Submits Action/Info Items Resulting from Jh Macmillan 791130.1201 Staff Meeting at Wintergreen
ML20024B440
Person / Time
Site: Crane  
Issue date: 12/18/1979
From: Kosiba R
BABCOCK & WILCOX CO.
To:
BABCOCK & WILCOX CO.
References
TASK-06, TASK-6, TASK-GB GPU-0233, GPU-233, NUDOCS 8307080734
Download: ML20024B440 (3)


Text

3 o -.. -

g nr

~_

  • 6 7

o i

THE SAB00CK & WILCOX CCMPANY l:

{

POWER GENERATION GROUS j

l To l

Customer Service Cepartment Staff From R. E. Xosi'oa. Manage'r i

Customer Service Department sas..a.s Cust.

file No.

or Ref.

Date Su bj.

_ Action / Info Items P.esulting from J. H. Mac.Millan Staff Meeting (Wintergreen 11/30 and 12/1/79)

Cecem::er 18, 1979 N. S. Elliott j

R. H. Ihde G. M. Olds P. E. Perrone J. D. Phinney F. J. Sattler R. E. Wascher.

The following action or infomation itees resulted frcm J. H. MacMillan's

~

Staff Meeting at Wintergreen November 30 and December 1,1579. Assigments are indicated:

1.

Initiate PSC re Pressure Relief Systes accounting for dynamics of liquid-water (vice valve only).

REtos tba (cc plete) 2.

Make provision and implement actions so emergency precedures frem each customer are checked out in simulator for adequacy befc e being used for training operators. Make appropriate use of engineering assistance in checkout.

NS Elliott 3.

Complete ATOG program for Operating Plants.

RE Wascher/M Nacior 4

Info item - Much discussion on SAW role in operating procedures /also role of Engineering,& Service in preparation and review of procedures. Systems engineer function and capability was discussed.

Berger will make long-tem recomendations to J. H. Mac'illlan by 1/15/80.

NB - Elliott-Olds-Wascher

'qisg y.. y Provide enhanced basic fundamental knowledge to cperater throuch ye.h.i. ;p 3 5.

REX comitted to provide JHM results of total review. Incid3e,]f.

utilization of As dy P.cbeson of VPI.

gg.i.3 1 /: : 4a J2-m.t) \\.!

1. m - s

@ t. 'j.dU' ' i ' 'IU '

^

e f.ist of action items drawn frca Kemeny Report, i,5U t Staff Reports on operatino personnel selecticn l

and training and en operatir.g precedures, plus initiative items frem Staff - By 1/10/80.

MS Elliott

e. P.lan for review with custcmer c:anagement and JKi by 1/13/30.

55 Ellictt O22 l

Ex.~

Fw 10 We ag'-f f. gj 8307080734 791218 I

J.R. Danyo l

PDR ADOCK 05000289 P

HOL t

F 1 5 [6 8 f. of 3241o2s%))

1' e

.j.

.I L.

- -~

,n

1 o

o j

R 1

e P.

l

~

CS g_S a tt____________,________ _____:_2_:__ __ ____ __ ______ __gs;m c_1L_19 Z9 j

6.

RECALI. - Kostba obligated to report to JKi 1/15/80 on utility acceptance.

This is a necessary item for each unit. Input requasted by i

1/4/80.

Rt Wascher/PE Perrene 7.

Main Feedwater Reliabt.lity Study - Info item - Action will be by D. H. Roy,to me.

8.

Action required to implement chan.;e so SFAS resets to preclude the HS Elliott-identified sequence (SFAS, turn on HI, turned cff with 500 subcooling and then a second calfunction drops pressure agafe below l

SFAS actuation). Elliott assist.

RE Wascher/ Prod. Mar.

9.

Kostba ccmitted to impicment comunications to each site.

D. W.

Montgomery noted performance of RAPAFAI used by Breeder group--

should consider. Request Actiotr -

GM Olds /KR Ellison b

10. Kosiba comitted to prepare and implement NPG0 Plan. Consider J,

D. W. Berger BEST ideas.

RE Kosiba/GT Fairburn

11. NPGD Precedures -- A. L. MacKinney will propose assignment of key

[

individuals / sponsor owners for each precedure. Objective is to allow one-on-one trea'tment of questions for interpretation or for determining need for change. This would not degrade Fr.scedures L

b Task Force, but recognizes the ' task force' is a cemittee not normally available for operational day-by-day points that co.ne up.

Info.

12.

Info item - J. C. Deddens has action to resolve NPGD position on location of RCP centrols in Midland Control Room.

c 13, The issue of realizing an adequate / reliable power supply for ICS was discussed. Recognize FEMA folicw thru should accomplish.

F Request action:

RE Wascher/ Prod. Mar.

t.

14. Items 13,12 and 8 above suggest our institutional role / pattern of action with customers is causing difficulty in getting items implemented.

Utilizing experience in resolution of those items, consider alternate.

concepts for Operating Plants whereby NPGD took on the "*esign Agent" role. The objective.would be to keep design current and act for cwner on changes for design analogous to the " Maintenance Contrictor" for r.aintenance. Economy of marketing and proposal effort c:uld be RE Wascher/2M Olds /RE Kosiba r

realized.

15. Agreed to send transient evaluation of 03-1 Septe-ber 18 trip to JH'i.

~

This was done and cement received back "This Icoks very socd -- good exam.71e for future reports."

[

Follow-up cc.cleted to send to custcmer management. REWas:her/DA::a:ier/:!':siba.

I

(

y 7

F15 [6 8 4 0

^^

324 J_O 2 8 f}

p f-

=

1 2

1 g!.'

9

~

CSD Staff Dece-ter la.1979

16. Action needed to put Transient Evaluation in place with er.thusiastic customer acceptance.

RE Vascher/".1, i:aci:e Transient Evaluation program should be put in place fcr 5:zrtup Plants.

17.

Consider developing criteria for initiating such an analysis during MFT program.

C4 Olds ~

18. Product Manager function needs strengthening. Evident from several items above (5,16,6, etc.) and other discussic.s. 'ction by 1/4/80.