Transcript of Zewe 790409 Interview.Page 14
ML20024B582
Person / Time
Site: Crane  
Issue date: 04/09/1979
From: Zewe
GENERAL PUBLIC UTILITIES CORP.
To:
References
TASK-03, TASK-3, TASK-GB B&W-4000A, NUDOCS 8307090326
Download: ML20024B582 (1)


Text

...

I 4000 R lY Ap'ril 6, 1979 GPU Interview ZEWE:

We had checked the discharge relief valve temperatures'very early, as soon as Ken Bryan got Unit 1.

I asked him to look over the com-puter alarms to help us out and then had him check

.the discharge temperatures of the' relief valves, and he said you know the RCRV 2 is a little high, about 30' high..

We knew that it had lifted so we felt that it was still cooling down, and that's why that I went off Mie RCRV 2 problem and back on something else.

I felt from that that it was alright.

I

\\

8307ago326 y Q $ 9 PDR ADOCK HOL T