Forwards Public Version of Rev 7 to Emergency Operating Procedures FNP-1-EOP-5.0, Reactor Trip & Rev 8 to Procedure FNP-1-EOP-15.0, Anticipated Transients W/O Trip (Atwt)
ML20024D585
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/11/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20024D582 List:
References
NUDOCS 8308050286
Download: ML20024D585 (1)


Text

.

Mamas Ad****

, Alabama Power Company 000' North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Claytoa, Jr.

Senior Vice President Flintridge Building July 11, 1983 AlabamaPower the southem erectrc system Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Mr. S. A. Varga

~

Joseph M. Farley Nuclear Plant - Units 1 and 2 Reactor Trip Breakers: 0S-416 Emergency Operating Procedures Gentlemen:

In response to the Alabama Power Company letter of July 6,1983, the following draft Emergency Operating Procedures (EOP) are submitted for NRC review and concurrence:

1.

FNP-1 EOP-5.0,' Rev. 7, " Reactor Trip" 2.

FNP-1-E0P-15.0, Rev. 8, " Anticipated Transients Without Trip (ATWT)"

These procedures have been revised in accordance with the philosophy outlined in the referenced letter.

Alabama Power Company will complete the approval process, personnel training, and ensure implementation within two weeks of the date of NRC Concurrence.

If you have any questions, please advise.

Yours very truly, 1

i

n m y C.nxkuls ~~

"\\

F. L. Clayton, Jr.