ML20024B220

From kanterella
Jump to navigation Jump to search
Application by CC Faust for Reactor Operator License
ML20024B220
Person / Time
Site: Crane  
Issue date: 07/05/1977
From: Faust C
METROPOLITAN EDISON CO.
To: Collins P
Office of Nuclear Reactor Regulation
References
TASK-*, TASK-GB GPU-2300, NUDOCS 8307070363
Download: ML20024B220 (8)


Text

._

S 'G.

6flt d3eo

?M!fM]

uC

$Nk*a?

METROPOLITAN EDISON COMPANY wue:

-.u.

. v.ini.,. m c;ce u o.u.. o,

I POST OFFICE SOX 480 MIDD LETOWN. PENNSYLV ANI ' 17057 TELEPHONE 717 944-4041 July 5,1977 Mr. Paul F. Collins Chief Operator Licensing Branch

~

Directorate of Licensing ion l'uclear Regulatory Co-niss Washington, D.C.

20545 Ocar !!r. C.ollins, Please cor. sider this application for a Reactor Operator's License examination.

In accordance with Section 55.10 of 10CFR55, the following information is submitted:--

1.

flame:

Craig C. Faust RDil School House Road Middletown, PA 17057 29 - Citizen of the U.S.A. by birth'.

Aae:

Control Room Operator, lietropolitan Edison Company, Present Encloyment:

Three !4ile Island fluclear Station, Unit II.

2.

(A) Education:

1.

Shamokin Area High School (1957-1955) - Graduated - Shamokin, Pa.

2.

Shippensburg State College (1955-1955) - Did not graduate -

Shippensburg, Pa.

fluclear Power School (6 mo)(1957) - Graduated - Bainbridge, f!d.

3.

53G fiuclear Prototype Scho"o1 - Operations (6 mo)(1957) - Graduated -

4.

West Milton, fl.Y.

Research Reactor Training Program (1 wk)(1976) - Graduated -

5.

Penn State University, University Park, Pa.

2.

(B) Experience:

1.

U.S. Itavy Ity duties aboard the G.U. Carter consisted of being qualified as an Engine Room Supervisor, Repair Parts Petty Officer, Diesel !!ainten-i ance Petty Officer, 3M Cocrdinator Petty Officer, Secondary Petty 8307070363 770705 PDR ADOCK 05000289 HOL V..--.

255~.

2-s e-

,.;' :y G;f

. Paul F. Collins

- 35 1y 5,1977 P'8'ttr w

}/

2.

(B)

Experience:

1.

U.S. flavy (Con'd)

Officer and Itachine Tool Petty Officer.

I was also the Leading Petty Officer in my section during yard overhaul.

2.

Auxiliary Operator "A" Nuclear (12/5/73-9/I3/76) lietropolitan Edison Company, Three Mile Island Nuclear Station, Middletown, Pa.

My experience as an Auxiliary Operator "A" fluclear included studying systems and writing operating procedures and alarm responses.

I also -

operated systems and equipment for plant startup and acceptance

  • test-ing and performed switching and tagging.

3.

Control Room Operator-fluclear (9/13/769 resent) Metropolitan Edison Company, Three Mile Island Huclear Station, Unit II, Middletown, Pa.

Experience as a Control Room Operator-f;uclear consists of studying plant systems, writing operating procedures and system lectures, operating equipment and systmas for plant startup and acceptance tests, directing the efforts of others in this direction and perform-ing switching and tagging.

3.

Previous Operator's License - f!0flE.

4.

License is requested to operate a pressurized water reactor:

Metropolitan Edison Company, Three Mile Island fluclear Station, Unit II.

5.

See attached letter.

6.

See En' closure I..

7.

Itedical examination will be forwarded under separate cover.

Sincerely yours I

CCF:kmr Crai C. Faust Enclosures e

e 6

1

~ iM'O

'&. 4 '., WY

  • n?

ErlCLOSURE I

g.4 TRAlliIrlG PR03PAM P

[

RECEIVED BY:

Crain C. Faust The general outline of Mr. Faust's training follows:

1.

