| Download: ML20024B012 (5) | |
Text
, g l C ' 4 / / f y ( B l r. T A v.
Ty.3 d U O
Cetq q p/a e, 3j%.w b$$E..'I,~,.}h n:e..s-;.n 6 4.
}
d r== n
$Nb h f1f.$ !
~
m m.; w n a u.
r;- 1.'.A. 07k'ICC DESIGN ca m 3I^
OEc 31965 u:::-ia t37 y=-
m::.$ h/
p'TJ0 LEAR FO'a3 MT we.:w. red FOR x:ma0FOLITAu IDISO3 CC;GANY READING, PUCCYLVANIA GPO
.lleft. Exh. For 10 I)/
M *:. S Charles Shapiro CSR gg[p/g Poyle Reporting Inc.
O
,1
,s-10 651126 UO1267
$$h bD K 05000M HOL P
~
QQ'r,,.-...,c r.
~ ~ -- ~. :...:.; L,,t;,a5yg e...
~
$. r c.
.g,,.,,
h 7/
f '.'
T,,'- M Lral CCh'IE2]
t Pace Title Section general Instructions aM MMd 1.0 GCoPe et k'ork 2.0 8*3,g,1, ge stes 30 Data Required with Proposal and Gwantees 4.0 50
. q.
8 e
9 e
e e
O 6
8 e
e e
e t
e 4
e e
e e
ee 4
e e
U 1268 0
e 9
e e
s 6 e e
s
jyt a
11A6/65
~
DIGIGN CalTI3IA - NUCLEAR PO*ca PLANT
((j;1 ;.' p e
( T dii$f-"* f h :!
i Metropolitan Edison Co=pany k k hL p @. M" 4 i.
Randing, pa.
bh kl 311s outlino is intended to serve as a guido for designers and bidders of catcrial end equi =.cnt which vill constitute a licensecbic sad I
operable nucicer pover plant. The criteria aro brocd in cccpc and cre intended to encourcgo ingenuity and resourecfulaces whi.le at the same time ccching a hich decree of plant availability. Tho impcrtence of unit respon-citility 10 recocniced if opticca econo:r,y cud relicbilit.y of service cro to be cchicved. Under these conditions, this rosponsibility is properly that of the Operator and his agents -- in this case, Ectropolitan Edison Cocpcay.
1.0 - Cencrcl Instructions and Ipprer.ch The plant shall be licenacable at warranty rating. Ecactor verrcnty chall include steam flow and steem conditions based on entering fcedvater tc=peratureaEdstatedburn-uprate. Turbine verranty shcIl include capacity on a valyc:-vide-open basis and heat rato cdjusted for ccadenser back pressure at eny period during the year. Turbine size shall match the maximum capability of the reactor.
Turbine generator desian shall be bcsed on a varrcnted valves-wide-open cepscity of 650-750 W at 07 make up, 2 5" Es f. back pressure, full e:xtraction end 0 9 power factor.
Eccctor denica shc11 be based ca either a prescurized water or boiling water primary system.
The bidders shall quote as a base bid a Nuclenr Isicsd consisting of a ec=pletc nuclear steam supply system, cnd its associated buildings and equipment, es defined by systc=s in Section 2'.0, Scope of Werk. Alternate quotaticna for an equip = cat package covering the nuclear stes:a supply system' l
including cuxilicry syntess cocponents and a turnkey.pl:nt are also requested.
The bidder chall stetc the maximum guaranteca stoca ficv at normal throttle conditions and feedvater tesperature, based on the Nuclear Island or equiscant pachece alternatives.
9 UO1269 e
.,...-y.
~~
i N).D.r,,7f,f G5
',h.!(in,
"-G a d ;;
g o..
j; T7 If The scheduled date for ccezercial operction is June 1,1771, ac qd,.
on c contract cocmitment of June 1,1%7. Therefore the scheduling cnd delivery of !*uclect Island cc=ponents, enginecring information end services l
chcll bo in accordance with the overall achedule and critical path network l' acre to be submitted with the plcat specification.
In concral, the division of recpensibility by cyctc=s as noted in Section 2.0 includes encincering, procurc=ent varchousing, construction, test cnd ctertup by the contractor with the recponsibility for overall project planninc resting with the Ovncr. Tho contractor chc11 defino the cyctcm requirencats for the Nuclecr Island incofer as they cffcet the Turbino Islend 1.yctem parc=ctcra and cherccteristics in accordance with the overall project cchedulo noted above. Interfact connections, structure 1, electrical and ccchanicci,.muct bo leccted by mutual ecrec=cnt with the owner. Ovnor vill clao rurnich curvey service to estchlish one base line and bench scrk for cach "nuclect isicad" building.
Increcced costs within the Turbine Island scope caused by aEC or Contrcetor Revisions with regard to the Nuclear Island shall bo borno by the Nuclear Island Contractor.
It is anticipcted that construction scncaczent for the overc11 plant vould be handled by a single organization selected by the Ovner. The Contrcctor sh:11 cooperate with the Owner for the provision and arrcnge=ent of tc ecrcry construction facilities in order to limit their duplication. The Ovner vill provide an overall plan of the sLte, delineating varehouse, open storcde, pcrking areas, etc., conti uous with the requirc=cata of the various G
contrcetors. Ibrthemore, the schedule vill be established so as to permit c:ultiple conctruction subcontracts, in order to take adventcco of ccepctitive biddinc for each phetse of the work (such as structural stcci, piping or gencrclbuildingconctruction).
Responsibility for inspection and quality control of Nuclear Island syctc=.s vould rc=:in with the Euclect Island contractor so as to assure that his E.ucrentcca can be cet.
2
' U 1270 -
O G
, d ',,
i,,.9.
i,.
~ ~ ' ~
.,y l ;-
e
?
' 4 -, [$ g' p
~.g s:;;d.,encigccriQ mr(
f.
um;.r-.
The plcnt shan bc designed in accordance with.Eco practico consistent with that used for the most recently built Met. Ed encra-ticc units.
The plant chnll ba built in accordance with good construction practico, includin; r.dequt.to supervision and tents to ascure a'high level of quclity con-trol.
Ibnsac=cnt of construction vill be by the Owner or his deciCncted
- cgent. All contractors and suppliers chall be respos:1ble for establishing and caintaining a schedule utilizing Critical Path Xcthed under the overall l
direction end cupervision of the Construction F. nsger.
The plant shall receive sufficient architectural treat = cat to provide a pleasing appecrcnco consistent with other Met-Ed property.
The plant shall be of indoor desi6n using insulated siding, except vhere othervice specified, and should be crranged for future expansion.
l Plcat auxilicry equipment chen be designed for c:.rrying maxi =um plant r:. tics cerresponding to scximum capability of the reactor.
l l
Standby units shan be provided for rotating ouxilicry equipc:ent, the loss of which could result in either a forced dcratinc or e shutdown.
One set of spara rotating elcacnts shall bo provided for this equip =cnt.
Spare motors win be provided for such equipsent having a rating of 20 hp '
or less, except as noted.
e l
During the plant te: ting and etetup pcried, a n:utuclly agreed upon test procedurc will be under the direct supervision of the Uucicer Island turnhey contrcctor. The responsibility for satisfactorily ccepleting the tent program, vill ba divided in accordance with the estchliched system secpc division. During plant testing and stortup an op:rc!.ing personnel vin te provided by the Owner. All instructions for plcat operation sa
~
required by the test progra:n vill be channeled throup the Owncr's supervisory operating personnel.
~
- s e