Gives Tentative Approval to Fix Steam Generator Overfill Problem During Auxiliary Feedwater Flow Due to Seriousness of Problem
ML20024B571
Person / Time
Site: Crane  Constellation icon.png
Issue date: 03/14/1977
From: Rosalyn Jones
BABCOCK & WILCOX CO.
To: Engel S
BABCOCK & WILCOX CO.
References
TASK-*, TASK-GB GPU-0612, GPU-612, NUDOCS 8307090247
Download: ML20024B571 (5)


Text

t.-

g>

5 O

8307090247 770314 PDR ADOCK 05000289 P

HOL

,as<.:.w._-._

_a

.g i.

a hd b l 2. I.

i

!^.n.

.t r.

y,,-COX & Wit.COX CC:.tP A!!Y

~

/

.3

/

{

Q.,

.,,, GE!!ERATict! GROUP 9

'I i

i j'

S.J. Engel, Plant int: ration i

~

^

..]

j.g g

j R.C. Jones *ECCSAnalysis(2066) g.

ses 6.a.s

/

fil' No.

';st.

'# I'I'

,)

Std. Plant 205 T3.4 3

unj.

Date d

j Auxiliary Teedwater Steam Generator Overft11 Problem March 14,1977 j

g :=..

[

i H

j

'. j

Reference:

Memo. S.J. Engel to Distribution. Auxiliary Feedwater Stea:s Generator overfill-Heating Meetings 1/17/77. File T3.17.2.,

4,g 4

s In the referenced memo, a preposed "fix" for the steam generator everfill u

3 problem during auxiliary feedsater flow under accident cenditiens was discussed.

.?

-in the =eeting. I voiced an ECCS c:ncern on the preposed fix which was not mentioned

-P in the meeting minutes. Basically, the concern is whether the centro 11ed level, 8

l

6. feet with the fix, on the sec:ndary side of the steam generator is sufficient t

to control the consequences of a small break, less than 0.5 ft', in the RCS.

. c l

l The present flRC accepted small leak analysis for the 205 FA plants is givefrin, p

f-

?

BAW-10074A, Rev.1 and uses a 40 ft level in the steam eener.ator for auxiliary feedwater centrol. For small breaks, continued c;eratthi'of the auxiliary ef feedwater system help; depressuri:e the primary. system. Therefore, no analysis G.

presently exists for the 205 FA plants which su:perts the cenclusion that a j

6-foot level centrol is acceptable f:r mitigating small breaks. H: wever, there ~

p i

  • is presently scme c:ncern as to whether the steam generater : del in the L.

I CRAFT code,which calculates the blowd:wn during the accident, is correct.. A g

's study is presently planned by ECCS to try '3' simulate the steam generator codel

[.

8 l

prcperly for use in s=all break analysis. At the completion of, that program,

]

it will be determined whether a 6-foot level is acceptable.

i-l

~1 Because of the seriousness of the overfill problem. ECCS gives tentative apareval l

J l

to the fix. If the 6-fcot level is found not to he sufficient to control small f

1)reaks, it may be necessary to mcdify the steam generater instr==entation such

}

l that an acceptable secondary side c:ntrol height is obtained. Einal determinatica of the acceptable height c:ntrol will be cbtained near the end of cats su=er.

,]

{

i j

RCJ/1p

[

.I s

r cc:

3.A. Xarrasch C.W. Jones D.H. Roy R.O. Yesburgh 1

]

I.T. Putney R.J. Lowe D.W. LaSelle T.L. 'Jendland

(:

.]

B.H. Dunn G.M. Jacks K.

Schreeder J.C. Evans

[

i J.R. Biller A.F. McBride L.M. Lesniak C.C. Stremake i

N.H. Shah J.S. Shively G.J. Brazill R.J. Brockman L

C.W. Connell E.W. Swassen 1

r p

(>I

6 q

l bi z. _..

n

(

w b'

1'

~h 9

c*,.

-~q 0347 3

... ~.

