ML20024C640
| ML20024C640 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/05/1977 |
| From: | Frederick E METROPOLITAN EDISON CO. |
| To: | Collins P Office of Nuclear Reactor Regulation |
| References | |
| TASK-*, TASK-GB GPU-2152, NUDOCS 8307120918 | |
| Download: ML20024C640 (4) | |
Text
%
G94 2.I52.
-..n.<
a
- /
l
??!f.r7.3
./
? C '.' L wou^
/
/
METROPOLITAN EDISON COMPANY su.c..v:.
..: :: vr.r.w::s :ansou. :.,
POST OFFICE BOX 480 MIDDLETOWN.PENNSYLV ANIA 17C57 TELEPHONE 717 944 4C41 July 5, 1977 Mr. Paul F. Collins 4
[W p g-erator Licensing Branch g
Directorate of Licensing m [* Y' JA Danye Nuclear Regulatory Co=tission Washington, D.C.
20545 Dear Mr. Collins.
Please consider this applica' tion for a Reactor Operator's License examination.
In accordance with Section 55.10 of 10CFR55, the following }nformation is submitted:
1.
Name:
Edward R. Frederick 215 Hemicek Hall e
Middletown, Pa.
17057 h:
27 - Citizen of the U.S.A. by birth.
Present Emoloyment: Control Room Operator, Mietropolitan Edison Company, Three Mile Island ttuclear Station, Unit II.
I 2.
(A) Education:
1.
Pasack Hills High School (1963-1967) - Graduated - Lantonville, N.J 2.
Patterson State Teacher's College (1967-1968) - Did not graduate -
Wayne, N.J.
l 3.
International Correspondence Schco1~ (1974) - Electrical Engineering (Power Option) - Graduated - Scranton, Pa.
l pg 4.
Interior Ccamunications "A" School (3 m0)(1968)
, Graduated -
, r; Great Lakes, Ill.
l go, Sg 5.
Nuclear Power School (6 mo)(1963-1969) - Graduated - Bainbridge, E o
. og 6.
51C !!uclear Prototype School - Operations - (6 co)(1969) - Graduats l @a Windsor, Conn.
! g4 7.
Research Reactor Training Program (1 wk)(1975) - Graduated - Penn
! og@o l
State University, University Park, Pa.
n,
. Oh ' #
- .}fff;; -
..N-$ age N July 5, 1977 f
Mr. Paul F. Collins 4
i 2.
(B)
Experience:
1.
U.S. Navy (1968-1973).
My duties aboard the USS Sam Rayburn (1971-1973) included, testing l
and initial startup pf the 53G core.
I was also an electrical operator and maintenance supervisor of repair parts acquisitioning.
I operated the shipboard electrical plant and nuclear support system during nonnal and energency situations. Other duties included per-forming electrical maintenance during refit at Portsmouth ?!aval Shipyard.
2.
Auxiliary Operator "A"-fluclear ('11/28/73-10/6/75) Metropolitan Ediso-Company, Three Mile Island fluclear Station, Middletown, Pa.
Myexperiencea'sanAuxiliaryOperator"A"-NuclearincludedsSudying systems and writing operating procedures and alarm responses. I also operated systems and equipment for plant startup and acceptancs testing and performed switching and tagging.
3.
Control Room Operator-Nuclear (10/6/75-present) Metropolitan Edison
~ ~
Company, Three Mile Island !!uclear 4tation, Unit II, Middletown, Pa.
Experience as a Control Room Operator-Nuclear consists of studying plant systems, writing operating procedures and system lectures, operating equipment and systems for plant startup and acceptance te:
directing efforts of others in this direction, and performing switcf l
and tagging.
l 3.
Previous Operator's License - N0llE.
4.' License is requested to op-He a pressurized water reactor: Metropolitan Edison Company, Three Mi': i )and fluclear Station, Unit II.
5.
See attached letter, 6.
See Enclosure I.
7.
Medical examination will be forwarded under separate cover.
t l
Sincerely yours, Neo:.(d Oldd?& S ERF:kmr Edward R. Frederick j
l Enclosures l
l' 1
n
, f
.-_,-...,y
,..,..__,.,._.,.,,.%,_..,,,,m.m-,.,,,,, _ _ _
.m,__%,_m.,,
.m,., _,,,,,,, _.
