Distribution From L. R. Cartin, Plant Integration (2835) ses us.s i
Cust.
File No.
'I E8I' All 205FA Plants 3xbj.
Date Forty Foot AW Level Impact September 13, 1978 l s w. s., i..............,
Distribution:
J. R. Burris B. G. Malone B. L. Brooks N. H. Shah J. F. Cuvelier P. A. Sherburn R. C. Jones R. O. Vosburgh B. A. Karrasch The addition and control of auxiliary feedwater to a forty foot level in the steam generators on B&W's 205FA Plants will require 1) the addition of wide range level sensing connections, 2) C&I equipment changes, and 3) timely 1
implementation to maintain present licensing schedules. All 205FA plants are affected; however, the impact will be plant specific since the design stage of the contracts range from pre-CP to final design. To aid in the development of future design change activites, At*:achment 1 and 2 are provided. nese attach-
=ents identify:
1.
205FA Plants affected.
p n,-. -T,. q q;*, [.a.
2.
Status of steam generator fabrication.
(. p.
- ],,,..e
~*'k 3.
Status of ECI/SRC1 design and manufacture.
4.
Present SAR statements relative to AW control.
5.* Present and anticipated licensing schedules.
In compiling the attached information, the following items are of primary importance:
1.
Field installation of additional level sensing connections will be required for the following plants:
NSS-15/16 (Remove plugs)
NSS-23 )
Add taps to steam generators, steam line or other NSS-24 )
acceptable location.
r 2.
The control of A W to a six foot level following both ESFAS and SRCI actuation of A W is a design feature of all 205FA plants per approval of CI/A-88-3957.
8307080797 78o913 DR ADOCK 05o00 TM.M
.y s
i Cartin to Distribution Page Two
~
Forty Foot AFW Level Impact September 13, 1978 3.
TVA (NSS-15/16) and WPPSS (NSS-23) will be lead plants for which an NRC review of AW level control instrumentation will take place. TVA, with its FSAR already filed, will ultimately reflect the required instrumentation change first.
4.
The present SAR discussions relative to AFW control can, at best, be described as incomplete in that many technical items are implied but not specifically stated. The SAR for the backlog 205FA plants reflect the various stages of evolution of the presented AFW control equipment. There is no consistency in the SAR information presented. All contracts will be required to update
{
their system design descriptions in their FSAR submittals.
~
LRC:dh Attach cc:
R. B. Davis S. H. Duerson B. M. Dunn D. W. LaBelle A. F. McBride l
E. W. Swanson E. A.-Womack 4
T*213'"
--_n___-.,.
ATTAC3tMENT 1 i
h 6-Foot AW Level Control S.ut Description 7-Tolloutng Level Control Level Control N
ESTAS & SRCI for for
.N Contract Steam Generator ECI/SRC1 Actuation 8
^*
NSS Customer Status Status (by Desitn)6 of AW of AW i
15 TVA Shipped Sh!pped Yes Yes - 6 foot (see No (Hanuel ESFAS Section 10.4.9.5 of override Required)
FSAR) 16 TVA Shipped Will Ship Late Yes See NSS-15 See NSS-15 Fall of 1978 i
19 Detroit Start Fabrication on Not Yet Quoted Yes SAR Not Submitted SAR Not Submitted 3-15-79 1
20 Detroit Start Fabrication on Not Yet Quoted Yes SAR Not Submitted SAR Not Submitted 3-15-79 23 WFPSS Shipped R M on 12/15/78 Yes Yes - 6 foot (see No Section 7.4.1.2.1 of rSAR) 2 d
24 FCE Shipped RDI in early 79 Yes Yes - 2 foot with RC No (Manuel Override Pump Running 6 foot of ESFAS Required) with Natural Circula-tion 30 FCE CONTRACT IN SUSFEt SICM
+
31 FASNY Tubing la Frogress Scheduled to RFM Yes Yes Yes 12/01/78 (Level Control Point t ot Stated, See l
PSAR Sectica 7.3.3.8 I) 32 WFPSS Shipped Scheduled to RFM Yes See NSS-23 See NSS-23 12/15/78 33 Chlo Scheduled to Ship on RD1'6/01/79 Yes Yes Yes 2/20/82 (Level Control Fotnt l'ot Stated, 1
See FSAR Section 10.<.9.2) 1 34 Ohio Scheduled to Ship on RFM ~6/01/79 Yes same as NSS-33 Same as NSS-33 4/20/R7 i
1.
Extra tape were installed in shop. Taps were plugted prior to 50 shipment. Field removal of plugs will be required.
'. The addition of level sensing taps will be required on-site.
q J.
C1/A being processed to add 6 additional tapa paar OTSC. Deadline for CI/A approval is 10/15/78 for in-shop installation of tops.
4.
Additional tape (2 per OTSC) added prior to shipment.
5.
RFM = Released for Manufacture.
6.
