ML20024B184
| ML20024B184 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/17/1975 |
| From: | Kunder G METROPOLITAN EDISON CO. |
| To: | Seelinger J METROPOLITAN EDISON CO. |
| References | |
| TASK-01, TASK-1, TASK-GB GPU-2277, NUDOCS 8307070243 | |
| Download: ML20024B184 (2) | |
Text
GfW D1T
. - _..... -.. _-.........-........_.._.._.--...:--...~..--...._....._..-..
p,.
n
'Q: e,L.J 1.Mc l j.
+ fj u~~
7 METROPOLITAN EDISON COMPANY w, s o- % u, c_
r L
p ect Unit II C m:rol Room Operator M88 TH! fluclear Station Middletewn,Pa. 17057 b ^,,, _ Training em Unit !* N g,.,g. [ ' O,,, f. ', :,, Da
, flovenbergl7.1975 l
.h e
is All Shif t Sunervisors
' ',v
.. c,
Unit ! Shi": Forenen Unit !! Sht1t Forenen I
rc nart of thte Unit 11 Control Roon Operator's partial training, the Unit
!! CRO*s nave teen assigned to v.ork in the Unit I Control Roon from the period of
%ccaber 1,1975, enrough January 16, 1975. During this time they will work with e.ne Unit I Centrol T. con Operators in an effort to gain operational experience, t
opertise and to :enin applying the' theory and concepts learned in th! classroon
- s. raining progran.
The Unit II C ontrol Roon Operators will be divided into three shifts, and
.2111 rota te accor: n] to the attached schedule. The individuals assigned to the j
A, 3 and C shif ts a. e indicated on the attached schedule. flote that each shif t t
all be further die ided into two sections. L'hile one section is in the Control l
perfor-'ing the oractical or annlied portion of their training as a trainee,.
r e;o. :
1 tLe other section vill be preparing for their exanination by engaging in programed tudy which will te coordinated by Walt Perks, Unit II Shif t Foreman.
"hile on shif:, e,phasis should be placed on learninq and building expertise in the following a: eas of similarity between Unit I and Unit II:
g T:. Reactor Protection System.
'. Integra ted Control 5< sten.
2.
Control Rod Drive Systen E,ernency Procedures.
~
Reactor Rescanse.
7 E.,
flon '!uclear Instrumentation.
t F.
- lucicar Instrur entation.
2.
Ins trumenta tion In terpreta tion.
fleadings (i.e. niacinq oroaer enchasis on surveillinq control roon indications and plant narameter, both fron a frequency standpoint and from an importance factor standpoint.)
1:L Diesel Cenerators.
IL lfuclear Stean Suonly Syste,.
12 Control Roon Records and Logs relative to administrative nrocedure reruirements inpleaentation.
- 12. Conduct and Content of Tech. Spec. Serveillance.
AdministratiMy, Unit !! Control Roon Operators during the period that they gre assignarf to Un-*. I Control Room will be treated in the same nannce as the Unit
' trainees.
Ictieve, clarification of specific points, such as handlinq of over.
kine calloats, etc, will be discussed with the Brotherhood November 24 For pur-i,<3ses of shif t cha nSe, the shifts will be considered for the Unit !! CRO's to be gnanged at 2300 Sumday evenings.
INTER-OFFICE MEMORANDUM 8307070243 751117 l
PDR ADOCK 05000289 r
2 HOL T-j u r u 7 3 1.
g' c.- ( p. 5 o 9 1-
' {.
,n r-
,-h., -
n-._....,
.-. ~..
--..-.... w - -. ~..- -
-a e.
a.*
W Unit !! Control Rocn 0perator Novenbec 17' 1975 Training on Unit !
r L
As the everall intent of this progran is to provide in-death practical train-i ng for the Unit !! Control r. con Onerators, all attempts should be nade to integrate' he Unit !! CR3's into the Unit ! Operations in as nany aspects as possible. If any specific questions arise during the course of this on-shift training program $-
they should be brought to my attention pronptly so that a clarification can be o I
tained. (t! alt Perks should be contacted if any clarifications to the detailed course content is needed.)
[.
i
. A. Kunder Unit I Supervisor of Operations cc:
J. R. Floyd L
G. P. Miller l
J. J. Colitz R. O. Ea rl ey J. L. Seelinger -
a W. W. Perks 1
Unit II CR3's Unit I CRO's I
J. G. Iterbein Post in Unit I Control Roon File: GAK Writer's File i
1 i
_5 -. _ _._.,i > o '
///P nl# _. _3 2.
1 01
.