PLA-1702, Forwards Susquehanna Steam Electric Station Unit 1 Startup Rept, Per Tech Spec Section 6.9.1.1.Supplemental Rept Will Be Submitted within 90 Days
(Redirected from ML20024A378)
| ML20024A378 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/10/1983 |
| From: | Kenyon B PENNSYLVANIA POWER & LIGHT CO. |
| To: | Allan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML17139B588 | List: |
| References | |
| PLA-1702, NUDOCS 8306170188 | |
| Download: ML20024A378 (1) | |
Text
_
PPat Pennsylvania Power & Light Company Two North Ninth Street
- Allentown, PA 18101
- 215 / 770'5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 JUN 101983 Mr. James M. Allan Acting Regional Administrator-Region I U.S. Nuclear Regulatory Conunission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION STARTUP REPORT ER 100450 FILE 841 PLA-1702 Docket No. 50-387
Dear Mr. Allan:
Two copies of the Susquehanna SES Unit 1 Startup Report are attached. This report is submitted nine months following initial criticality in accordance with Technical Specifications Section 6.9.1.1.
A supplemental report will be submitted within 90 days.
Very truly yours, NJ.x s
B. D. Kenyon Vice President-Nuclear Operations Attachment cc:
Mr. R. C. DeYoung, Director Office of Inspection and Enforcement 7
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn: Document Control Desk (36 copies)
Mr. G. Rhoads - NRC Mr. R. Perch - NRC i
8306170188 830610 PDR ADOCH 05000387 p
PDR g6O' l (
-