ML20024C937
| ML20024C937 | |
| Person / Time | |
|---|---|
| Issue date: | 06/24/1983 |
| From: | Palladino N NRC COMMISSION (OCM) |
| To: | Markey E HOUSE OF REP., INTERIOR & INSULAR AFFAIRS |
| References | |
| NUDOCS 8307200320 | |
| Download: ML20024C937 (3) | |
Text
.
?
UNITED STATES f
Jg, g'
NUCLEAR REGULATORY COMMISSION g
W ASHINGTON, D. C. 20555 g
gp
%,..... /
June 24, 1983 CHAIRMAN The Honorable Edward Markey, Chairman Subcommittee on Oversight and Investigations Committee on Interior and. Insular Affairs United States House of Representatives Washington, D.C.
20515
Dear Mr. Chairman:
This letter will inform you that the Comission is providing 24 Commission papers ("SECY papers") to your staff, at its request, covering a variety of regulatory topics over the last year and one half.
Some of the documents are more sensitive than others.
However, none of them are in the Commission's Public Document Room and therefore, are not available to the public. The Comission requests that access to these dccuments be re-stricted to the Subcommittee members and staff.
k-Sincerely,
~f~~
Nunzio J. Palladino
Enclosures:
As stated cc:
Rep. Ron Marlenee O
8307200320 830624 PDR COMMS NRCC CDRRESPONDENCE PDR
LIST OF SECY PAPERS SECY PAPER NO.
TITLE DATE SECY-82-77 USE OF POTASSIUM I0DIDE FOR THYROID BLOCKING 2/19/82 SECY-82-121 STATUS OF STUDIES ON POSSIBLE ALTERNATIVES FOR 3/18/82 TMI-2 ACCIDENT WATER DISPOSITION SECY-82-141 RESULTS OF OPERATOR LICENSING EXAMINATIONS 4/5/82 SECY-82-141A RESULTS OF OPERATOR LICENSING EXAMINATIONS 5/23/82 SECY--82-157A STATUS REPORT ON THE'NRR INVESTIGATION OF THE. EFFECTS 7/16/82 0F ELECTROMAGNETIC PULSE (EMP) ON NUCLEAR POWER PLANTS SECY-82-168 REVISION OF 10 CFR PART 20:
STANDARDS FOR PROTECTION 4/21/82 AGAINST RADIATION SECY-82-177 DIRECTOR'S DENIAL 0F 2.206 RELIEF (IN THE. MATTER OF 4/26/82 PETITION REQUESTING "CLOSEDOWN (OF) ALL SUSPECT REACTORS" PENDINE RESOLUTION OF ALL PRESSURIZED-THERMAL-SH0CKNON-CONSERVATISMS)
SECY-82-195 QUALIFICATIONS OF PERSONNEL OPERATING THE SALEM PLANT 5/14/82 DURING THE CURRENT STRIKE SECY-82-221 STUDY OF STAFF ROLE IN CONTESTED NUCLEAR POWER REACTOR 6/3/82 INITIAL LICENSING PROCEEDINGS SECY-82-243 STATUS OF THE NRC INTEGRATED SAFEGUARDS INFORMATION 6/10/82 SYSTEM (ISIS)
SECY-82-251 MANDATORY PROPERTY INSURANCE FOR DECONTAMINATION OF 6/16/82 NUCLEAR REACTORS f
SECY-82-279 NUCLEAR PLANT RELIABILITY DATA SYSTEM (NPRDS) 7/1/82 SECY-82-346 TMI-1 RESTART - STATUS OF STAFF EFFORT ON 8/19/82 PSYCHOLOGICAL STRESS
- SECY-82-346A TMI-1 RESTART - STATUS OF STAFF EFFORT ON 9/13/82 f
. PSYCHOL 0GICAL STRESS SECY-82-409 STATUS 07 ENVIRONMENTAL QUALIFICATIONS OF 10/8/82 ELECTRICAL EQUIPMENT SECY-82-460 RESULTS OF OPERATOR LICENSING EXAMINATIONS 11/17/82 SECY-82-466 PRELIMINARY STAFF ANALYSIS OF STEAM GENERATOR TUBE 11/24/82 RUPTURE RISKS SECY-82-483 TMI-1 RESTART CERTIFICATION STATUS AND NUREG-0737 12/9/82 ITEMS STATUS UPDATE E
-?-
SECY PAPER DATE NO.
TITLE SECY-83-20 ISSUING RENEWALS OF OPERATOR AND SENIOR OPERATOR 1/17/82 LICENSES PENDING COMPLETION OF THE FIRST REQUALIFI-CATION EXAMINATIONS SECY-83-30 TMI-RELATED REQUIREMENTS AT OPERATING REACTORS 1/21/83 SECY-83-44 DEVELOPMENT OF THE SCOPE OF GUIDELINES TO FACILITATE 1/31/83 RECOVERY EFFORTS IN THE EVENT OF NUCLEAR-RELATED ACCIDENTS.AT OPERATING POWER PLANTS
~
SECY-83-72 RESULTS OF OPERATOR LICENSING EXAMINATIONS 2/18/83 SECY-83-93 GUIDELINES FOR LONG-TERM IMPROVEMENTS IN LICENSEE 3/9/83 MANAGEMENT AND ORGANIZATION (TMI ACTION PLAN ITEM I.B.1.1.)
SECY-83-105 ENERGY TECHNOLOGY COMPARABILITY STUDY 3/15/83 e
9
. -. _ - -..