AUXILIARY OPERATOR "A" flVCLEAR TRAI!!IliG PROGRAM (3/4/74-8/26/74'(1040 hrs) a.

liath(8Qhrs) b.

Atomic physics (20 hrs) c.

iluclear Physics (60 hrs) d.

Reactor Operations and Kinetics (140 hrs) e.

Core Performance (60 hrs)

Plant Chemistry (40 hrs)(20 hrs) f.

fluclear. Instrumentation g.

h.

Radiation Protection (80 hrs) i.

Plant Operation (40 hrs) j.

Studied primary and secondary systems and operation thereof,on an 0JT basis,(500 hrs) 2.

REACTOR THEORY (9/13/76-9/27/76)(80 hrs)

This consisted basically of the ilUS Nuclear Energy Training (NET) lbdule 3 training program.

3.

PEtlN STATE REACTOR FAMILIARIZATIO.'l PROSRAM (10/11/76-10/15/76)(40 hrs) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> were devoted to instruction and operation'of Penn State University's TRIGA liark III Reactor.

I manipulated the controls-of this reactor through 10 meaningful startups and 12 power level changes or shutdowns.

4.

UtlIT II CR0 Afl0 AUXILIARY "A" OPEPATOR TRAINIrlG PROGRAM (11/1/76-11/24/76)

(120 hrs)

This course was presentied by the TMI Training Staff and covered primary and safety systems.

5.

UNIT II OJT PROGRAM (12/1/76-8/1/77)(Approx. 500 hrs)

This is an audited procedures arid systems training program stressing self study and oral testing.

6.

UNIT II CR0 PROGRAM EXTEt!SION (12/27/76-1/7/77)(80 hrs)

This course covered the following subjects:

a.

Integrated Control System b.

Health Physics c.

Plant Heatup, Startup and Shutdown Procedures d.

Emergency and Abnormal Procedures e.

Standard Tech Specs f.

Additional Systems training

, 55$5' Ur!IT II COLD LICE;;SE SIMULATOR CERTIFICATI0l1 TRAltlIflG (1/10/77-3/4/77)(320 hrs)

MW/

7.

Mr!.,

5?

This 8 week c'ourse was conducted by Babcock and Wilcox at their Lynchburg, Va. simulator training facility. A summary of the training I

.6,l7 received, examination results, and certification are attached as Enclosure y

~

I.

a.

fluclear Instrumentation b.

Reactor Protection System c.

Integrated Control System d.

Chemical Addition System e.

Cooling Water Systems TURBIllE CO?tTROLS TRAlllIliG COURSE (5/4/77-5/6/77)(20 hrs) 8.

This program was conducted on site by Westinghouse Electric Corporation and stressed operation of the Automatic Electro Hydraulic (AEH) turbine controls and turbine operation.

U; LIT II STAT!DARDIZED TECH SPEC TRAltlING PROGRAM (5/16/77-5/27/77)(40 hrs) 9.

This course covered primarily the Unit II Standardized Tech Specs.

Other subjects reviewed include:

a.

Procedures b.

ICS c.

Diamond Panel d.

Nuclear Instrumentation e.

Reactivity Balance f.

Operating History SIMULATOR TRAIllI!4G PROGRAM (6/27/77-7/1/77)(40 hrs) 10.

I will have completed a 1 week course in TMI Unit I'I operator training on the Babcock and Wilcox !!uclear Power Plant Simulator at Lynchburg, Va.

beford my licenss testing date.

PRE LICEllSE REVIEW COURSE (7/18/77-8/12/77)(80 hrs) 11.

I will have completed a 2 week review course before my license testing date.

I f

O e

.,,,.rw

--r

~,-

^ ~ ^ ^

1 Babcock & Wilcox u,,, c..,,,,:.,, c e e

P.o. Goa 12G0. Lyncatmarc,Va.24%S Telephaner (8046 384 5111 ihrch 18,1977 -

g Mr. Lex Tsaggaris Metropolit.n Edison Ca=pany Three Mi.le Isli =d Nucles: S;atinct P.O. Bcx 480 Middle:a.m, Pe=sylvania 17C57 8

Subject:

Cold License Training Certificatiot}

Dear Mr. Tsaggaris:

4 His letter is to report the % etion of Babcock 4 Wilecx's " Cold License" 1

Certificatica training preg:= cich has been ecaducted for Met cpolitsn Edisen C:x.p=y. The pre i_, cc. ducted by the Cm fr=a Jrmary 10 to

  • Marr.h 4,1977, consic,ted of an eight-week si=21ater operstica cotese.

