ML20024C086
| ML20024C086 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 06/29/1983 |
| From: | De Lorenzo R, Delorenzo R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, G1-82-344, GO1-82-344, NUDOCS 8307120241 | |
| Download: ML20024C086 (2) | |
Text
.
Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 993g ( 09)372-5000
'S P!!1g: 37 June 29, 1983 REGIO /V V/G G01-83-344 Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, Claifornia 94596 Attention: Mr. D.M. Sternberg, Chief Reactor Projects Branch No. 1
Subject:
NUCLEAR PROJECT NO. 4 DOCKET NO. 50-513 REPORTABLE 10CFR50.55 (e)
ROCKBESTOS CABLE
Reference:
- 1) Telecon ME Rodin, Supply System to PP Narbut, Region V, Nuclear Regulatory Commission, dated January 26, 1982
- 2) G01-82-0060, dated February 26, 1982, DW Mazur to RH Faulkenberry
- 3) G01-82-0152, dated April 21, 1982, RW Root to RH Faulkenberry
- 4) G01-82-0413, dated July 2, 1982, DW Mazur to R.H. Faulkenberry Reference 3) informed your office of a
reportable deficiency under 10CFR50.55(e),
and transmitted an interim status report on the subject condition.
Reference 4) provided the Supply System's final report on the above caption condition.
Since it has been determined that the only cable involved is that used in the Unit 4 penetrations (see reference 4) this letter only refers to Unit 4 and Docket No. 50-513.
Due to the current indeterminant status of Unit 4, a completion date has not yet been established.
Therefore, we will defer any further updates until a completion schedule has been established or else no later than construction restart, whichever occurs first.
8307120241 830629 PDR ADOCK 05000513 S
PDR d uv l
Mr. D.M. Str.rnberg Rockbestos Cable Page 2
'G01-83-344 4
If you have any questions or desire further information, please advise.
DA[
R.A. De Lorenzo, Program Director WNP-1/4 RAD / GAB /cmh cc: TA Mangelsdorf, Bechtel (860)
V. Mani, UE&C (897)
HW Kwan, UE&C (8U6)
A Toth, NRC (917Q)
V. Stello, Director of Inspection, NRC 2
FDCC (899)
ORM (847)
I I
s i
a b
i
,-tr--r-,-,---ey,--
--ww
--m-,,%-c...
.,-y.,---,------m..
.--mm.
--y-r, a y --