O a

r l

n

.2-

'J'JI. 21 E74 eos.:ida.:r3 m t

imc O vtscas u m d a,Aso Otxetsitt O b ::iar C

/

CHANG ~ INCUIRY/

3,

/

AUTHCRIZATIct O so O wi#en 0 acxAi.

62atanaizatios j

k o

T'PE ''88 g'* c' t

0 otsica c:st 55FGS~SNO a

O are atent:T c=>=ct O itivisoir=1 t

(%

a O H Hetic, M @ e O r.icrisias i

stt Q InittF1CE

(

[P9030CT

[ CUSTo'si

.d

'M'

-{

ggh"/

I'47 Aov tPttf P.t0Ut ttcuterpraf 1

J

', a Oorica """
  1. a'~'""

-'e'"-d i

J

8 ps to (store. en.-. otic MAIL,t4Lai of et11'tH/J"3*lTICATies e

j.

1 l

43 P'hrit.

A StWM.

LiedC S g.grg, e s m 3 sNir/FU ppjya asest.it pesoraotet.

Rt os 3 6Y s1-$ a.rtavt-PNar -

i

]

/

[

SPW Pum PS

.ANO ceGN

-45.

MM S BL.) Iret.SticW L

,i U

firuo c.e w rrt=s vet.ves. cPet.Ahtt.

a ct t cW is am20:stro y

l To e do7F SFW-Ft o W e r'-

We sh E

Ge asst.AtcA

(,e3t Lt

,-Ov62.M t t L s e.*

/3 Sotap il F it J o ht5 L

i I

]

cFErt.a t e<t.

Ae M eai ta t hised il ist 4 uret

  1. 1 e ct-lb.k.cs.2eo e

M.le es tr. c..

i sotarientaistosition ge,,,

gg

,,ygg."

r.4HtcH R.eQuitt.et espai j

Ac.rssertc% 0 nera G41' WC E 5 t-GS "o AN " t,, owc ce J,

yHC 4 Ft.,0 O.e e4R.06 YALVr5

'fD S A.C I MON'4T s oMe. ( es gr.%cvisab t-c c.?M "e* ' s ** M. Mt t.Jit b.

l NOlc.1 P3.g rent-o v c o t e "o F.-

hWi" T?TMf% Cre4GTLSNtt. 37WCC 77fC p

j s.e/s.

cas s t Giet

'ce otit.:t s.d Po C.o M.. c y e c e.w M T!

sr.tu se a ca. e.c--

A n c ~ >c A s u.s rert.ur,sa-tw..,

e esgree,.

,se N e.J fg e et,.a r.ggeg ggo ?'e to f.grva:M,.,.

TWT ttEOctatto pcet.

n I

r.

.4r sv

-m cus cArtticac.zo.. 4. -. arvitsts oArt arriovta cart EgirY.t?&b.e.

~~.S 1

coc.ao.

3 v

$5.'.

j 1,

Y f

(

& h :$'.'l. 7 :

' b i ;i 55 MkN EIl IO.{Y.$'.3 d 3 ~'.*M l-i

[

g_3 4-

)

l 4

.. i tu !8'c3 GrA Tasrs astretts 4 __

r Ovat S L

I2i' Tast Titi.t id!s.l rS$'jfM l Sir, ic.CI/AAFF:

srca:n e-

, sait :

stoa

/ l7 *%: oere I eJ BW~ wn E h,u^ 2*?

1s.1M l \\lto ;9%,v.E5%MGh ]l*%dnW El. G--.$ '%An

~

I *) l2.o. lea :.~.mn. I t. Ice ss....e triry,q 5.:. gyg.,,gg/g,.;

o rJ N b..-

.: a ' ~

..M

=.suh - - - -

u i

m arr C.'t.5*l l l I* 6-CS~rA s if Fh'f GQ, Q@iqq y,tg,l 2"l *$

W\\ l S.~7 SR. C C l.!

