Text
3 o -.. -
g nr
~_
- 6 7
o i
THE SAB00CK & WILCOX CCMPANY l:
{
POWER GENERATION GROUS j
l To l
Customer Service Cepartment Staff From R. E. Xosi'oa. Manage'r i
Customer Service Department sas..a.s Cust.
file No.
or Ref.
Date Su bj.
_ Action / Info Items P.esulting from J. H. Mac.Millan Staff Meeting (Wintergreen 11/30 and 12/1/79)
Cecem::er 18, 1979 N. S. Elliott j
R. H. Ihde G. M. Olds P. E. Perrone J. D. Phinney F. J. Sattler R. E. Wascher.
The following action or infomation itees resulted frcm J. H. MacMillan's
~
Staff Meeting at Wintergreen November 30 and December 1,1579. Assigments are indicated:
1.
Initiate PSC re Pressure Relief Systes accounting for dynamics of liquid-water (vice valve only).
REtos tba (cc plete) 2.
Make provision and implement actions so emergency precedures frem each customer are checked out in simulator for adequacy befc e being used for training operators. Make appropriate use of engineering assistance in checkout.
NS Elliott 3.
Complete ATOG program for Operating Plants.
RE Wascher/M Nacior 4
Info item - Much discussion on SAW role in operating procedures /also role of Engineering,& Service in preparation and review of procedures. Systems engineer function and capability was discussed.
Berger will make long-tem recomendations to J. H. Mac'illlan by 1/15/80.
NB - Elliott-Olds-Wascher
'qisg y.. y Provide enhanced basic fundamental knowledge to cperater throuch ye.h.i. ;p 3 5.
REX comitted to provide JHM results of total review. Incid3e,]f.
utilization of As dy P.cbeson of VPI.
gg.i.3 1 /: : 4a J2-m.t) \\.!
- 1. m - s
@ t. 'j.dU' ' i ' 'IU '
^
e f.ist of action items drawn frca Kemeny Report, i,5U t Staff Reports on operatino personnel selecticn l
and training and en operatir.g precedures, plus initiative items frem Staff - By 1/10/80.
MS Elliott
- e. P.lan for review with custcmer c:anagement and JKi by 1/13/30.
55 Ellictt O22 l
Ex.~
Fw 10 We ag'-f f. gj 8307080734 791218 I
J.R. Danyo l
PDR ADOCK 05000289 P
HOL t
F 1 5 [6 8 f. of 3241o2s%))
1' e
.j.
.I L.
- -~
,n
1 o
o j
R 1
e P.
l
~
CS g_S a tt____________,________ _____:_2_:__ __ ____ __ ______ __gs;m c_1L_19 Z9 j
6.
RECALI. - Kostba obligated to report to JKi 1/15/80 on utility acceptance.
This is a necessary item for each unit. Input requasted by i
1/4/80.
Rt Wascher/PE Perrene 7.
Main Feedwater Reliabt.lity Study - Info item - Action will be by D. H. Roy,to me.
8.
Action required to implement chan.;e so SFAS resets to preclude the HS Elliott-identified sequence (SFAS, turn on HI, turned cff with 500 subcooling and then a second calfunction drops pressure agafe below l
SFAS actuation). Elliott assist.
RE Wascher/ Prod. Mar.
9.
Kostba ccmitted to impicment comunications to each site.
D. W.
Montgomery noted performance of RAPAFAI used by Breeder group--
should consider. Request Actiotr -
GM Olds /KR Ellison b
- 10. Kosiba comitted to prepare and implement NPG0 Plan. Consider J,
D. W. Berger BEST ideas.
RE Kosiba/GT Fairburn
- 11. NPGD Precedures -- A. L. MacKinney will propose assignment of key
[
individuals / sponsor owners for each precedure. Objective is to allow one-on-one trea'tment of questions for interpretation or for determining need for change. This would not degrade Fr.scedures L
b Task Force, but recognizes the ' task force' is a cemittee not normally available for operational day-by-day points that co.ne up.
Info.
12.
Info item - J. C. Deddens has action to resolve NPGD position on location of RCP centrols in Midland Control Room.
c 13, The issue of realizing an adequate / reliable power supply for ICS was discussed. Recognize FEMA folicw thru should accomplish.
F Request action:
RE Wascher/ Prod. Mar.
t.
- 14. Items 13,12 and 8 above suggest our institutional role / pattern of action with customers is causing difficulty in getting items implemented.
Utilizing experience in resolution of those items, consider alternate.
concepts for Operating Plants whereby NPGD took on the "*esign Agent" role. The objective.would be to keep design current and act for cwner on changes for design analogous to the " Maintenance Contrictor" for r.aintenance. Economy of marketing and proposal effort c:uld be RE Wascher/2M Olds /RE Kosiba r
realized.
- 15. Agreed to send transient evaluation of 03-1 Septe-ber 18 trip to JH'i.
~
This was done and cement received back "This Icoks very socd -- good exam.71e for future reports."
[
Follow-up cc.cleted to send to custcmer management. REWas:her/DA::a:ier/:!':siba.
I
(
y 7
F15 [6 8 4 0
^^
324 J_O 2 8 f}
- p f-
=
1 2
1 g!.'
9
~
CSD Staff Dece-ter la.1979
- 16. Action needed to put Transient Evaluation in place with er.thusiastic customer acceptance.
RE Vascher/".1, i:aci:e Transient Evaluation program should be put in place fcr 5:zrtup Plants.
17.
Consider developing criteria for initiating such an analysis during MFT program.
C4 Olds ~
- 18. Product Manager function needs strengthening. Evident from several items above (5,16,6, etc.) and other discussic.s. 'ction by 1/4/80.
RE Wascher REK:vp.
e I
I i
l
~
s
~
F 15 ~6 8 4 2)
TO Z__ i_ j j
L v24 y
3 g --- - - -
m-w
.-.