ML20024E087
| ML20024E087 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/05/1983 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | |
| References | |
| ALAB-724, ISSUANCES-SP, NUDOCS 8308090165 | |
| Download: ML20024E087 (3) | |
Text
i..
,s UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION M I' A
COMMISSIONERS:
's
'N ntcaun Nunzio J. Palladino, Chairman Victor Gilinsky D
'M "
Thomas M. Roberts 9-James K. Asselstine 1,o.3 er,1,:,
belt \\ tcE nit \\NCit t-b SECY..iltC
/
)
In the Matter of
)
)
METROPOLITAN EDIS0N COMPANY
)
l Docket No. 50-289 SP (Three Mile Island Nuclear Generating Station, Unit No. 1)
)
)
5W ggNED AUG ORDER On April 20, 1983 the Atomic Safety and Licensing Appeal Board issued ALAB-724.
In that decision the Appeal Board discussed " Board Notification Regarding the Need for Rapid Primary System Depressurization Capability in PWRs" (BN-83-47), dated April 4, 1983.
l The Appeal Board stated that the safety concerns raised by BN-83-47 --
involving whether the power operated relief valve (PORV) should be safety-grade because of the potential for using it to mitigate the consequences of design basis steam generator tube rupture accidents --
required " careful and prompt consideration," but that it did not believe it could " evaluate the issues raised in BN-83-47 because they stem from matters outside the scope of this proceeding."
15 NRC at Slip Op.
at 3-4.
8309090165 830805 PDR ADOCK 05000 0
3 500 w
,s,-, - -,, - -
y
,.,,nw y-m w
.--e--y
,-e
+
w,c
-m-
.e,-m, sm.es
A 3
The parties have twenty-five days from the date of this Order to 1
provide their briefs, and fifteen days thereafter to provide any reply briefs.
Comissioner Robert:, dissents from this Order.
It is so ORDERED.
pRREco For the Comission*
'o y
f y
1 o
0 o
Yh "I h
01N O
+9 o
/
SAMUEL J.
CHILK 4,g4 Secretary of the Comission Dated at Washington, D.C.
this.Sth day of' August, 1983 Comissioner Gilinsky was not present when this order was affirmed but had previously indicated his approval.
--