$k1'on Y.'/*

77 cn

/.'s r o N&M W.7; ' ' ' 'a '-b s.,. e e

./

  • 1,06. " (

w

e.. ns.

p i

)

~W k All 7. sirs inphd aos <*ffiscr-voc - s e-sa n es,sTrcaf l

\\..

e-

~

J

~

a

"~

.___y-

,,7

(

l 3...>,.

e a

y o.

1 K

,"j w-m.

_ g a~

u j

p y,r,ta ceeof St :

-of Produsessand Utilisseen Famaans 8883-3 f..

=

A rruoo i

G

~.!

(3) All appropriate personnel trained to respond to safeguards incidents 7.5.'

t g ge g n,...*- E W -

as outlined in the plan and specided in the detailed Procedores.

.~?j

~~

v The licensee shall provide for the development, resion, implementation, and

'y

& G4. #"I 8',

maintenance of his safeguards contingency plan. To this end, the licensee shan

.;3 provide for a review at least every 12 months of the safeguards continge.e,

-q

'4 5

plan by individuals independest of both security program management an'd I

L personnel who have direct responsibility for implementation of the security 4

progrant. The review shall include a review and audit of safeguarda con-12 -

2 singency procedures and practica, an audit of the security system testing and I3 reaintenance program, and a test of the safeguards system along with emm.

T3 mitments establish for response by local law enforcement authorities. The V.*

results of the review and medit. along with recommendations for improre.

I 4

4 }-

i asents, shall be docuenented, reported to the licensee's corporate and plaat 44 3

management, and kept available at the plaat for inspection for a period of two i

1 M[}1 Ll d

years,

.- [

'l f5es. 30.54 as amended efective_ Jane 2.1963 (23 F. R. 31961:Joasary

  • [

d a

30,1967, efective afarch 9.1967 (32 F. R. 2562): February 14,1973. efectrve d'

Afarch 16.1973 (38 F. R. 4335): August 17,1973, efective September 17.1973 8

j (38 F. R. 22222) amended cKective December 6,1973 (35 F. R. 30533)t I

.'t W

amended efective 3farch 3,1975 (40 F. R. 8790); amended efective Apra n

19,1976 (4I F. R.16446): amended llay 3.1976. efective June 2,1976 (41 F. R.18303): edicially corrected 3 fay 24.1976 (41 F. R. 21177 armended b

L 23,1978,y 24,1977, efective 3farch 25.1977 (42 F. R.10838

]

Februar LT*

1 n

eKectivejune 6,1978 (43 F. R.11963).]

%..o>

1

.q (17440]

['

, ; h see. so.ss, condit!.as of construction permits-zach anstr ets pm.,

b 4

mit sha!! be subject to the following terms and conditions:

y (a) The permit sha!! state the earliest and latest datas for completion of 5

?

the mostruction or n=liAration.

f S

(b) If the proposed construction or modincation of the facility is noe l'

3 completed by the latest completion date, the permit shan espire and aA rights 4

I' thereunder shall be forfeited: Precided, Aewever, That upos good casse shows f

l

~

the Commission will extend the coropletion date for a' reasonable period of L

time. The Commission wi!! recognize, among other things developusental 3'.

problems attributable to the experimental nature of the faci!Ity or are. Soed, j

I explosion, strilre, sabotage, domestic violence, enemy action, as act of the j

.l elements, and other acts beyond the control of the permit holder, as a basis

~.y 6,

l for extending the comepletion date.,~

g

  • (c) Except as modined by this section and [50.55s. the constreetion

.,8 r

1

{

pennst shall be subject to the same conditions to which a license is subject, y

t!os(of the facility, the applicant will Ale any additional Information neededd) At o E

1 l

e M

to bring the original application for license up to date, and win ale na

?

application for an' operating license or an amendment to as application for 3

1 a license to construet and operate the facility for the issaance of as operating 4

,,. {

Ecesse, as appropriate, as specided la 3 30.30(d).

3

  • .G

'(ej (1) If the permit is for construction of a nuclear power plant, the i{ j.

l

'..D holder of the permit shall notify the Commission of each defeiency found la j.

l

.]

