Forwards Addendum I to Polar Crane Load Test SER for Review Addendum Incorporates Responses to NRC & Other Comments Re Load Test & Operating Procedures.Changes Discussed.W/O Encl
ML20024A684
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/17/1983
From: Kanga B
GENERAL PUBLIC UTILITIES CORP.
To: Barrett L
Office of Nuclear Reactor Regulation
References
4410-83-L-0118, 4410-83-L-118, NUDOCS 8306220054
Download: ML20024A684 (2)


Text

'

O GPU Nuclear Corporation L Nuclear

= = :rs = 8o 8

Middletown, Pennsylvania 17057 717 944-7621 TELEX 84-2386 Wnter"s Direct Dial Number:

June 17, 1983 4410-83-L-0118 m

n Si E

F 2C z

TMI Program Office

.g-S-

Attn: Mr. L. H. Barrett 58 Deputy Program Director D

US Nuclcar Regulatory Comission EG M

c/o Three Mile Island Nuclear Station Middletown, PA 17057 y

5

Dear Sir:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Polar Crane Ioad Test SER Attached for your review and cmment is Addonrhrn I to the Polar Crane Ioad Test Safety Evaluation Report (SER).

The purpose of this addendum is to update the subject SER to incorporate changes which have taken place as a consequence of responses to NRC and other coments regarding the Ioad Test Procedure and the Operating Procedure.

A discussion of the changes follows.

(The numbering used below corresponds with that used in the SER.)

Section 2.4 Disassembly of Test Inad. The load test frame may be stored along with the missile shields on top of the "B" D-Ring. The safety aspects of this activity are totally enveloped by the evaluation done for the dropping of a missile shield.

Figure 2.3-1 Path of Test Ioad Assembly. A 45 rotation evolution has been added to the test procedure during the m vement of the full test load to verify hook rotation.

Figures 2.4-2 and 2.4-3 load Path of Reactor Missile Shield Blocks to Storage Iocation after Completion of load Test. The load path has been modified such that the shield blocks are moved in a counter-clockwise direction rather than the clockwise direction as presently shown. The safe load path has been evaluated and expanded slightly in the vicinity of the enclosed stairwell to accomodate the revised load path of the reactor missile shields. Please refer to drawings 2-P09-MH04, Revision 0, and 2-P09-MH02, Revision 1, attached.

8306220054 830617 0%

PDR ADOCK 05000320 P

PDR GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

~j m-1 Mr. L', H. Barrett 4410-83-L-0118 Figure 3.3-1 Ioad Test Rigging (complete assembly). The load test rigging has been revised to incorporate load egmNing members-at each corner of

.the frame. Please refer to drawing 2-C0P-1302, Revision 2, attached.

Figure 3.3-2 Missile Shield Rigging (cceplete assembly). The missile shield rigging has been revised to incorporate design developments as shown on drawing 2-COP-1302, Revision 3, attached.

Figure 4.2-1, 4.2-2, and 4.2-3 Potential Ioad Inpact Areas. The safe load path has been slightly expanded in the area between the "B" D-Ring and the enclosed stairwell to accamodate the revised path for placement of the reactor missile shields. Please refer to revised figures 4.2-1, 4.2-2, and 4.2-3, attached.

If you have any questions or desire further information, please contact' Mr. J. J. Byrne of my staff.

Sincerely, B. K. Kanga Director, IMI-2 BKK/RBS/jep Attachment s

CC: Dr. B. J. Snyder, Program Director - IMI Program Office

.