ML20024D937

From kanterella
Jump to navigation Jump to search
Notification of 830808 Meeting W/Util in Bethesda,Md to Discuss Proposed Acceleration of Insps of Large Diameter BWR Pipe Welds.W/Agenda
ML20024D937
Person / Time
Site: Pilgrim
Issue date: 08/01/1983
From: Holahan G
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8308080528
Download: ML20024D937 (3)


Text

AUGUST 1 1983 DISTRIBUTI0i!

Acuraent C6'nM3 i;RG PUR i

L PDR PRC System Uccket flo.60-293 ORAS Reading JZwilinski TAlexion GHolahan MEMORANDUM FOR:

Darrell G. Eisenhut, Director Division of Licensing l

THRU:

Frank '. Miraglia, Assistant Director J

for Safety AsseJsment Division of Licensing FROM:

Gary M. Holahan, Chief Operating Reactors Assessment Branch Division of Licensing

SUBJECT:

FORTHCOMING MEETING WITH THE BOSTON EDIS0N COMPANY (Pilgrim 1)

Date & Time:

August 8, 1983 2:00 pm - 5:00 pm Location:

Room P-422 Phillips Building

Purpose:

To have licensees present to 'the staff recommendations and concerns regarding the proposed acceleration of inspections of large diameter BWR pipe welds (Agenda attached)

Participants :

NRC H. Denton, E. Case, D. Eisenhut, R. Vollmer, E. Jordan, R. Purple, G. Lainas, F. Miraglia, W. Johnston, D. Vassallo, D. Crutchfield, G. Holahan, B.D. Liaw, J. Zwolinski, T. Alexion, P. Matthews, K. Eccleston BECo B. Harrington, J. Ballentine, et al Ariginal Signed By:,

ary M Holahan, Chief 8308080528 830801 PDR ADOCK 05000293 Operating Reactors Assessm' t Branch G

PDR Division of Licensing

.e EIU!

bh[Ek'Jfpgi G[Dga an 'i g

i en

(

Df.

/SA DL UL T Ul Enci jgg Agen a

DISTRIBUTJ0N V. Stello T. Rhem T. Murley, R-I J. O'Reilly, R-II J. Keppler, R-III J. Collins, R-IV J. Martin, R-V R. Minogue L. Shao R. DeYoung E. Jordan J. Davis G. Cunningham C. Heltemes D. Garner S. Showman J. Austin J. Milhoan S. Chesnut OPE-OGC SECY W. Dircks E. Case J. Funches B. Snyder J. Grace T. Speis R. Vollmer R. Mattson H. Thompson W. Johnston B.D.Liaw D. Vassallo G. Lainas F. Miraglia D. Crutchfield J. Scinto J. Leiberman E. Sullivan J. Fouchard Licensee's Service List OPA

ygg, AGENDA I.

NRC Opening Remarks II.

Licensee Presentation on:

h A.

Justification for continued operation of the facility prior to completing the inspections described in Attachment A to the 50.54(f) letter.

Describe any unique safety related feature, information or. action that would justify not accelerating your current test and inspection schedule.

B.

Summary of weld inspections completed which the licensee believes conform to the intent of IE Bulletin 83-02:

inspection results, dates, system location inspection method crack detection sensitivity disposition of crack indications C.

Description of any special surveillance measures in effect or proposed for primary system leak detection that supplement current plant Technical Specifications.

D.

Costs and impacts on other safety related activities of conducting the inspections in Attachment A to the 50.54(f) letter:

a.

on a committed realistic accelerated schedule b.

30, 60, or 90 days from August 15, 1983 c.

during the next refueling outage E.

Discussion of availability of qualified inspection personnel to perfonn inspections.

III.

Licensee discussion of changes in information or positions as a result of EPRI UT information from 08/04/83 meetings.