4. [

design and construction, wiiich, wers it to have remained uncorrected, could 4

j have afected adversely the safety of operations of the nuclear power plant at any time throughout the expected lifetime of the plant, and which..,. w:

. r NasisarReselasse Reports 10 C2'R 5 50.ss t744s y i.

i o

.p 3

y,... =.,..,y....

-.,.. w. p..... 3

~ ~.. -. hL o.3; o 3 4 o'

.-e,

.,. M e 2 y 4.

i

...o_.._-

j

.,-.-v-=

r,

-e


,,--.v-y,-

--yv,-,

,----,y-,--m-w

,------------e--#--e-w--

', %.F 4

4 t.

~

~

w q

y 1

[..

a, c

,i n

sess m

.d

-x=aarm.sr -r -

=

    • a

.mg j

c

  • )

1

'l (I) A signiacant breakdown la any portion of the quality assurance pro-I

.f j

gram conducted in accordance with the requirements of Appendia B; or g(

g.

1 (5) A signiscant denciency in Saal design as approved and released for 9i c

.. - _truction such that the design does not conform to the criteria and bases 9

L Ji stated la the safety analysis report or construction permit; or

')

4 4,

(iii) A signiAcant desciency in constrsection of or signiacant damage to a 2

j structure. System, or compoesnt whid will require extensive evaluation, entes=

p sive redesien, or extensive repair to meet the criteria and baset stated la the

'.1

('

safety anafysis report or construction permit or to otherwise establish the

,1

.i adequacy of the structure, system, or component to perform its latended

  • 1 s'

safety fonction; or P.C ).

'y pv) A signincant deviation L-sm performanes speci$ cations whid wilt Mf !

,)'

require extensive evaluation, extensive redesign, or extensive repair to estab.

4 t

Iish the adequaer of a structure, system, or component to meet the criteria I

and bases stated is the safety analysis report or construction permit or to

j.

J otherwise establish the adequacy of the structure, system, or cornponent to A

.a J

perform its Intended safety functica.

[.g j:

<i (2) The holder of a construction permit sha!! mithin 24 hosts notify the yc

.?

appropriate Nuclear Regulatory Comsnissica Inspection and Enforcensent 3

Regional OHice of each reporta53e desciency.

t 3

(3) The holder of a construction permit shall also submit a written report

/J ble de6ciency within thirty (30) davs to the appropriate NRC y

  • 4 y

on a

=

Office shown in Appendia D 'of Part ::$ of this chapter. Copies of

lj i

r j

report shall be sent to the Director of Inspection and Enforcement. U. S.

9 Nuclear Regulatory Commission, Washington, D. C ll0335. The report

??

  • ]

shall include a description of the desciency, an aralysis of the safety ira-e

. 'i L.

r plications and the corrective action taken, and suf8cient information to 4:I-J perunit analysis and evaluation of the deficiency and of the corrective action.

s l-If sudicient information is not available for a deAnitive report to be submitted 1

within 30 days. an interim report containing all available information'sha:I be

!.4 l

{

Aled, together with a statement as to when a complete report will be aled.

G (4) Remedial action may be taken both prior to and after ' oti$ cation of the Divisima of Inspecmon and Enforcement subject to the risk of subsequent dis.

4@

n A

e a,,,ovai.of sud action by the C. am.ssion.

3 a

4- -

i-bT 9.

4 8 i' 6

a l

y a

4

}

. d NI 2

3 4

f a

2

&.h k

o tg a

g =r n

c h

)

-v 1 7440 to cra s so.ss esm,c macar<scire c j

g a

m I

..y, l

.; N ' t- ;"M.- tedx.:70 - - ~ =. -

i

~

...... % r...

).

...., ~...

5

... - D_. g'." Y * ~

?

s' t

i l

,s..p 6,

g.i.l.I.._8 2_,S:

N 7- __ -

~

t

, - - - - -.. - ~

w

,m-y,

-y

-y--

,,.,e-,-

.,,.e-

--y,-.-,,,a,.,.-m

.wy.-w cw..,,,

-