Georgia Powa Company Post Office Box 4545 Atlanta. Georgia 30302 gf.CREggy,y Telephone 404 526 6526
,y.
gtgem g an g,wces.inc.
-on* GeorgiaPower De"Z*$#"'g" 5 83 g Southern CompanyServices 2
D. O. Foster Vice President and General Manager Vogtle Project June 24, 1983 United Statas Nuclear Regulatory Commission File:
X78G03-M38 Office of Inspection and Enforcement Log:
GN-238 Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303
Reference:
Vogtle Electric Generating Plant - Units 1 and 2 50-424, 50-425; Pullman Power Products, Quality of Welds and Radiographs Attention: Mr. James P. O'Reilly Gentlemen:
Georgia Power Company had previously reported a potential deficiency to the NRC concerning the above referenced item. Georgia Power Company has com-pleted its review of this concern and has determined that a reportable defi-ciency or substantial safety hazard does not exist.
A detailed engineering evaluation determined that the quality of welds was sufficient to withstand any potential accident or transient condition.
Therefore, the condition of the as-received pipe spool could not have degraded any safety-related system.
This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.
Yours truly, j
.6 D. O. Foster DOF/CWH/skr xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 R. J. Kelly R. H. Pinson E. D. Groover R. E. Conway B. M. Guthrie L. T. Gucwa G. F. Head R. A. Thomas M. Malcom 'd)VFIC g,CO J. T. Beckham, Jr.
J. A. Bailey G. BockhoT D. N. MacLemore
- 0. Batum P. D. Rice D. E. Dutton H. H. Gregory, III J. L. Vota IM W. F. Sanders l[l 8307120358 830624 D