Interim Deficiency Rept Re Item M-61 Concerning Fire Protection Piping Suspended from Essential Cable Tray Supports.Initially Reported on 821013.Completion of Mods Contingent on Relaxation of NRC Order.Next Rept by 831111
ML20024D624
Person / Time
Site: Zimmer
Issue date: 07/27/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0093, LOZ-83-93, NUDOCS 8308050375
Download: ML20024D624 (2)


Text

a e

W' a-===

= -g di TIIE CINCINNATI GAS & ELECTRIC COM PANY CINCINN ATI. OHIO 452OI July 27, 1983 LOZ-83-0093 J. WILLIAM S. J R sENeon vaCE PerSsOENT NUCLEAR OPERAfeONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J.G.

Keppler Regional Administrator Gentlemen:

RE:

WM. H.

ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50. 55 (e), ITEM M-61, FIRE PROTECTION PIPING SUSPENDED FROM ESSENTIAL CABLE TRAY SUPPORTS W.O.

57300, JOB E-5590, FILE NO. 956C, M-61 This letter constitutes an interim report concerning the subject condition initially reported to the Commission on October 13, 1982 as a potentially reportable deficiency under the requirements of 10CFR50.55 (e).

As indicated in our previous report, LOZ-83-0017, the remainder of the corrective actions consists of modifying the existing cable tray hangers to accommodate the additional seismic loads from the Fire Protection piping.

Completion of these modifications is contingent upon relaxation of the NRC November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction" for this work.

Upon this relaxation, a projected schedule for completion of the corrective. actions will be submitted.

- ?hd}

8308050375 830727 508n.j198d l/0 n

v PDR ADOCK 05000358 S

PDR

g..

Mr. J.G.

Keppler Regional Administrator July 27, 1983 LOZ-83-0093 Page 2 An analysis of the safety implications of this condition is expected to be completed by October 31, 1983.

A follow-up report will be submitted by November 11, 1983.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By LL S, JR.

SENIOR VICE PRESIDENT DJS/JEK/sfr cca NRC Office of Inspection & Enforcement Washington, D.C.

20555 NRC Senior Resident Inspector ATTN:

W.F. Christianson NRC Zimmer Project Inspector, Region III ATTN:

E. R. Schweibinz i