April 12, 1979 NRC I&E Interview Okay.
uh did you did you have any feeling of about the uh motor the electromatic relief valve at that time?
uh well what was what was your..?
ZEWE: As soon as we had tripped and Ken Bryan the other shift supervisor came over from unit one and I asked him to look over the ccsaputer alarms and he he looked at the discharge temperatures of the relief valves and he said that RCRV-2 the electro-matic was a little bit higher than normal but it was only about 225 or so, normally it runs about 180 or so.
A i
DEFENDANT'S EXHIBIT U. S. DIST. COURT S. O. OF N. Y.
50c( A A FPWM-t 36 76 2948 93tB i
l B307130078 790412 PDR ADOCK 05000289 T
HDL
April 12, 1979 NRC I&E Interview
- Okay, uh did you did you have any feeling of about the uh adtor the electromatic relief valve at that tise?
uh well what was what.was your..?
Z2WE: As soon as we had tripped and Ken Bryan the other shift supervisor.came over from unit one and I asked him to look over the cczuputer alarms and he he looked at the discharge temperatures of the relief valves and he said that RCRV-2 the electro-matic was a little bit higher than normal but it was only about 225 or so, normally it runs about 180 or so.
DEFENDANT'S EXHIBIT U. S. DIST. COURT S. D. OF N. Y.
50c( A A
,-;.;....m 1
.y,-
,--r
.-.,,-----_-_--_m