ML20024B956

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP-2.110 Re man-caused emergencies,EP-2-120 Re Natural Emergencies & EP-2-140 Re Reentry
ML20024B956
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/01/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20024B952 List:
References
W3F83-0255, W3F83-255, NUDOCS 8307120046
Download: ML20024B956 (2)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _

l .

_ 4_. .

A LOUISIANA P OW E R & L I G H T,fp m cwoNoE srmr O box 6008

  • NEW ORLEANS. LOUIS 1ANA 70174 * (5041 3667345

'YUiNNfSSE U

June 1, 1983 W3F83-0255 Director of Nuclear Reactor Regulations US Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Waterford 3 SES Emergency Plan Implementing Documents Dear Sir In accordance with 10 CFR 50.47, transmitted herewith are two copies of the Waterford 3 Steam Electric Station revisions to the Emergency Plan Implementing Documents. These revisions are as follows:

EP-2-030 Emergency Radiation Exposure Guidelines and Controls, Rev 1, Change 1 EP-2-033 Administration of Iodine Blocking Agents, Rev 1, Change 1 EP-2-090 Accident Assessment, Rev 1, Change 1 EP-2-110 Man-Caused Emergencies, Rev 1, Change 1 EP-2-120 Natural Emergencies, Rev 1, Change 1 EP-2-130 Emergency Team Assignments, Rev 1, Change 1 EP-2-140 Reentry, Rev 1, Change 1 EP-2-150 Emergency Records, Rev 1, Change 1 EP-3-060 Emergency Communications Guidelines, Rev 1, Change 1 Please remove the old revisions, replacing them with the revisions outlined above. The superseded documents should be destroyed.

od Yo 8307120046 030624 sjs-PDR ADOCK 05000302 F PDR

.. u .

Page 2 W3F83-0255 Also enclosed are four white binders with Waterford 3 SES Emergency Plan Implementing Documents cover sheets and spine

covers. Two books are marked controlled copy 029 the other two books are controlled copy 030. Due to the numerous procedures it is suggested the Implementing Documents be posted in two volumes.

I

! If there are any questions pertaining to this submittal, please contact R. Azzarello at (504) 464-3292.

Very truly yours, fy mm

, F. J. Drummond Project Support Manager - Manager FJD/GPB/lmc Attachment cc: w/o

Attachment:

E.L. Blake, L. Constable, J. Wilson, D. Perrotti, C. Hackney, S.E. Turk, i G. Groesch i

1 i

t 4

l l

_