Six Foot AN control for ESFt3 actuation incorporated by C1/A 88-3957.
.,pgauYqayvr*Urev.,ypp5,Wy;va perw-wyr,vr.mr.- mmifY1rNd
,r.
,--,r-.-,-.
...-,.m.
.)
. ~....... -..... _
e ls ATTACilHENT 2 Babcock & Wilcox Licensing Experience [PSAR and FSAR) g
.,9
_e I.
_. 8 3,,,
4
..P e..t
.e.
-. se
..e,.e. e
._.e.,
e3.,
--3 St 3
.~
. ~ t&2
.4 e.d,63 t
_......e4 S-,6..
.-347 9-.
f f..,..,
- e...-6,
- 15..
4.
3.-.
.9...
- 3. B...
c'.
Ples fIree ese's teemed It-8-H eresse 3 3-87-47 3-948 l-19-47 6-18-69 9-Ib67 6-F68 4-3549 9 st-78
.-3 3-73 to pel n f emi.,ef. Seeee.
it-n-u u..F un-u
.-u-4 F i.- me,
t.....
9-i v..
& &-.9 4 n
.-,0-,.
(i 3-,.)
p P948 f 3 5 tes ll-f t-M 9-t-47 4-79-68 8-30-67 Il-39 47 88-39-67 I-I b 69 S-t-49 b le-FI 9-I l-Fi d B R F8)
Fled deeketed 18-IS-M b t-SP 4-7948 S-le-47 B 3-39-4 F BI-30-47 8-83-69 8-8-49 4-3 8-F 3 9-l b F t Sta teemed 8-4-49 8-5-60 9-S-49 4 4-48 to-I-64 e-13-68 14 33-7e 43-3-7e 3-34-34 3 p p9-73 at99 lessee 3-8 8-4 F 3-88-64 7-37-49 S-I S-se 9 H 7-1940 6-88-70 0-78-70 3-1 6-74 3-I k 7 3 Felle besetas 0-29-67 4-10 60 10-4 69 P-56-68 to-30 64 9-8744 43-4-70 3 83-78 4
le 8&te 5 7116 F4
- eevoettee permit 13-8-47 5-IS-60 38 4-49 9-35-64 33-6-64 to-8 848 37-14-13 3-3 6-78 II-34-74 P 34 QAJRtegerettee essened 30-8-64 3-b 69 te-F3 3-t-39 6-5 70 3 7e 6-35-74 3-3 73 80-85-77
( B-g -se5 )
PSAA fleet deoft Eeemed 4-34-69 38-51-49_
80-8-78 1-9-78 S-b 77 33 73 33-I-77 (g-3.a g )
4-e-ee $
Z-b-PBat filtog 6-3-49 9-bFe ble 3 3 B 4-3-7s 1 78 4-39 FF 3 3-B 3-- 72 (I 0 8 ))
te & "fg Pla4 doeketed 6-3-49 bl-Pe 4-b 74 3-9-78 4-8-78 l-t-75 80 't-PP Fit-il ace =9-ett tra teemed 8 3 7e F 7 9 P-8 0-73 9-F4 7-S-74 6-6-93 6-4-73 (4-h-79) lb74
[+
acas letter 9-33-70 S-lb73 6-84-33 9-Fe 30-38-74 6 84-73 9 33-73 (9 3S-79) 58497 (3-33-79)
PdIIe hemeleg (opt)
Ihee esse B&S-fl bff Bene same htl-75
( 4 79,8-t- col name 99eretleg 88sease 3-6-I3 Seit 3 80-6-73 6-49-34 (4-70) 88-76 bat-74 e-86-F4 (II-B-as) 4-33-f f '
4&bble&
entt 3 bl9-74 (p.35-gg) na na ma p his ilth 3B5-31/33 558-33/33 559-34/30 B55-35/36 1158-38 est-33/M Pentle Bowle-seese 9-Saa-393 e8 0
SerrF 3 6 4 WWF $ 6 4 Ses sage 363 Pas.1 este 3Dtten aft See Ptees Centract east everted 9-f 4-73 3 3 F4 3 F 9 9-I-Fl 6-54 74 9-9-75 8-73 5 3-B-74 PEAS fleet dreft f oemed 2-34-33 3-9-73 6-3-83 86-8-73 5-I-73 IIA 4-35-75 43 fleet deof t loseed 3-18-79 3-I-74 4-t - 74 6-35-79 9-45-79
,as f 8 t taa 4-IR-73 7-14-73 e 74 b le-74 8-39-79 l-3-76 30-34-79 Psaa dertered 3-39-F3 le-83-73 le-ge-F6 8 9-74 8-34-76 3-3 7F 3-I-79 9ER Geomed 5-3 9-74 F 3-PS l-83-94 (5-70) 9-t-7 F (4-78)
I-8-II acs letter 7-Ibl4 6-31-75 3-87-74(l)
(6-t-Fe) 80-83-77 (7-F9) 6-18-77 Pu6ite heertoa le-e- 74 lt-F)
(6-88)
(7-31-79) 13-tv pp E le-Ph )
Cemetemelles perust 83-30-74 33-75 (0-FO)
(30-8-78)
(9-t-70)
(4-8-79)
/
83-4-74 PEAR proposselen eteeted (a b t-Fel (1-89)
(33-83)
(te-se)
(9-st)
F5&A fleet deert teamed (9-p9)
(9-3 3)
(4-03)
( 3-81)
(3-a g)
Plaa (813 3 (33-3 79)
(31-03)
(3e-82)
(4-83)
(4-en F5AE decketed (3-80)
(3-gg)
(3-33)
(4 03)
(6-0 3) sta seemed (9-41)
(3-st)
(I-84) is-e n (3-81) acts lessee (83-33)
(4-81)
( F 84 )
(14-03)
(4-513 e
rattle beestaa teet)
I e.- tet 88-se t....,
6 1er,Ft-le
- meses som se emeinem ere eenwied deseen ett.ine, m ensuet desee, edieefa,ess stre
3 n
'O'***
.er THE BABCOCK & WILCOX COMPANY POWER GENERATION GROUP Tm j
DISTRIBUTION From J. K. MASSETH, LICENSING (Ext. 2201) sos eas.s Cust.