,,,,m
.i
' mi~N'7
}.[f EllCLOSURE I
.[
TRAIrlIt:G PROGRAM
/
RECEIVED BY:
Edward R. Frederick The general outline of Mr. Frederick's training folicws:
1.
AUXILIARY OPERATOR "A" NUCLEAR TRAINIf!G PROGRAM (3/4/74-8/26/74)(1040 hrs) a.
Math (80 hrs) b.
Atomic Physics (20 hrs) c.
Nuclear Physics (60 hrs) d.
Reactor Operations and Kinetics (140 hrs) e.
CorePerformance(60 hrs) f.
PlantChemistry(40 hrs)~
g.
Nuclear Instrumentation (20 hrs) h.
Radiation Protection (80 hrs)
- i. Plant Operation (40 hrs)
- j. Studied primary and Secondary systems and operation thereof on an OJT basis (500 hrs) 2.
Uf!IT II CONTROL ROOM OPERATOR'S TRAINING (8/11/75-11/28/75)(640 hrs)
This program consisted of 600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> of on site classroom ' training covering reactor theory, reactor, operating principles, and Unit II systems. -
An additional 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> were devoted to instructor and operation of Penn State University's'TRIGA Mark III Reactor.
I manipulated the controls of this reactor through 10 meaningfull startups and 17 power level changes or. shut-downs.
3.
UtlIT II COLD LICENSE PRE-SIMULATOR TRAIT!ING PROGRAM (3/22/76-4/2/76)(80 hrs)
This course covered the following subjects:
a.
Integrated Control System b.
Control Rod Drive
~
c.
Non Nuclear Instrumentation d.
Reactor Theory e.
Electrical Distribution f.
Systems g.
Standardized Tech Specs 4
Ut!IT II COLD LICENSE SIMULATOR CERTIFICATION TRAIT!ING (4/5/76,-7/9/76)(320 hrs' This 8 week course was canducted by Babcock and llilcox at their L'ynchbur; Va. simulator training facility. A sur.ary of the training I received, examination results, and certificaticn are attached as Enclosure I.
-m.-
.-.---.....-.-..e.
,,....-..,,,y, m,,..--.
,,,..-v.
.,-r,.m
+--
m--
-~.,--,--.-,---.,_.,-.w----,
.v.--------,,...-.,
- s: C
'.**6ff UtlIT II CROSS LICEttSII:G TRAINIt!G-(9/13/76-3/31/76)(100 hrs)
<<',ge 4/k 5.
This program consisted of 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> of formal classroom instruction on It stressed the differences between Unit I and Unit II ;;SSS, Unit 2 systems.
secondary, and balance of plant systeas.
- 6. 'UilIT II OJT PROGRAM (I2/1/76-8/1/77)(Acorox. 300 hrs)
This is an audited procedures and systems training program stressing' self study and oral testin.g.
7.
TURSINE CONTROLS TRAINIttG COURSE (5/2/77-5/4/77)(20 hrs)
This program was conducted on site by Westinghouse Electric Corporation cnd stressed operation of the Autema' tic Electro Hydraulic (AEH) turbine controls and turbine operations.
UNIT II STANDARDIZED TECH SPEC TRAIflIt:G PROGRAM (5/16'/77-5/27/77) 8.
This course covered primarily the Unit II Standardized Tech Specs.
Other subjects reviewed include:
a.
Pro.cedures b.
ICS c.
Diamond Panel d.
Nuclear Instrumentation e.
Reactivity Balance f.
Operating History 9.
SIMUt.ATOR TRAINING PROGRAM (6/6/77-6/10/77)(4O hrs)
-I mdll have completed a 1 week course in TMI Unit II operator training ~
on the Babcock ana Wilcox Huclear Power Plant Simulator at Lynchburg, Va.
before my licensa testing date.
- 10. PitE SIMULATOR REVIEW COURSE (7/18/77-8/12/77)(80 hrs) 1 I' will have completed a 2 week raview course before my itcense testing date.
1 l
l-
.