ML20024B245
| ML20024B245 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/22/1983 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| REF-10CFR9.7 M830615A, NUDOCS 8307070553 | |
| Download: ML20024B245 (1) | |
Text
[praru IN RESPONSE, PLEASE
- o UNITED STATES REFER TO:
M830615A y
NUCLEAR REGULATORY COMMISSION 4g WASHINGTON, D.C. 20555 3
June 22, 1983 OF FICE OF THE SECRETARY MEMJRANDUM FOR:
William J.
Dircks, Execu.ive Director for Operations
)
FROM:
Samuel J.
Chilk, Secre
SUBJECT:
STAFF REQUIREMENTS - BR I G ON STATUS OF STAFF CERTIFICATION TMI-l RESTART
~
PROCEEDING, 10:00 A.M.
WEDNESDAY, JUNE 15, 1983, COMMISSIONERS' CONFERENCE ROOM, D.C.
OFFICE (OPEN TO PUBLIC ATTENDANCE)
The Commission was briefed by the staff on the status of items requiring completion at TMI-l prior to restart.
The Commission requested that 1.
Table 1 be revised to indicate specific inspection requirements and 2.
the staff provide an expanded version of Table 2 (Non-Certification Items) in a level of detail comparable to Table 1 (Restart Certification Items).
(NRR)
(SECY Suspense:
7/1/83)
The staff noted that a Notice of Proposed Finding on a "no significant hazards" determination was published for comment in May and that a final determination will be proposed for Commission concurrence around the end of June.
cc:
Chairman Palladino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts Commissioner Asselstine C mmission Staff Offices
/)
DR - Advance 4j DCS - 016 Phillips gts
/
[yyj3830622 PT9.7 PDR