Based en the perfer: nance of Myiduals en a shinted KRC licensing e%t cn and a startup, cr:1, and operating ex=:ination given at the d

end of the PhR si=11ater open.icas course, Eabcock 6 Wilecx certifies that the following r.en have A-=tr:ted sufficient be.<1ed;;e :nd perfer:nnnce-

.i capability to be considered to hzve extensive experience in !bclear Power l

Pht-Omer:tiens to be considered as eligible for " Cold License" examination j

at the "eacter Oper: tor level: E21 Ha m, Craig Faust, Mark,Colanan, R

~

Joe Cen;; den and no others.

.1

/

1 i

Sincerel yours, 6gdf C32AW

'n3 B' j*!

O I

([V/

4 S.

JICr/r,.Ahnsger N5E:jds Cptract Se:tices 4 Ccatrols cc:

P.F. Collihs Y

n uwwmemacemensa

. l s--

i t

-! ;0 5 1 31

/@F

Ar? m r s e

3

  • cock t,W1. leos eg,u,gA7Ig3 APPL D Fc3*, _

i U " lear D aising Center crn(c' rause Ro l X I gao Q g"p

. fcT-I ^

4IUanC: REFC:7 E DA m Metmeolit:n Fdison Ca:: nv Pres

",f,n To ef;

,g

__ g C2.7.5E EXRINCICI RESUI.TS MAuc.i EXN!DunCIS CPERAn;;G EVMICs Part I Part M oreran KEE:

ategory/cr=1,5 Cesde %

Crat.= 5 Veekly 38, *.

  • %,g '

I 84 g

34 g

n-g g

2 A

83 85 86 M

g g

c 2

72 u

u x.

x SS :

h; 4

D 73 y

g

,3 E

5 88 ;

85 y.

85 g

S s

3 6

F l

67y 92 90 M

g g

a 7

78 ;

M 73 5

3 3

i.a L;.mHCCCI EI;otDanct RES:I,Ts NRA A Ar.4 Cater, Crades cdg m

CP m n A 93 ! R 95 g c 84 g 's 93 i.9._3

, a o 79,.

3.r' y7R 89 T/d/77 a

P_ss C I Fail L I I

sE'rIca C*tes w Crade=

C"AD DA::

OPERATCR 11

_l.. Z J J J K J t, J GAw::GCa Pass U Tan U ormrnc m eanos t

TO

.I OPERATIC;3 4'- alsterec Lf:

I,nse A=tststere gf-3/2/77 l; s, 3;11a: *,

3fy}7 B. Stre::

2/23/7 N. Elliot:

Walustica

. W alwstion me.tua::ca Pn:: W Feil O Pe.sn C Feil C-p._=,. 1

,7,ty c 3 a

' cs.S.~2.GHCl ma ma -

m m ma ma sIcams:

l

.:c m as

.{. /.f ///,-l,{

lRECC

=tA i cm f-~~1 I ao l I sao t _ J n a ne.

r3n3,n SI 22:i'O l CC7IFICmCi i-l 4/j///,5,o 1s u ca m L 2._.J co i 1

m. s,m, :%

6 m

l:lC!/

10. 5 ! hi i

o SMW CF SDUL\\TC.1 COLD LICENSE TF.il:II;C

.a-~~

g i

1::=a Crai: F:ust 03:e3 y._e2.y 3 o ;9,7,,g.., reb 4, 1977 -

The training pregra:t cortsisted of 100 heurs of Si:=21 ster epersticas :nd ISO hours of clas:roca ti=e.

The 130' hours o'f classroom ti=c censis:ed of approxi==tely 141 hours0.00163 days <br />0.0392 hours <br />2.331349e-4 weeks <br />5.36505e-5 months <br /> of lectures and c =.=s with pprox!=n:ely 39 hours4.513889e-4 days <br />0.0108 hours <br />6.448413e-5 weeks <br />1.48395e-5 months <br /> allotted for scif study.

