Text
,
3 Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 July 29, 1983 Responds to:
g 3 g 7h0-460 Response required by: -
Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
NUCLEAR PROJECT N0. 1 REQUIRED ACTIONS BASED ON GENERIC IMPLICATIONS OF SALEM ATWS EVENTS
References:
- 1) NRC Generic Letter 83-28, dated July 8, 1983 2)
Supply System Letter, G.D. Bouchey to Harold R. Denton, NRC, " Construction Permit Extension WNP-1,"
dated January 11, 1983.
Raference i requested that within 120 days we provide proje':ted dates f ar the implew;ntation of the items enclosed with the reference.
(The WNP-1 opet a'.inj liccme application is hefere the NRC).
In view of the extended WW-1 construction delay oiscussed in reference l
2, we plan to provide the requested dates upon construction restart.
This wauld be at least threa years prior to fuel laad. As discussed in reference 2, th? earliest date for fuel load is June 1,1988.
It should be undert,t00d tnat with construction of WNP-1 currently in suspension, we will not be making any additions to the plant prior to restart that will make any hardware changas required by reference i more difficult.
(
4 G.C. So ensen, Acting Manager Nuclear Safety & Regulatory Programs (340)
GCS/AGH/cmh cc: MC Thadani, NRC (116)
NS Reynolds, Debevoise & Liberman HW Kwan, UE&C, PA (8U6)
-JT Enos, AP&L ORM (847) lO FDCC (899) e308080307 830729 PDR ADOCK 05000460 A
b STATE OF WASHINGTON)
Subject:
]& //TldS [tv-iz[S
)
ss County of Benton
)
I, G. C. Sorensen, being duly sworn, subscribe to and say that I am the Manager, Nuclear Safety and Regulatory Programs (Acting), for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.
DATED 2,E
,1983 fc/(L//
//
ykht%sMw
',,/G. C. Sorerisen, Manager, ( Acting)
Huclear Safety & Regulatory Programs On this day personally appeared before me G. C. SCRENSEN to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and seal this SS day of MM
,1983.
0 gf Notary PGblic in and for the State of Washington Residin at h MA f
/a/96
-