ML20024D638
| ML20024D638 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 08/01/1983 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, NUDOCS 8308050388 | |
| Download: ML20024D638 (2) | |
Text
9 J
TENNESSEE VALLEY AUTHORITY CH ATTANOOG A, TENNESSEE 374ol 400 Chestnut Street Tower II August 1, 1983 Director af Nuclear Reactor Regulation Attention:
Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Ms. Adensam:
In the Matter of
)
Docket No.
50-327 Tennessee Valley Authority
)
50-328 Please refer to my letter to you dated April 15, 1983 which submitted TVA's response to Generic Letter 82-33 regarding Supplement 1 to NUREG-0737.
At the request of Carl Stahle of your staff we are providing revised information concerning our previous response.
Enclosed is a revised flowchart which provides additional information developed since our initial response and negotiated completion dates for the emergency response capability requirements. The flowchart completely supersedes the one provided in our April 15 submittal.
If you have any questions concerning this matter, please get in touch with K. P. Parr at FTS 858-2685.
Very truly yours, TENNESSEE VALLEY AUTHORITY CEn' Mig L. M. Mills, unager Nuclear Licensing Enclosure cc:
U.S. Nuclear Regulatory Commission (Enclosure)
Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 006 8309050388 830801
>1 PDR ADOCK 05000327 I \\
F PDR l
1983-TVA SOTH ANNIVERSARY An Equal Opportunity Employer
r ENCLOSURE SEQUDTAN NLCLEAR PLANT INTEGAfD ACTION FIAE EDP DEVE3Arterf REC. CCIDE 1.97 G1 THIA
$FDS G1TERIA ERF CRITERIA DESICS GITERIA 1
if it i/
WoG Generte cuide-Uul/tce 32G. CCIDE 1.97 FUNCTION &L FUNCTIORAL s
ggae, ggfjgfgg SCBMITTAL SPECIFICATIONS SPECIFICATIONS 7/21/02 and gp Olarch 13, 1942) 3/4/33 w gag, SPDS Safety
c wr-ed
==C wre a1 A.u,eie 4
i eeeric Goldelgaes (withis 2eo*
Joe 1,1994 l
-512 1 sewed of receipt)
)
June 1.1983 August 1984 IF14 ielly eFor=
1 attesal and I WEITERS operators
*********0"'
PLANT SPECIFIC dellowing 3 TECENICAL CUIDELINES
[)
ggggg3 refuelleg estager I.
eUI-3/17/84 52-1/85 l
i/
PROCEDillES CENERATION PACEACS (October 1983)
.=.-..=.=g
.-.-.==.r F<e' i
gt s
a ir I
i l
....., Fw DATA su s
Dan su I
rw? s*sc1FIC fax g
(......)
[......
-i mTA SET I
not e I
i I
i----
.A l
it l
ir I
Reg. Cetde 1.97 Zwtmunom noetse see, tete December,1984 Ij ir A
1r L
L g
I C
fnAlvtsc AuD rare (Fr. sw na 1 ou retossunaa metnCArlouS l
(12 MD. AFTER 3RC ArFiorts Unt/ic. coe.
denser FRG August 1945 sf h
1
.lr l
r ir 8
TEGNICAL SCFFORT
""*T I
mCIAm Fus tAsa AmALYSIs CuTEn (F.ectiemal cruRAnous O'I'*"
DATA SET SUFF0tf CENTER l
June 9.1983
- (vill be eewleted I
6 see, af ter gare are (bF 210)
(Fumet 18eal)
I'*** '1*"I I g
impleensted) Feb 3906 eUI-3/17ste U2-1/OS J
_ p
_p oFCRAD inre A.
I (IMITEOL ROOM (9 es. af ter NODIFICATIONS IF
- Curteet projections complettee of taak EECESSAIT sealesia) Nov IM
- Dete dependest es complettee of tegolatory Guide 1.97 Destge.
Criteria based en the followie4 ethedule t ir 4
Fre11staarF desige change request D/1/B1
- De r for Providies Ret. ' Guide 1.9 7 Sep1**
Approved deelse ca. ease request 12/1/03 SM s
seatettee complettee Ceeptattee et design 12/1/86 Provide date for Reg. Cutde 1.97 date Jee 3, gagg Implenostattee 1/1/95 Schedolee for testallaties er upgrade will be ideettiled when neg. Guide 1.97 date eet le 1stegrated into CEDE and equipsett delivery dates, estage projarH a.
a
. and eenpower requarseesta 62d M.entined.
.1
,el,2, it.,
I n.
~
~