ML20024A944

From kanterella
Jump to navigation Jump to search
Submits TMI-2 Concerns Task Description Re Definition & Implementation of Hardware &/Or Procedures That Will Enhance post-trip Control of B&W NSS
ML20024A944
Person / Time
Site: Crane  
Issue date: 01/27/1981
From:
GENERAL PUBLIC UTILITIES CORP.
To:
GENERAL PUBLIC UTILITIES CORP.
References
TASK-*, TASK-GB GPU-0036, GPU-36, NUDOCS 8307010212
Download: ML20024A944 (2)


Text

i r

g

  • ~

~

Q \\e

,CVI !

.. ) Yi i.d.

RESPONSE TO til-2 CONCERNS TASK DESCRIPTION.

..yp Q

7:;#

7-SYSTDi DTNAMIC RESPONSE L

~

LEAD SECTION HCR.: E. A. WOMACE TITLE: FOST TRIP CONIROL C

~

TO DEFINE AND IXPLDENT HARDWARE AND/OR PROCEDURES THAT WII I.

OBJECIIVE:

). -

ENHANCE THE POST TRIP CONTROL OF THE B&W NSS.

NUREG-0560, THE NRC/ACRS. AND OPERATING PLA'IT DATA HAVE INDICATED 2.

BACEGROUND:

THAT THE ' RESPONSE OF THE B&W NSS FOLLOWING A REACIOR TRIP IS CHARACTERIZED BT WIDE VARIATIONS Di SYSTDi PARAMETERS INCIRD PRESSURE (STEAM AND RCS) AND LEVEL (PRESSURIZER AND ST IN HANY D; STANCES. THE OPERATORS INITIATE HPI TO MADhAIN PRESS RIZER LEVEL AND PRISSURE.

s O

3.

PROBLDi THE NSS PERFOR".ANCE FOR VARICUS INITIAL CONDITIONS. IS NOT DI DEFINITION:

..F""..UUH TEE DESICV ASSUMP_TIONS._ _ - _. THI.S TASE WILL

~

ACTUAL OPERATING BEHAVIOR OF THE NSS EQUIPMENT AND DEVELOP ME POR PROVIDING SN00TH POST TRIP CONTRC4. OF THE. PRESSURIZER AN I

STEAM CEN.ERATOR PARATInS.

4.

ACTION PLAN:

A) CATHER PLAhr SPECIFIC PERFOR2W;CE DATA. -(IN PARIICULAR, STEAM i

~

SAFETT VALVE. AND TURRINE BYPASS VALVE CONTROL CHARACTERISTIC

3) IMPROVE PT-IV MODEL FOR TRIP AND POST TRIP LOW POWM ANALYSTS C) DEPINE TARGET POST-TRIP CONTROL, CRITERIA.

D) LIST CANDIDATE CONTROL IMPROVD!Eh*I TECHNIQUES, J

E) PERFORM ANALYSES, COMPARE RISL"LTS VITH TARCET ACCEPTANCE CRITERIA.

.O P) PREPARE IrrtRIM REPORT - DISCUSS WITH CUSTOMERS.

C) PREPARE B&W STANDARD DESIGN FOR POST-TRIP CONTROL.

(r f O

~

36

~

eeft. Exh.For 19

..,_ m 00yle Reporting Inc. g Q

~011arles Shapiro CSR 8307010212 s10127

--.... m...

C-DR ADOCK 05000 89 p

[L e

.. _ _ _ _ ~

a i

, i.;.

S IM.

s RECEIVE CUSTCMER (177) COMMENTS (ON F).

,iDT H) l FREPARE FINAL 177 NSS POSI-TRIP CONTROL REPORT.

.'O O-I)

J) PREPARE PLA'TT SPECIFIC CHANGE PACKACE.

E 'i-i 7

~

,1

,i J.

K) PROCCRE NECESSART HARDWARE.

a L) PREPARO APP?.DPRIATE PROCEDURES AS REQUIRED.

O M) CHECE OUT EQUIF.'fDIT AND PROCEDURE.

3) RELEASE TO CUSTOMER.

3.

SCHEDULE:

1) ACTION ITDiS A-C

-9 HOS.

1 TEAR

2) ESTIMATED SCHEDULE, ACTION ITDiS G-N 1

t 6.

RESPONSIBLE

. DiCINEER:

L. L. JOTNER 7.

RESPONSIBLE PM/0RCANI-O ZATION:

1. E. WASCEER/NCCLEAR SERVICE EICEFI ITDi G WHICE IS STD FLANT.

W 1

a h-a=..--

u____..

8.

SUPPORT 01-7 CANIZATIONS:PIRiT INIICRATIO3 SAFETT ANALYSIS ECCS ANALYSIS E.

s C&I G

f RAILEY CDNTROLS 1

i 3.

REFERDICES n.

J O

t 4

\\

l

.. :.". g g

i1 1

ll l

r-

!