Submits Status of Action Needed to Complete Review of Procedures & Practices on Reporting & Resolving Site Problems
ML20024B392
Person / Time
Site: Crane  Constellation icon.png
Issue date: 09/04/1979
From: Kosiba R
BABCOCK & WILCOX CO.
To: Macmillan J
BABCOCK & WILCOX CO.
References
TASK-*, TASK-GB GPU-0221, GPU-221, NUDOCS 8307080608
Download: ML20024B392 (2)


Text

.8;2.._

.m

,.... #.... e

~

O m._

t lTHESt.FCOCK&'dtt.CCXCOOY

~

d4.

^

POIER' GE!:ERATIO!I GROUP 2

To l J. H. MacMillan, Vice Prwsid it Nuclear Power Generation Division free R. E. Kestba. Manager Customer Service Department, NPGD (3469) ses **s.a

}.

Cust.

Fil* No.

[~

or het.

[

Svej. Service Sulletin/Use of Operating Emperience.

Date Pmgress Rc;tre of. Upgrade /.ctions September 4.1979 F

ga---.

t Your memo of 23 July 1979 on Service Sulletins requested I *.ake the lead in

(-

review of our procedures and practices on reportirg arid resolving sita I

problems; 1.e., how we use operating esperience.

i Sface this sector of our business had already had considerable review as part of our Key Irsues effort in January (Availability Upgrade - Issue 4.7), I can report completion of several elegients of action needed rather than recommen-dations. The status is summarized below P

1.

MPGD instruction (Rev. 7) was issued (20 August) to upgrade SPR harJ1tng including key points:

o fianager. Operating Plant Services or Startup Services (for MSS) responsible for ticaly initiation, technical quality and proper h

closecut. (Previously lower level support engineers chased this.)

i k

o Unit !'.anager sign-off for Engineering and Maintenance on adequacy f.

of ff'x a,ndf, accountabia action for cross-contract appilcab111ty.'

o BOP failures impacting M55 faciuded in Scope.

+

s 2.

.stanagement Directive (Deddens/Roy/Kostba) of 31 Aug;nt 1979 establisheJ

[

oriority levels and allowable time intervals for rvsponse.

t i

l E.

3.

Trainina programs for Rev. 7 NPGD 0503-04 completed in August.

j e conducted ' periodically on f

4.

Manacement review by DeCarif will b,e,. ion to the September / October isolementation giving special attent period so that we get off on the right track with the new instruction.

~.

l 5.

Funding arrangements to allow processing of SPR's have been agreed to t

in principio.for an interim period. Monthly reviews are planned to i

shake down the dollars management.

L a

2 hk.,"

8 Ex.

2R7298eRegggge, eg.p.

t

~

o e9 JJt. or i I 324 y g g--

F15 [6 9 5 7J i

'.)

g-.

[

hl f-~

  • ..,.. - s,~ ~m *- w ~ ~. ~.: - -
)

_ wa.

. -.. 1 Y.,

t*)

r J. H. flacMillan 2-Segety9]

6.

Abnormal Transient Ocerating Guideline program is being funded by Owners Group. and is uncerway. These guidelines form a currently controlled baseline ofTur guidance to owner operations, and as such provide an r

exercised circuf t available for coenunicating changes which derive from w

operating experience.

t 7.

" Quick Look" evaluation of transients / reactor trips has been formulated as a pmgram under discussion with Owners Grouo. Scme Owners have accepted.

(

We will implement,on a risk basis and formal acceptance by Owners is expected within two weeks.

8.

Data Cs11ection for transients has been poor. For Quick Look we will be I

dependant on manual and phone data collecton. but our RECALL. (Logger) proposals. are expected to be out by mid-Septancer. We were scheduled T.

for 9/1/79 proposal, but are lookin we ceuld consider providing (free) g at an attractive alternate by which

,a' a hardened lock tight recorder module and selling a second module the owner could use flexibly. Still conceptual, but decisions will be madai by 15 September 1979.

A; e

9.

Tracking reports are provided to allow checking performance on SPft's.

I i

p

! believe the above steps.' complemented by the Preliminary Safety Ccncern

[

program which Don Roy is taking the lead for, will provide for accesp11shing excellent utt11zation of operating experience. The E. DeCarit ritviews will e

provide monitoring of actual realization. The follow-thru of the entire staff, but esycially Customer Service and E: gineering Departments, is~ needed to F,

achiem timely, higt: quality performance.

I will report on 1 October 1979 to close out the remaining incompletes, and

[

to inform you of our first month's experience.