ML20024D459

From kanterella
Jump to navigation Jump to search
Notification of 830831 Meeting W/Util & B&W in Bethesda,Md to Discuss Results of Dec 1982 Insp,Metallurgical Exam of Pulled Tubes,Results of Jul 1983 Exams & Cause of Tube Degradation
ML20024D459
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/29/1983
From: Vissing G
Office of Nuclear Reactor Regulation
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8308050050
Download: ML20024D459 (2)


Text

_

,& 1 31 N

'4 VfS

)

. i.

bpq$-C/(<

Docket No. 50-313 m.as sea MEMORANDUM FOR: John F. Stolz, Chief Operating Reactors Branch #4, DL FROM:

Guy S. Vissing, Project Manager Operating Reactors Branch #4, DL

SUBJECT:

FORTHCOMING MEETING WITH ARKANSAS POLER & LIGitT COMPANY CONCERNING THE OTSG INSPECTIONS OF DECEMBER 1983 & JULY 1983.

Time & Date:

9:00 a.m. to 3:00 p.m.

August 31, 1983 Location:

Phillips Building, P-ll8 Bethesda, MD

Purpose:

To discuss: (1) Results of December 1982 inspections, (2) Metallurgical Examination of Pulled Tubes, (3)

Results of July 1983 examinations, (4) Cause of tube degradation, (5) Correction actions and (6) Concern for a midcycle tube inspection.

Requested

Participants:

NRC ycensee B. D. Liaw John Marshall, et.al.

C. Y. Cheng Louis Frank Conrad McCracken G. Vissing Other Original signes ty B&W Representatives OgggO!OOOb3 Luy Vissing, Project Manager O

G PDR Operating Reactors Branch (4 Division of Licensing Cc:

See,next page o"'c: >

0RB,#4 : DL,,,,,

CNissi,ng 1/

/83

,,,, g Nac r=u ais uo, son wacu o24 OFFICIAL RECORD COPY

  • u.s.om ma-4oo-247

- ~, _,

p MEETING SUPWARY DISTRIBUTION

~

$'b/h Licensee:

R 8 9 33

  • Copies also sent to those people on service (cc) li,st for subject plant (s).

Docket File i

NRC PDR L PDR ORB #4 Rdg Project Manager :GVissing JStolz BGrimes (Emerg. Preparedness only)

OELD NSIC ELJordan, IE JIITaylor, IE ACRS (10)

NRC Meeting

Participants:

CLiaw CCheng LFrank C!!cCracken l

9 4

+

g p e 'Ec%'o

' UNITED STATES s

e E j -),, < ('k NUCLEAR REGULATORY COMMISSION 3,.'\\

^

3

/'. E WASHINGTON, D. C. 20555

'[. * '

July;29, 1983 Docket No. 50-313 MEMORANDUM FOR: John F. Stolz, Chief Operating Reactors Branch #4, DL FROM:

Guy S. Vissing, Project Manager Operating Reactors Branch #4, DL

SUBJECT:

FORTHCOMING MEETING WITH ARKANSAS POWER & LIGHT COMPANY CONCERNING THE OTSG INSPECTIONS OF DECEMBER 1983 & JULY 1983.

Time & Date:

9:00 a.m. to 3:00 p.m.

August 31, 1983 Location:

Phillips Building, P-ll8 Bethesda, MD

Purpose:

To discuss: (1) Results of December 1982 inspections, (2) Metallurgical Examination of Pulled Tubes, (3)

Results of July 1983 examinations, (4) Cause of tube degradation, (5) Correction actions and (6) Concern for a midcycle tube inspection.-

Requested

Participants:

NRC Licensee B. D. Liaw John Marshall, et.al.

C. Y. Cheng Louis Frank.

Conrad McCracken G. Vissing Other B&W Representatives Guy Vissing, Pr ject Manager Operating Reactors Branch #4 Division of Licensing cc:

See next page

-