ML20024B184

From kanterella
Jump to navigation Jump to search
Notifies That as Part of Unit 2 Control Room Operator Partial Training,Unit 2 Control Room Operators Have Been Assigned to Work in Unit 1 Control Room from 751201-760116
ML20024B184
Person / Time
Site: Crane  Constellation icon.png
Issue date: 11/17/1975
From: Kunder G
METROPOLITAN EDISON CO.
To: Seelinger J
METROPOLITAN EDISON CO.
References
TASK-01, TASK-1, TASK-GB GPU-2277, NUDOCS 8307070243
Download: ML20024B184 (2)


Text

GfW D1T

. - _..... -.. _-.........-........_.._.._.--...:--...~..--...._....._..-..

p,.

n

'Q: e,L.J 1.Mc l j.

+ fj u~~

7 METROPOLITAN EDISON COMPANY w, s o- % u, c_

r L

p ect Unit II C m:rol Room Operator M88 TH! fluclear Station Middletewn,Pa. 17057 b ^,,, _ Training em Unit !* N g,.,g. [ ' O,,, f. ',  :,, Da

, flovenbergl7.1975 l

.h e

is All Shif t Sunervisors

' ',v

.. c,

Unit ! Shi": Forenen Unit !! Sht1t Forenen I

rc nart of thte Unit 11 Control Roon Operator's partial training, the Unit

!! CRO*s nave teen assigned to v.ork in the Unit I Control Roon from the period of

%ccaber 1,1975, enrough January 16, 1975. During this time they will work with e.ne Unit I Centrol T. con Operators in an effort to gain operational experience, t

opertise and to :enin applying the' theory and concepts learned in th! classroon

s. raining progran.

The Unit II C ontrol Roon Operators will be divided into three shifts, and

.2111 rota te accor: n] to the attached schedule. The individuals assigned to the j

A, 3 and C shif ts a. e indicated on the attached schedule. flote that each shif t t

all be further die ided into two sections. L'hile one section is in the Control l

perfor-'ing the oractical or annlied portion of their training as a trainee,.

r e;o. :

1 tLe other section vill be preparing for their exanination by engaging in programed tudy which will te coordinated by Walt Perks, Unit II Shif t Foreman.

"hile on shif:, e,phasis should be placed on learninq and building expertise in the following a: eas of similarity between Unit I and Unit II:

g T:. Reactor Protection System.

'. Integra ted Control 5< sten.

2.

Control Rod Drive Systen E,ernency Procedures.

~

Reactor Rescanse.

7 E.,

flon '!uclear Instrumentation.

t F.

  • lucicar Instrur entation.

2.

Ins trumenta tion In terpreta tion.

fleadings (i.e. niacinq oroaer enchasis on surveillinq control roon indications and plant narameter, both fron a frequency standpoint and from an importance factor standpoint.)

1:L Diesel Cenerators.

IL lfuclear Stean Suonly Syste,.

12 Control Roon Records and Logs relative to administrative nrocedure reruirements inpleaentation.

12. Conduct and Content of Tech. Spec. Serveillance.

AdministratiMy, Unit !! Control Roon Operators during the period that they gre assignarf to Un-*. I Control Room will be treated in the same nannce as the Unit

' trainees.

Ictieve, clarification of specific points, such as handlinq of over.

kine calloats, etc, will be discussed with the Brotherhood November 24 For pur-i,<3ses of shif t cha nSe, the shifts will be considered for the Unit !! CRO's to be gnanged at 2300 Sumday evenings.

INTER-OFFICE MEMORANDUM 8307070243 751117 l

PDR ADOCK 05000289 r

2 HOL T-j u r u 7 3 1.

g' c.- ( p. 5 o 9 1-

' {.

,n r-

,-h., -

n-._....,

.-. ~..

--..-.... w - -. ~..- -

-a e.

a.*

W Unit !! Control Rocn 0perator Novenbec 17' 1975 Training on Unit !

r L

As the everall intent of this progran is to provide in-death practical train-i ng for the Unit !! Control r. con Onerators, all attempts should be nade to integrate' he Unit !! CR3's into the Unit ! Operations in as nany aspects as possible. If any specific questions arise during the course of this on-shift training program $-

they should be brought to my attention pronptly so that a clarification can be o I

tained. (t! alt Perks should be contacted if any clarifications to the detailed course content is needed.)

[.

i

. A. Kunder Unit I Supervisor of Operations cc:

J. R. Floyd L

G. P. Miller l

J. J. Colitz R. O. Ea rl ey J. L. Seelinger -

a W. W. Perks 1

Unit II CR3's Unit I CRO's I

J. G. Iterbein Post in Unit I Control Roon File: GAK Writer's File i

1 i

_5 -. _ _._.,i > o '

///P nl# _. _3 2.

1 01

.