Excerpt of Rc Jones Testimony at TMI-1 Restart Hearings. P 4,596
ML20024B444
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/30/1980
From: Rosalyn Jones
GENERAL PUBLIC UTILITIES CORP.
To:
References
TASK-*, TASK-GB GPU-2518, NUDOCS 8307080743
Download: ML20024B444 (2)


Text

.

-...-..-... -.-- -~.-...-... - ~.~.

.. -....... -.GN 2[/f 4596 1

B Y F.S. WEISS:

(Eese:ing) 2 You said, I think, that the instructors are 3 operated to fill the steam generators to 95 percent of the 4 operating range.

Is that correct?

I 5

A Yes.

6 0

I didn't hear what you said after that.

7 A

What I said after tha t -- that is the 4

8 instru ctions, but adequate heat re= oval could,be maintained 9 vith a lover inventory in the secondary side.

to o

Do you know hov lov?

1 11 A

It would be an elevation which corresponds to the 12'ov e r flow point within the reactor coolant pumps.

I am not 13 sure exactly what elevation that relates to with.in the steam 14 gene rator.

l 15 0

Do you knov if it is greater or less than 75 16 perrent on the opera ting range?

17 A

It is in that ballpark.

But I don 't know the k_18 specific nu:ber.

gg Q

Are there any condition s with respect to reactor 20 coolan t system pressure for effectiveness of the boiler 21 condenser mode ?

4 l

22 A

The only contribution that the primary system

  • 23 pressure vould have is that is must be at a higher pressure i

l 24 than the secondary system in orde:- to have a te=perature 25 differential to hEVe heat transfer.

~

8307080743 801130 PDR ADOCK 05000289 T

HOL A1.0ER$oN REPORTING COMPANY. INC, 400 VIRG!NIA AVE., S.W., WASHINGioN D.C. 20024 (202) 554 2345

.~-=

1.

GPU 2537 Excerpts from testimony of R.

C.

. Tones at TMI-l Restart llein ri sig n, A!!!.it t)ocke t tio. 50-289, 11/80:

4594:

23 -

4595:

17.