ML20024D112
| ML20024D112 | |
| Person / Time | |
|---|---|
| Issue date: | 07/15/1983 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Bruggerman W GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20024D114 | List: |
| References | |
| REF-QA-99900911 NUDOCS 8308030175 | |
| Download: ML20024D112 (2) | |
Text
r i
ML1539g3 Docket No. 99900911/83-02 General Electric Company Nuclear Energy Business Operations ATTN:
Mr. W. H. Bruggerman Vice President and General Manager 175 Curtner Avenue San Jose, California 95125 Gentlemen:
This refers to the inspection conducted by Mr. J. R. Agee of this office on April 18-21, 1983, of your facility at San Jose, California, and to the discussions of our findings with Mr. N. G. Shirley and members of your staff at the conclusion of the inspection.
This inspection consisted of an examination of your quality assurance program.
This ' included an evaluation of the implementation of your QA topical report and procedures relative to equipment qualification testing of safety-related electrical equipment.
Specific areas examined during the inspection and our findings are discussed in the enclosed report.
Within.these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
Within.the scope of this inspection, we found no instance where you failed to meet the commitments of your Topical Report No. NE00-11209-04A or NRC requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established.
Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information RIV h
EQS SC:EQS BC:VPB D:DV JRAgee/m s HSPhillips UPotap RLBa rt
/
7 / 4 /83 7 / w s3 7 //,g/83 (M/g/83 L
~ 0308030175 830715
%\\
PDR GA999 ENVGENE l
99900911 PDR
r General Electric Company sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Original Signed Bym Uldis Potapovs Uldis Potapovs, Chief Vendor Program Branch
Enclosures:
1.
Appendix A - Inspection Report No. 99900911/83-02 2.
Appendix B - Inspection Data Sheets (6 pages) bcc:
JTCollins, RIV RLBangart, RIV JEGagliardo, RIV EHJohnson, RIV MIS Section (J. Perry)
VPB Branch Chief VPB Section Chiefs VPB Inspector DMB-IE:09 SDRichardson, 0IE-DRP RFHeishman, OIE-RCB NBle, OIE-RCB VSNoonan, NRR-EQB RGlaGrange, NRR-EQB WSFarmer, RES LDBustard, Sandia National Laboratories, Albuquerque, NM i
l 4
f