Submits Task Description to TMI-2 Concerns Re Main Feedwater Sys Reliability.Task Will Analyze Operating Plant Data & Perform Reliability Analysis to Improve Availability & Reduce Challenges to RPS & Protection Sys
ML20024A961
Person / Time
Site: Crane  
Issue date: 01/27/1981
From:
GENERAL PUBLIC UTILITIES CORP.
To:
GENERAL PUBLIC UTILITIES CORP.
References
TASK-03, TASK-3, TASK-GB GPU-0037, GPU-37, NUDOCS 8307010229
Download: ML20024A961 (2)


Text

-

l_

4. _.

(>*

g

~

RESPONSE TO THI-2 CONCERNS trp O'

TASK DESCRIPTION i. tITi L. e R

~ l l

TITLE: MAIN FEEDWATER SYSTEM RELIABILITY LEAD SECTION HGR.:

E. A. WDMAC_K, C

1.

OBJECTIVE:'

THE PURPOSE OF THIS TASK IS TO ANALYZE OPERATIriG PLANT DATA.

bl,1 i

l AND TO PERFORM A RELIABILITY ANALYSIS OF THE MAIN FEEDWATER L-SYSTEM IN ORDER TO IMPROVE AVAILABILITY AND TO REDUCE CHAU.ENGES l

TO THE RPS AND PROTECTION SYSTEMS.

lJ

?

l THE DELIVERABLE PRODUCTS FOR THIS TASK ARE PROGRESS REPORTS AND 1

A FINAL TECHilICAL REPORT WHICH WILL SUMMARIZE AND DESCRIBE IN DETAIL THE FINDIriGS AND RECO.vEtiDATIONS. A BOP CRITERIA DOCUMENT f*

2 WILL BE PREPARED FOR B&W NSSS.

2.

BACKGROUtiD:

tiRC/ACRS POST TMI-2 IriCIDENT REVIEW OF FEEDWATER SYSTEMS AND THEIR RELIABILITY IriDICATE THAT UPSETS IN THE MA.IN FEEDWATER 1

3 m,, "1EM OF_.P&M.,Py"UESULT_IN.F. ORE FREQUENT AND MORE SERIOUS t

CHALLENGES TO THE RPS Arid SAFETY SYSTEMS THAN IN PWR COMPETITOR ~

PLANTS. RESULTS TO DATE TROM THE OPERATING PLANT DATA INDICATE THAT THERE ARE A LARGE tiUMSER OF FEEDWATER SYSTEM UPSETS (64 0F A

yg 246 REACTOR TRIPS A'lALYZED) THAT LEAD TO REACTOR TRIPS AND f,,

g g ph jn NALLENGES TO THE SAFETY SYSTEM. THE OPERATING PLANT DATA I

75. O I N.50 INDICATE THAT SIGNIFICANT bet". FITS IN AVAILABILITY CAN Charles Shapiro CSR i

Doyle Reacrting Inc.

BE ACHIEVED THROUGH IMPROVEMENTS IN MAIN FEED WATER SYSTEM l h"7 RELIABILITY.

I O 4-j 3.

PROBLEM DEFINITION:

THE LONG TERM (WEEKS + MONTHS WITHOUT SIGNIFICANT UPSET)

O RELIABILITY '0F THE MAlti FEEDWATER SYSTEM (INCLUDING CONDENSER.

i HOTWELL CONDENSATE SYSTEM AND THE MAI!I FEEDWATER SYSTEM) CAN J

J 3 - --

~

3 8307010229 810127

?? --?

PDR ADOCK 05000209 p

HOL r

aj ii

'_ L. _.. :. -

,G1 U I -}{

y,

BE SIGNIFICN RLY IMPROVED BY A SYSTEMATIC.dLIABILITY AliALYSIS o

AND BY SYSTEMATIC REVIEW AND Af,iALYSIS OF OPERATING PLANT DATA.

j :,W.

'"'S '^5 ' "I' ' '"" "' "^* " ^"^ 5 ' S (5 '" 'S '^ ""'-

b:~ %

O

~

MULTIPLE FAILURES, OR UPSETS OF ALL OR COMSINATI0 tis OF EQUIPMENT)

THOSE FEEDWATER SYSTEM COMPONENTS MOST VULtiERABLE BY DESIGN,

{

l OPERAT10 tis, ARRANGEMEfiT ETC. TO MISOPERATION, AliD WILL CONARE O'

i "THE RESULTS OF THE RELIABILITY ANALYSIS WITH OPERATIfiG PLANT -

-l DATA TO' ESTABLISH THE MOST PRODUCTIVE IMPROVEMENTS.

r 4.

ACTION PLAN:

PLEASE REFER TO ATTACn1 TENT 1.

5.

SCHEDULE:

OVEitALL TASK 18 HONTHS.

SEE-ATTACHMENT 2 FOR t'ETAILS.

[

i 6.

RESPONSIBLE ENGINEER:

J.D. CARLT0fi TO DELEGATE h. RESPONSIBLE 7

PM/ORGANI-ZATION:

177 OWNER'S GROUP / SERVICES PROJECT MAliAGEMENT.

.. a :....

.a==~-

w._..

- _.SUPPunT OR-

~~ ~

8.

GAli!ZATIONS:

PLANT INTEGRATION SAFETY #iALYSIS TECH STAFF ECCS GI COMPO!iENT EliGIliEERING 9.

REFERE!!CES:

1.

OPERATING PLANT DATA C

2.

CUSTOMERS AS BUILT DESIGN AND PERFORMA! ICE CHARACTERISTICS O