File No.
or Ref.
12E26.11 Subj.
Date BABCOCK & WILCOX LICENSING EXPERIENCE April 28, 1978 l m.
4.... 66 Attached is a copy of the April 1978 release of the B&W Licensing Experience (PSAR and FSAR). Please review and make any comments to the writer.
JKM/fl Attach DISTRIBUTION: Allen, LR Bertolotti, G Craig, RW Croft, Mii Deddens, JC Duerson, SH Embrey, NS Frye, DS Jones, JP Kulynych, GE Licensing Engineers Licensing Unit Managers Masseth, JK (balance of copies)
Olds, GM Project Managers Roy, DR Senior Project Managers Straub, RV Thomas, CE Travis, CC/TRG Weissert, LR e
g g
-G.\\t4 O\\3
s ATTACHMENT 1 Contract Steam Generator ECI/SRCI NSS Customer Status Status i
15 TVA Shipped Shipped h
1 h
Fall of 1978 19 Detroit Start Fabrication on Not Yet Quoted 3-15-79 j
20 Detroit Start Fabrication on Not Yet Quoted 3-15-79 f
23 WPPSS Shipped RMI on 12/15/78
.l 24 PGE Shipped RFM in early 79 m
4 l
30 PGE
-CONTRACT IN SUSPFJSION-31 PASNY Tubing in Progress Scheduled to RFM 12/01/78 32 WPPSS Shipped Scheduled to RFM 12/15/78 33 Ohio Scheduled to Ship on RFM - 6/01/79 2/20/82 34 Ohio Scheduled to Ship on RFM ~ 6/01/79 t./20/92 1.
Extra taps were installed in shop. Taps were plugged prior to SG shipment.
Field remov 2.
The addition of level sensing taps will be required on-site.
3.
CI/A being processed to add 6 additional taps power OTSG. Deadline for CI/A approval is 4.
Additional taps (2 per OTSG) added prior to shipnent.
5.
RFM = Released for Manufacture.
6.
Six Foot AW control for ESFAS actuation incorpog I/A 88-3957.
g.....
9 o
ATTACHMENT 1 6-Foot AW Level Control SAR Description Following Level Control Level Control ESFAS & SRCI for for ECI/SRCI Actuation Ac FAS Act (bv Design)6 of AFW of AFW Status i
Shipped Yes Yes - 6 foot (see No (Manual ESEAS Section 10.4.9.5 of Override Required)
FSAR)
Will Ship Late Yes See NSS-15 See NSS-15 Fall of 1978 Not Yet Quoted Yes SAR Not Submitted SAR Not Submitted Not' Yet Quoted Yes SAR Not Submitted SAR Not Submitted RFK' on 12/15/78 Yes Yes - 6 foot (see No Section 7.4.1.2.1 of PSAR)
RFM in early 79 Yes Yes - 2 foot with RC No (Manual Override Pump Running 6 foot of ESEAS Required) with Natural Circula-tion
-CONTRACT IN SUSPENSION
?r Scheduled to REM Yes Yes Yes 12/01/78 (Level Control Point l'ot Stated, See PSAR Section 7.3.3.8. 1)
Scheduled to RFM Yes See NSS-23 See NSS-23 12/15/78 REH - 6/01/79 Yes Yes Yes (Level Control Point Hot Stated, See PSAR Section 10.o.9.2) i RFM ~ 6/01/79 Yes Same as NSS-33 Same as NSS-33 l
l l r to SG shipment. Field removal of plugs will be required.
e.
D2:dline for CI/A approval is 10/15/78 for in-shop installation of taps.