Text
__
s b
- h I.h b.
kk DISTRIBUTION:
July 22, 1983 et h%32W33q,%g NRc PUR Local PDR bocket Hos: 50-329 OM, OL densa and 50-330 OM, OL DHood MMiller TNovak Mr. Howard Levin, Project Manager J
e TERA Corporation JStone, I&E 7101 Wisconsin Avenue ACRS (16)
Bethesda, Maryland 20814 Mr. J. W. Cook Vice President Consumers Power Company
- 1945 West Parnall Road Jackson, Michigan 49201 Gentlemen:
Subject:
Protocol for Communications for Midland Independent Design and Construction Verification Program During an April 13, 1983, meeting cn the Independent Design and Construction VeriF-cation (IDCV) program plans for Midland Plant, Units 1 and 2 TERA requested cla. '
fication of the Protocol Governing Communications (Enclosure 1) submitted by J.
Xeppler's letter of March 28, 1983. At the April 13 meeting TERA stated its inter-pretation that the protocol regarding the noticing of meetings to discuss substantive matters is intended to apply to the findings stage, not during solicitation of infor-mation. On May 27, 1983, TERA issued a !!onthly Status Report which also contained a notice of a meeting to be held June 3,1983. The June 3 meeting in Ann Arbor discussed Confimed Items submitted as Attachment 3 of the May 27, 1983 Status Report and provided infomation which will establish the disposition of these items (i.e., whether they progress to the Findings stage). The NRC staff considers such j
discussions of Confirmed Itens to constitute substantive matters. Hence, the pro-tocol procedures for the June 3,1983, neeting nay not have been strictly followed.
l The staff requests that such future meetings be conducted subject to the Protccol,
)
including paragraphs 3 and 4 therein. We request that written minutes for the
)
June 3,1983, neeting be prepared by TERA and that these be served on the May 24, 1983, modified service list.
Mr. G. Keeley of Consuners Power Company (CPCo) commented on April 13,1983, that the noticing of meetings and preparation of written minutes of meetings pursuant to 8308080596 9
"'C ' >
OATE f NIC FORM 318 10/ 80l NRCM O240 OFFICIAL RECORD COPY 7'
- U.S. GN 1983-400-247 )
m < m.~.m u u.m -- A
QN
'x;O:r Ze, W,
p, pr7 m
%Q h
-gp g
Mr. Howard Levin Mr. J. W. Cook paragraph 3 of the Protocol should be perfomed by TERA, rather than by CPCo. The staff agrees that once its approval of TERA is indicated, TERA should assume this responsibilit;y.
Sincerely, Thomas ti. Novak, Assistart Director for Licensing Division of Licensing
Enclosure:
As stated cc w/ enc 1:
See next page
- NOTE: SEE PERVIOUS WHITE FOR CONCURRENCE
"'c'> R I.II...........
.DL:La.#4......dl.':.LB.#4...
....[
u.
s m rur) *R,y,a rw,i,ck /,hmt,,*D,H o o,d,,,,,,,,,,,6de,,gm,,,
T. ak,,,,
s/u/83........
. 62 8../83........ 7./.%83......
.7///[83.....
^ " >
OFFICIAL REC /ORD COPY
- U.S. G N 1983--400 247 "c 'oa" 3'a no,somacu o24o
===.4 w~-
~..
- ne +.
.w:-...
Q) 84
'3 v
Docket Nos. 50-329/330 OM, OL Mr. Howard Levin, Project Manager TERA Corporation 7101 Wisconsin Avenue Bethesda, Maryland 20814 Mr. J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road a
l Jackson, Michigan 49201 Gentlemen:
Subject:
Protocol for Communications and Pr gram Restraints for Midland Independent Design and Construct on Verification Program During an April 13, 1983 meeting on thy Independent Design and Construction Verification (IDCV) program plans for/ Midland Plant, Units 1 and 2, clarification of the Protocol Governing Communications submitted by J. Keppler's letter of March 28, 1983, was requested. For/ convenience, a copy of the Protocol is enclosed (Enclosure 1). This letper responds to the request for clarification.
Our reconsideration of an existipg IDCV program restraint associated with re-work from the Construction Completion Program was requested April 13, 1983 and is also discussed.
Protocol On April-13, 1983, TERA tated its interpretation that the protocol regarding i
the noticing of meeting to discuss substantive matters is intended to apply to the findings stage,/not during solicitation of information. Hence, the protocol procedures fpr the June 3,1983 meeting may not have been strictly followed other than py announcing the meeting in Section 6 of the May 27, 1983 Monthly Status Repo t.
The June 3,1983 meeting in Ann Arbor discussed Confirmed Items submitted as Attachment 3 of tne May 27, 1983 Status Report and provided information which will establish the' disposition of these items (i.e., whether l
they progress to/the Findings stage). The NRC staff considers such discussions of Confirmed Items to constitute substantive matters and requests that such future meetings / be conducted subject to' the Protocol, including paragraphs 3 and 4 therein. We request that written minutes for the June 3,1983 meeting be l
prepared by TERA and that these be served on'the-May-24,1983 modified service i
list.
Mr. G. Keeley of Consumer Power Company (CPCo) commented on April 13, 1983 that i
the noticing of meetings and preparation of written minutes of meetings pursuant to paragrapn J or tne Fronocoi snoulo
)e performeo oy itxA, ratner tnan oy LPto.
