ML20024D065

From kanterella
Jump to navigation Jump to search
Revised Average Daily Unit Power Level Page to Monthly Operating Rept for June 1983
ML20024D065
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/19/1983
From: Miller L, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8308030105
Download: ML20024D065 (2)


Text

._ ____ ____ ___-_ ____

JO PSEG

~

Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 i~

Salem Generating Station July 19, 1983 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 Please find attached a revision to the Average Daily Unit Power Level page of the Salem Unit No. 1 Monthly Operating Report for the month of June 1983.

.-incerely yours, feh iA J. M.

pko, Jr.

General Manager -

Salem Operations LKM:dmh CC:

Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director,. Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 d

~

8300030105 030719 P

PDR ADOCK 05000272

[ll R

PDR The Energy People

% 218'1 (20M) iI-81

8, O'

/

AVERAGE DAILY UNIT POWER LEVEL Docket No.

50-272 Unit Name Salem # 1 Date July 10, 1983 Completed by L. K. Miller Telephone 609-935-6000 Extension-4455 Month June 1983 Day Average Daily Power Level Day Averago Daily Power Level (MWe-NET)

(MWe-NET) 1 809 16 1084 2

1085 17 1089 3

1087 18 1083 4

1070 19 1084 5

1096 20 1061 6

1087 21 1112 7

1093 22 1091

- 8 1065 23 1094 9

1107 24 1091-

-10 1034-25 1105 11 1087 26 1063 12 1081 27-1087 13

'1090 28

'1080 14 1071

  • 29 1372

[.

15 1084 30 1104 31 0

j

[

This figure is the result of 'a meter correction. - The actual average daily y

power was~1069 (MWe-NET).

P.

8,1-7 R1 i

Page 1 of 1

[L w-