ML20024B953

From kanterella
Jump to navigation Jump to search
Public Version of Rev 9 to Emergency Plan Implementing Procedure Erpip 4.1.21, Personnel Assembly & Receipt Form
ML20024B953
Person / Time
Site: Calvert Cliffs  
Issue date: 05/23/1983
From: Rayburn C, Russell L
BALTIMORE GAS & ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
Shared Package
ML20024B948 List:
References
ERPIP-4.1.21-01, ERPIP-4.1.21-1, NUDOCS 8307120043
Download: ML20024B953 (14)


Text

..

ER?!P 4.1.21 Rev. 9 PERSONNEL ASSE.MBLY e'

RESPONSI3LE INDIVIDUAL:

Assembly Area Leaders Emergency Team Leaders i

OSC Director TSC Director CONDITION:

Alert l

Site Emergency General Emergency ACTION:

- NOTE -

Visitors shall have D designation and assemble at Warehouse 3.

L WAREHOUSE 3 (C & D PERSONNEL)

A.

Assembly Area Leaders 1.

INITIATE personnel accountability; LOG all personnel present and missing on Attachment 1, C&D Personnel Accountability Form.

2.

FORWARD completed Attachment I to Warehouse Assembly Leader.

3.

KEEP personnel at assembly area until directed otherwise by Warehouse Assembly Leader. ENSURE no smoking, eating, or drinking occurs in warehouse.

8307120043 830624 PDR ADOCK 05000317 F

PDR

1-ERPi? 2.1.2 '

Rev. 9

)

4 IMPLEMENT 'Varehouse Assembi:. '.ea:er instruc-icns.

B.

Tarehouse Assembly Leader 1.

ANNOUNCE your name, position, and !ccatien over warehouse P.A.

l 2.

RECEIVE completed accountability forms from Assembly Area Leaders. Use Attachment 2 to tally accountability results. COMPILE wareheuse accountability and list missing personnel en Attachment 3, Emergency Accountability.

3.

NOTIFY Security of accountability results as seen as possible s

(Ext.6 or W).

es.

RELAY all SEC instructions promptly to Assembry Area Leaders and 4.

personnel.

1 5.

VERIFY Assembly Area Monitoring Team member monitors warehouse area at 30 minute intervals during a radiological release, NOTIFY Radiatien Protection Director (RPD)(Ext. M orW if monitoring is not performed.

6.

MAINTAIN accountsbility of warehouse personnel.

1

' 7.

IMPLEMENT SEC directions.

)

ERPIP 0.i.21 R ev. 9 II.

CAFETERIA (B PERSONNEL) l A.

Emergency Team Leaders (or assimed individual) 1.

INITIATE personnel accountability; LOG missing personnel on, Emergency Team Accountabilitv.

2.

FORWARD completed Attachment 4 to Cafeteria Assembly Leader.

3.

NOTIFY OSC Director (Ext.M of team status.

- NOTE -

After being accounted for, Emergency Response personnel may report to their emergency assignment location.

B.

Cafeteria Assembly Leader 1.

ANNOUNCE your name and position to Essembled personnel.

2.

COLLECT completed accountability forms from emergency teams. Use to compile accountability.

3.

NOTIFY Security (Ext.MorM of accountability results as soon as possible.

4.

VERIFY an Assembly Area Monitoring Team member monitors cafeteria area at 30 minute intervals during a radiological release, NOTIFY Radiation Protection Director (RPD) (Ext. Wor W if monitoring is '

not performed.

ERPIot.!.i!

Rev. ?

N

' 5.

MAINTAIN accountability of cafeteria perse.-ne..

l III.

E.MERGENCY CENTERS (A PERSONNEL)

A.

Center Directors (or assir:ed individual) i.

INITIATE personnel accountability; LCG missing personnei en, Emergency Acceuntability.

2.

NOTIFY Security of accountability results as soon as possible (Ext. S ee W.

3.

VERIFY Emergency Center Menitoring Team member monitors the TJ OSC/ECC at 30 minute intervais during a radiciegical release, NOTIFY l-

, the Radiatica Protection Directer (RPD) (Ext.6'or6 if monitoring is not performed.

4 MAINTAIN accountability of emergency personnel.

\\

e g

4 of 4

cRP!P. '.1.21 4

Rev.9 ATTACHMENT 1 Page 1 of 2 C & D PERSONNEL ACCOUNTABILITY DATE:

GROUP:

DIRECTIONS:

Fill out Section I, listing names and emergency designation of persennel present at your assembly area.Section II shall be used to list name(s) of personnel known to be missing.

SECTION !.

PERSONNEL PRESENT NAME C/D NAME C/D NAME C/D 16, 31.

2.

17.

32.

3.

18.

33.

4.

19.

34.

5.

20.

35.

6.

21.

36.

7.

22.

37.

3.

23.

33.

9.

24.

39.

10.

25.

~

40.

11.

26.

41.

12.

'27.

42.

13.

23.

43.

14.

29.

44.

15.

30.

45.

- OVER -

~

u-_--_

ERPIP L.I.21 Rev. 9 s

)

ATTACHMENT 1 PAGE 2 2.: 2 C & D PERSONNEL ACCOUNTABILITY SECTION II.

PERSONNEL MISSING POSSIBLE POSSIBLE NAME LAST LOCATION NAME LAST LOCATION 1.

4.

2.

3.

3.

6.

