.8;2.._
.m
,.... #.... e
~
O m._
t lTHESt.FCOCK&'dtt.CCXCOOY
~
d4.
^
POIER' GE!:ERATIO!I GROUP 2
To l J. H. MacMillan, Vice Prwsid it Nuclear Power Generation Division free R. E. Kestba. Manager Customer Service Department, NPGD (3469) ses **s.a
}.
Cust.
Fil* No.
[~
or het.
[
Svej. Service Sulletin/Use of Operating Emperience.
Date Pmgress Rc;tre of. Upgrade /.ctions September 4.1979 F
ga---.
t Your memo of 23 July 1979 on Service Sulletins requested I *.ake the lead in
(-
review of our procedures and practices on reportirg arid resolving sita I
problems; 1.e., how we use operating esperience.
i Sface this sector of our business had already had considerable review as part of our Key Irsues effort in January (Availability Upgrade - Issue 4.7), I can report completion of several elegients of action needed rather than recommen-dations. The status is summarized below P
1.
MPGD instruction (Rev. 7) was issued (20 August) to upgrade SPR harJ1tng including key points:
o fianager. Operating Plant Services or Startup Services (for MSS) responsible for ticaly initiation, technical quality and proper h
closecut. (Previously lower level support engineers chased this.)
i k
o Unit !'.anager sign-off for Engineering and Maintenance on adequacy f.
of ff'x a,ndf, accountabia action for cross-contract appilcab111ty.'
o BOP failures impacting M55 faciuded in Scope.
+
s 2.
.stanagement Directive (Deddens/Roy/Kostba) of 31 Aug;nt 1979 establisheJ
[
oriority levels and allowable time intervals for rvsponse.
t i
l E.
3.
Trainina programs for Rev. 7 NPGD 0503-04 completed in August.
j e conducted ' periodically on f
4.
Manacement review by DeCarif will b,e,. ion to the September / October isolementation giving special attent period so that we get off on the right track with the new instruction.
~.
l 5.
Funding arrangements to allow processing of SPR's have been agreed to t
in principio.for an interim period. Monthly reviews are planned to i
shake down the dollars management.
L a
2 hk.,"
8 Ex.
2R7298eRegggge, eg.p.
t
~
o e9 JJt. or i I 324 y g g--
F15 [6 9 5 7J i
'.)
- g-.
[
hl f-~
- ..,.. - s,~ ~m *- w ~ ~. ~.: - -
- )
_ wa.
. -.. 1 Y.,
t*)
r J. H. flacMillan 2-Segety9]
6.
Abnormal Transient Ocerating Guideline program is being funded by Owners Group. and is uncerway. These guidelines form a currently controlled baseline ofTur guidance to owner operations, and as such provide an r
exercised circuf t available for coenunicating changes which derive from w
operating experience.
t 7.
" Quick Look" evaluation of transients / reactor trips has been formulated as a pmgram under discussion with Owners Grouo. Scme Owners have accepted.
(
We will implement,on a risk basis and formal acceptance by Owners is expected within two weeks.
8.
Data Cs11ection for transients has been poor. For Quick Look we will be I
dependant on manual and phone data collecton. but our RECALL. (Logger) proposals. are expected to be out by mid-Septancer. We were scheduled T.
for 9/1/79 proposal, but are lookin we ceuld consider providing (free) g at an attractive alternate by which
,a' a hardened lock tight recorder module and selling a second module the owner could use flexibly. Still conceptual, but decisions will be madai by 15 September 1979.
A; e
9.
Tracking reports are provided to allow checking performance on SPft's.
I i
p
! believe the above steps.' complemented by the Preliminary Safety Ccncern
[
program which Don Roy is taking the lead for, will provide for accesp11shing excellent utt11zation of operating experience. The E. DeCarit ritviews will e
provide monitoring of actual realization. The follow-thru of the entire staff, but esycially Customer Service and E: gineering Departments, is~ needed to F,
achiem timely, higt: quality performance.
I will report on 1 October 1979 to close out the remaining incompletes, and
[
to inform you of our first month's experience.
l REX:vp G