No. of Ti=es Evolutiens and E=e-eencies in t.hich Trainee Particiented Perfomed Reactor S::::up (Hot Shutdown, all Rods in, to 10'I hr-s 3

Reseter Startup (Hot Shu:down, S:fety, Rods out, to 10*I ):p...'..

R: actor Start :p (10*8 A :ps to 5 % Pcwe r)................i... )...-

A s..

10

,7-Res tor S::::up (51 Power to 15% Power)......................

6 Powe r Escals ti=n (15 % Power to 100% Pow r)....................

4 P1:n t Shutd::%n (1000 Power to 15% Pewc i...................,..

S Pir.nt

  • Shu:d:wn (15 % Pos.tr to liot Shutdu.n).. /..*......s. :....

4 P1:n t Cooldewn (ib t Shutda.m to Cold Shutdown)...... *.........

1 Reactor Trip Rec very 1

, Nercise Centrol Rods.........................................

o

-.lculate en ECP..............................................

S Calcula te a Sh:d im Mar;;in.... _.............................

1 Calculate a Soluble Peisen Change.....'........................

2 Fall Makeup Pt.. p..............................................

1 Fail Pres suri:cr Level Control Valve..........................

I Defeat !!eutron Error Signal fran ICS..........................

1 l

Stuck Control Rod.............................................

1 Dropped Rod.................*..................................

7 Fail Power R:nge NT...........................................

2 F:i1 Inte:r.edia te R:nge NI....................................

1 L

Re c: r Trip..................................................

Io i

Fail Selec cd TH I ns tn:=en t...................................

4.

Fail Selected T Ins t:inen t...................................

5 e

Fail ItC Flow Signal to ICS....................................

3 RC P'.x:p Trip..................................................

7 Fail Pressuri:cr Spray Valve Open..............................

3 Resc:or Coolen: Leak Inside Cen t ircen: Buildie;..............

5 Reac ter Coc1:nt Lenk in Lc:do.m Cooler........................

2

)

Re:cto r Cool:n t Lc:k in h keup Sys:cm.........................

1 0T50 Tube Rup 'are.............................................

2 S tea. t Lea k Inside Cent:irmen t Building........................

3 g

S tc=2 Lc k O.:::ide Centsi:=en: Euilding.......................

s Fail licader Pressure Si gn:1 to the ICS........................

2 Lc: king Pressuri:er Relief Valve..............................

2

~;il Pressuri:cr Level Signs 1.................................

1 f

.urbine Trip..................................................

2 Fa il Feede.n c r Pir-p t.P Low....................................

2 i

P1:nt!!catup (Cold shutdown to !!ot Shutdown)..................

1

{

[

r l /td!/ j ;051@

e e

i r

m Craig Faust Page 2

  • m Ib. of Time:s Perforr.ed Evolutions and Foercencies in t.hich Trainee Particle:ted g

Fa il 0r50 S tartup 1.cv=1 to ICS....................'............

4 2

Fail GTSO Operate Level to ICS................................

2 Loss o f Cend enser vacu::s.....................................

L F il Feedhoter Fle. SI:n:1 to ICS.............................

3 4

Trip Feedwater Pu=p..........................................

1 Lc :d Rej ectiert................................................

2 Degrr.de Feeduster h. p Sh:f t Speed D=.nd Signsi...............*

1 r

Fall "A" Feed ster Valve Closed...............................

1.

.,f. ail "A" Feedwater Valve 0 pen..................................

1 ral.3.

.se.,,,.....................................................

1 loss "y*of4RCP".......................*....................

I Fail Fe e6c ter Prp Disch:rge Valve Clo sed..... i..............

1 4

Dilut.to Criticality.........................................

r.

b i

I, F-w g,

V:.

c p

t-e h

m h

r Instructor

.N:.: clear 1runing Center Babcock G Wile =x Lynchburg, Virginis f

C

=

b ss e

e L

~

V N: in=;iM

( v/c!/

_J u_ _ - :.. = -

e,&

-