When completed, turn in sheet to Warehouse Assembly Leader. Warehouse Assembly Leader shall for'vard all records *to Superviscr-Emergency Planning at emergency termination.

e Y

e 4

5 ERPIP 2.1.21 Rev.3 ATTACHMENT (2)

PAGE 1 OF 2 C & D PERSONNEL ASSEMBLY / ACCOUNTABILITY TALLY

^

^

~

ASSEMBLY COMPLETE

/

INCOMPLETE PRODUCTION MAINTENANCE DEPARTMENT MODS - MECH MODS - ELEC/SUPP MAINTENANCE - UNIT 1 MAINTENANCE - UNIT 2 TRAINING & SUPPORT PE - N ME-N NUCLEAR POWER DEPARTMENT AOMIN SERVICES CHEMISTRY o

PLANT CHEMISTRY o

PLANT LABOR o

WATER TREATMENT RAD SAFETY o

RAD CON o

RAD SUPPORT o

DOSIMETRY TRAINING & TECH SUPP o

TRAINING o

OPER LIC & SAFETY o

TECH SUPPORT o

NFM OPERATIONS & ELEC/ CONTROLS QUALITY ASSURANCE DEPT PURCHASING & STORES DEPT l

- OVER -

.. - - - - -. ~ -.... -. -. -

-.-...-., _,. -. ~ " ~ ;,.:.::. L

ERP!? 2.1.21 Rev.9 3

ATTACHMENT (2)

PAGE 2 CF 2 C & D PERSONNEL ASSEMBLY / ACCOUNTABILITY TALLY

^

ASSEMBLY COMPLETE

/

INCOMPLETE REAL ESTATE & OFFICE SERVICES l

o BUILDING SERVICES o

SECURITY SCREENING o

SECURITY TRAINING o

SECURITY ADMIN / SUPPORT EMPLOYEE SERVICES DEPT

. PROJECT MANAGEMENT DEPT l

CONTRACTORS CATALYTIC,

..')

l AIRCO/INSULTEMP BECHTEL CE HEERY/ 5 & O OTHER

's,

~~

^

o ERPIP L.1.21 Rev.9 f

l ATTACHMENT 3 EMERGENCY ACCCUNTABILITY ASSEMBLY AREA:

DATE:

The fellowing personnel have not reported to me within an estimated reasonable time:

NAME

+POSSIBLE LAST LOCATION 1.

2.

3.

4.

. 5.

6.

7

- 3.

  • !! unknod n, write "UK."

ACCOUNTABILITY REPORTED NOTIFIED SECURITY

/

Assembly Area Leader Time Report accountability as soon as possible to Security (Ext.WorW.

Forward all recerds to Supervisor-Emergency Planning at emergency termination.

+

_ _ -... j

ERPIP 4.1.2 '

Rev.9 ATTACHMENT 4 EMERGENCY TEAM ACCOUNTABILITY EMERGENCY TEAM:

DATE:

The following personnel have not reported to me within an estimated reascnable time:

NAME

  • POSSIBLE LAST LOCATION 1.

2.

3.

4.

3.

6.

7.

8.

  • !f unknown, write "UK."

ACCOUNTABILITY COMPLETE

/

Team Leader / Alt.

Time Forward completed form to Cafeteria Assembly Leader.

Forward all records to Supervisor-Emergency Planning at emergency termination.

  • rW Nehv

ERPlP 4.1.2:

Rev. 9 ATTACHMENT 5 EMERGENCY TEAM ASSEMBLY / ACCOUNTABILITY TALLY ACCCUNTABILITY EMERGENCY TEAM 4

COMPLETE

/

INCOMPLETE i

TSC ENGINEERS l

DOSIMETRY TEAM l

GATE ACCESS MONITORING l

FIRST AID TEAM ON-SITE MONITORING TEAM l

9f l

LIQUID MONITORING TEAM l

EMERGENCY CENTER MONITORING TEAM l

l OFF-SITE MONITORING TE! M l

I INSTRUMENT MAINTENANCE TEAM l

l ELECTRIC AL M AINTENANCE TEAM l

MECHANIC AL M AINTENANCE TEAM l

COMMUNICATORS i

The following persons have been reported missing:

1 NAME POSSIBLE LAST LOCATION 1.

2.

l 3.

4.

3.

6.

7.

t 8.

When completed, report accountability as soon as possible to Security (Ext.M or W.

/

Assembly Leader Time Forward all records to Supervisor-Emergency Planning at emergency termination.

.--. --..-..---. -..h:.==-

~

1 1

=

HJU 4. :. 22. REVIEW / APPROVAL IREVISION CHANGE REVIETER SIG/

SUPERVISOR POSRC PLANT SUPERINTENDENT DATE EPU SIG/DATE MTG

/DATE 9

l lh

.d:c.nwwk?b}t! n.uc l$0lbw.J/

9.i.7x 9

E b $ 'SkGr/b # 42.T*h, f4v)/V$

dh.

d[NA1N d((Nc.n 63-62 O_b[f, f/rg3 9

o o

m I

e e

i 4

4 e

o G

l 0

-~

l i

[

t l

..-.)

ERPI? '.1.$.

Rev.9 LIST OF EFFECTIVE PAGES PAGE NL'MBER REVISION 1

9 2

9 3

9 4

9 ATTACHMENT REVISION 1,Page 1 9

"I -

1, Page 2 9

2, Page 1 9

2, Page 2 9

3, Page 1 9

4, Page 1 9

5, Page 1 9

'T

.J

.t

,,n.,-

cS.lf U. S. NRC Div. of Operating Reactors Attn:

Robert A. Clark, Chief Washington, DC 20555 From:

Supervisor - Emergency Planning Emergency Response Plcn Implementation Procedures attached are for inclusion in your manual.

Please incorporate these changes and return this form, signed and dated.

/ @

W.

f'A'<%%

~

+

1 I have incorporated the above listed Emergency Response Plan Implementation Procedures into my manual.

l Signed Date e

l l

/ 5 m--..----.

f' '

'T r r r_-

_ y yy ; 3 7

'uwwn w www m j

.