.. -....... -.GN 2[/f 4596 1
B Y F.S. WEISS:
(Eese:ing) 2 You said, I think, that the instructors are 3 operated to fill the steam generators to 95 percent of the 4 operating range.
Is that correct?
I 5
A Yes.
6 0
I didn't hear what you said after that.
7 A
What I said after tha t -- that is the 4
8 instru ctions, but adequate heat re= oval could,be maintained 9 vith a lover inventory in the secondary side.
to o
Do you know hov lov?
1 11 A
It would be an elevation which corresponds to the 12'ov e r flow point within the reactor coolant pumps.
I am not 13 sure exactly what elevation that relates to with.in the steam 14 gene rator.
l 15 0
Do you knov if it is greater or less than 75 16 perrent on the opera ting range?
17 A
It is in that ballpark.
But I don 't know the k_18 specific nu:ber.
gg Q
Are there any condition s with respect to reactor 20 coolan t system pressure for effectiveness of the boiler 21 condenser mode ?
4 l
22 A
The only contribution that the primary system
- 23 pressure vould have is that is must be at a higher pressure i
l 24 than the secondary system in orde:- to have a te=perature 25 differential to hEVe heat transfer.
~
8307080743 801130 PDR ADOCK 05000289 T
HOL A1.0ER$oN REPORTING COMPANY. INC, 400 VIRG!NIA AVE., S.W., WASHINGioN D.C. 20024 (202) 554 2345
.~-=
1.
GPU 2537 Excerpts from testimony of R.
C.
. Tones at TMI-l Restart llein ri sig n, A!!!.it t)ocke t tio. 50-289, 11/80:
4594:
23 -
4595:
17.