PIER KC4 l

155052032 Finger Drift to KC41

.l r

j 155053315 Excavate Pier KCS2 5

155054310 Install & Load Pier KC43 i

PIER KC9 l

165052032 Finger Drift to KC9 1 165053315 Excavate Pier KC92 1

165054310 Install & Load Pier KC93 i

LONG DRIFTS miO882-2439f173-12 JEKostielney 07/20/83

3 1

Consumers Power Company Attachment to Serial CSC-6798 j Midland Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN SEPTEMBER 1, 1983 AND SEPTEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III l REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION

)

j 155052320 Drift to KC4 from KC31 i

i 165052320 Drift to KC9 from KC101 A (07/28/83) 155052030 Drift to KC3 from KC21 A (07/28/83) 4 165052030 Drift to KC10 from KC111 155054515 Construct concrete invert and layback soil KC2 to KC3 1 (7/5/83) 165054515 Construct concrete invert and layback soil KC11 to KC10 1 (7/5/83) 4 UNDERGROUND PIPE REPLACEMENT, REBEDDING, AND MONITORING PROGRAM 4

TRAIN B 0F SERVICE WATER PIPE REPLACEMENT 4 402550446 Excavate Existing Pipe 1 (8/12/82) 402550550 Remove Existing Pipe R

2 402550560 Install new pipe & expansion coupling R

l 402550561 Hydro Test new pipe R

s 402550508 Perform Profiling & Ovality Check on New Piping R

402550562 Temporary Backfill New Pipe 1 (4/5/83) j i

i I

l i

niO882-2439f173-12 JEKostielney 07/20/83

4 Consumers Power Company Attachrsent to Serial CSC-6798 Midland Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST.FOR THE PERIOD BETWEEN SEPTEMBER 1, 1983 AND SEPTEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION Ill REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION SERVICE WATER PUMP STRUCTURE UNDERPINNING PROGRAM FXCAVATION 207050781

<,m-evate, lag, brace and install wales and struts in smer east section of SWPS access shaft (soldier iJes '4 thru 30 - maximum excavation to EL 618'-3"

Nag localized excavation at roipe supports).8 207050782 Excavate, lag, brace and install wales and struts in upper west section of SWPS access shaft (soldier Piles 1 thru 14 - maximum excavation to EL 624'-9" excluding localized excavation at pipe supports.)s 207050783 Excavate lag, brace and install wales and struts, pour 1 (7/5/83) and cure concrete mudmat in lower east section of SWPS access shaft (soldier piles 15 thru 30 - maximum excavation to EL 618'16" excluding localized excavation.)s 207050784 Excavate, lag, brace and install wales and struts, 1 (7/5/83) pour and cure concrete mudmat in lower west section of SWPS access shaft (soldier piles 1 thru 14 -

maximum excavation to EL 618'16" excluding localized excavation.)5 202550163 Remove abandoned fire protection pipeline 1 (11/1/82) A (5/27/83)

DEWATERING SYSTEM 207050620 Activate, Operate and Maintain Dewatering System 1 (9/17/82) A (5/27/83)

BORATED WATER STORAGE TANK FOUNDATION AND TANK REPAIR PROGRAM miO882-2439f173-12 JEKostielney 07/20/83

5 Consumers Power Company Attachment to Serial CSC-6798 Midland Plant Units.1 & 2 4

SUPPLEMENTAL WORK' ACTIVITY LIST FOR THE PERIOD BEWEEN SEPTEMBER 1,1983 AND SEPTEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 312150015 Relevel Tank-Unit 1 1 (9/17/82) 312550100 Install Instruments (includes testing and calibration) 1 (11/1/82) 322550100 Install Instruments (includes testing and calibration) 1 (11/1/82) l CONSTRUCTION WORK IN SOIL MATERIAL PROGRAMS PERMANENT DEWATERING 522550014 Excavate Headers & Metering Pits, Install Header and Level Monitoring System, Install Pumps, Timers and Backfill CONTAINMENT TENDON ACCESS VENT HVAC 802550010 Excavate for, Install and Backfill Electrical Duct 1 (9/17/82)

Bank and Equipment Pad for the Unit 1 HVAC Fan 802550020 Excavate for, Install and Backfill Electrical Duct 1 (9/17/82)

Bank and Equipment Pad for the Unit 2 HVAC Fan NITROGEN TANK INSTALLATION 782550005 Excavate for, install and backfill electrical duct bank 1 (9/17/82) 782550010 Excavate for, install and backfill piping 1 (9/17/82) 782550015 Excavate for, install and backfill concrete pad 1 (9/17/82) 782550020 Excavate for, install and backfill nitrogen tanks and 1 (9/17/82) associated concrete structures l

aiO882-2439f173-12 JEKostielney 07/20/83

.