OFFICE) The...$.t4f.f.4gy ees..that.. onco...i.t6. 4pprOVa I..of.. TERA...i.s. indicated.,...TI:RA..shoul.d..assu me...............
SURNAME) tb.i$..f.$$D.QES.i h.k),kkY.p...........
t.
DATE)
OFFICIAL RECORD COPY uso asu-a sea l Nac ronu ais oo oo NRCM oao
o o
a 11r. Iloward Levin Nr. J. W. Cook Program Restraints At the April 13, 1983 raeeting, the liRC indicated it is re-examining its prior position that the construction verification portion of TERA's program should not be conducted until any construction rework for the Construction Completion Program (defined by CPCo's letters of January 10, June 3 and Ju'ne 10, 1983) for applicable systems has been completed. Since adoption of this position, another third-party has been named to overview the Construction Cofapletion Program, and TERA has noted that certain disadvantages are associated'with a pause in execu-tion of its IDCV program. The staff has completed review of its previous position and finds that this program restraint is no' longer needed.
y'
/
/
Sincerel,
T omas M. Novak, Assistant Director for Licensing Division of Licensing 1
Enclosure:
As stated cc w/ encl:
See next page N
/
A ng p%n&
n
~
Sr
,, l;,:LB, #4
, DL,: L,B,, # 4,
AD.:L;:DL,,,,,
ornce>
RIH,,,,,.,,
U
...p.R34.3h.2.
suauu.e> hr.wi.ck.....
..EMen.s.em..
..Inov at........
onIy.. 6L....&3.......
. 6L....L83......p.t29m3!...
. 6L.../83....
unc ronu ais oo-son nacu ovo OFFICIAL RECORD COPY usa m ua s sem
o b
o MIDLAND Mr. J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc: Michael I. Miller, Esq.
Mr. Don van Farrowe, Chief Ronald G. Zamarin, Esq.
Division of Radiological Health Alan S. Farnell, Esq.
Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 Three First National Plaza, Lansing, Michigan 48909 Sist floor
- Chicago, Illinois 60602 Mr. Steve Gadler 2120 Carter Avenue James E. Brunner, Esq.
St. Paul, Minnesota 55108 Consumers Power Company 212 West Michigan Avenue U.S. Nuclear Regulatory Commission Jackson, Michigan 49201 Resident Inspectors Office Route 7 Ms. Mary Sinclair Midland, Michigan 48640 5711 Summerset Drive Midland, Michigan 48640 Ms. Barbara Stamiris 5795 N. River Stewart H. Freeman Freeland, Michigan 48623 Assistant Attorney General State of Michigan Environmental Mr. Paul A. Perry, Secretary Protection Division Consumers Power Company 720 Law Building 212 W. Michigan Avenue Lansing, Michigan 48913 Jackson, Michigan 49201 Mr. Wendell Marshall Mr. Walt Apley Route 10 c/o Mr. Max Clausen Midland, Michigan 48640 Battelle Pacific North West Labs (PNWL)
Battelle Blvd.
Mr. R. B. Borsum.
SIGMA IV Building Nuclear Power Generation Division Richland, Washington 99352 Babcock & Wilcox 7910 Woodmont Avenue, Suite 220 Mr. I. Charak, Manager Bethesda, Maryland 20814 NRC Assistance Project Argonne National Laboratory Cherry & Flynn 9700 South Cass Avenue Suite 3700 Argonne, Illinois 60439 Three First National Plaza Chicago, Illinois 60602 James G. Keppler, Regional Administrator U.S. Nuclear Regulatory Commission, Region III 799 Roosevelt Road i
Glen Ellyn, Illinois 60137
,_m.._,_
._r..,
y
Mr. J. W. Cook cc: Mr. Ron Callen Michigan Public Service Commission 6545 Mercantile Way P.O. Box 30221 Lansing, Michigan 48909 Mr. Paul Rau Midland Daily News 124 Mcdonald Street Midland, Michigan 48640 Billie Pirner Garde Director, Citizens Clinic for Accountable Government Government Accountability Project Institute for Policy Studies 1901 Que Street, N.W.
Washington, D. C.
20009 Mr. Howard Levin, Project Manager TERA Corporation 7101 Wisconsin Avenue Bethesda, Maryland 20814 Ms. Lynne Bernabei Government Accountability Project 1901 Q Street, N.W.
Washington, D. C.
20009 1
l i
Supplemental page to ths Midland OM, OL Service List Mr. J. W. Cook.
cc: Commander, Naval Surface Weapons Center ATTN:
P. C. Huang White Oak Silver Spring, Maryland 20910 Mr. L. J. Auge, Manager Facility Design Engineering Energy Technology Engineering Center P.O. Box 1449 Canoga Park, California 91304 Mr. Neil Gehring U.S. Corps of Engineers NCEED - T 7th Floor 477 Michigan Avenue Detroit, Michigan 48226 Charles Bechhoefer, Esq.
Atomic Safety & Licensing Board U.S. Nuclear Regulatory Canmission Washington, D. C.
20555 Dr. Frederick P. Cowan Apt. B-125 6125 N.. Verde Trail Boca Raton, Florida 33433 Jerry Harbour, Esq.
Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Geotechnical Engineers, Inc.
ATTN: Dr. Steve J. Poulos 1017 Main Street Winchester, Massachusetts 01890 I
--m.